Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.
Showing the controlling passages directly. (daily question limit reached — showing passages)
UFS 3-530-01 05 June 2026 UNIFIED FACILITIES SUPPLEMENT (UFS) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED INTERIOR AND EXTERIOR LIGHTING SYSTEMS UFS 3-530-01 05 June 2026 FOREWORD Unified Facilities Supplements (UFS) provide non-mandatory, supplemental information in support of Unified Facilities Criteria (UFC). Only UFC establish enforceable criteria. UFS are For Information Only (FIO) and exist to help users understand and apply UFC requirements. The purpose of UFS is to offer procedural guidance, best practices, lessons learned, examples, and explanatory materials that clarify how to meet UFC criteria. They may include step-by-step procedures, checklists, illustrations, or decision aids, but they do not create new requirements or modify UFC content. UFS are developed by Discipli
inate luminaire locations with equipment. • Calculation points within the equipment footprint may be removed. UFS 3-530-01 05 June 2026 11 1-1.6 Restrooms. 1-1.6.1 Control Requirements. Manual Control For single-occupancy restrooms only: one wallbox switch Occupancy/Vacancy Automatic ON with automatic full OFF after 20 minutes of vacancy Time Schedule Scheduled full OFF when building is scheduled to be vacant unless occupants enter the building, then use Manual Control and Occupancy/Vacancy sensor criteria Daylight Automatic responsive daylight dimming when daylight is present Zoning None required UFS 3-530-01 05 June 2026 12 1-1.6.2 Performance Requirements. Target Criteria Daytime/Nighttime Average Horizontal Illuminance, General 5 fc (50 lux) at floor Average Horizontal Illuminance, Fix
um 1-1.4.3 Critical Design Issues. • Lighting controls, including occupancy and vacancy sensors, should account for the shelving and layout of the room. UFS 3-530-01 05 June 2026 9 1-1.5 Mechanical Rooms. 1-1.5.1 Control Requirements. Manual Control A minimum of one wallbox switch at each room entrance Occupancy/Vacancy None required Time Schedule None required Daylight Automatic responsive daylight dimming when daylight is present Zoning None required 1-1.5.2 Performance Requirements. Target Criteria Daytime/Nighttime Average Horizontal Illuminance 20 fc (200 lux) at 3’-6” (1067 mm) AFF Horizontal Illuminance Uniformity 3:1 average to minimum UFS 3-530-01 05 June 2026 10 1-1.5.3 Critical Design Issues. • Coordinate luminaire locations with equipment. • Calculation points within the equipm
DoD High Risk Personnel (HRP) UFC 3-530-01 Interior and Exterior Lighting Systems UFC 3-600-01 Fire Protection Engineering for Facilities UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings UFC 4-010-02 DoD Minimum Antiterrorism Standoff Distances for Buildings (FOUO) [Inactive] UFC 4-020-01 DoD Security Engineering Facilities Planning Manual UFC 4-021-02 Electronic Security Systems UFC 4-022-01 Security Engineering: Entry Control Facilities / Access Control Points UFC 4-022-02 Selection and Application of Vehicle Barriers UFC 4-026-01 Design to Resist Forced Entry UFS 4-023-07 Design to Resist Direct Fire Weapons Effects DoD 0.2000.12-H, DoD Antiterrorism Handbook UFS 4-010-03 3 February 2026 68 DEPARTMENT OF STATE United States Department of State Overseas Security Advisory Co
aircraft maintained. Aircraft inspection occurs within the maintenance hangar. Table 7.2.38. Building Utility System Requirements for Maintenance Support Facility. System Requirements Mechanical Proper ventilation system and energy efficient HVAC system are required. Repair and reclamation shop requires 150-psi shop air and corrosion resistant drains. Applicable criteria include UFC 3-401-01 for mechanical. Electrical Industrial equipment typically requires 240- and 480-volt, three-phase electrical current. Use commercial grade convenience receptacles and special power outlets. Applicable criteria include UFC 3-501-01 for general electrical requirements, UFC 3-520-01 for interior electrical systems requirements, UFC 3-530-01 for interior and exterior lighting and controls requirements, UF
lity criteria. Here is an example from UFC 3-530-01: “This UFC applies to interior or exterior lighting systems for construction, repair, and maintenance projects.” 3-3.5.1 Facility, Building or System Type. Facility, building or system type typically follows the title of the criteria. In some cases, it may be necessary to include modifiers such as temporary, semi-permanent, non- permanent facilities that support Military Operations or non-DoD Tenant Buildings on DoD Installations. 3-3.5.2 Triggers or Exceptions. In some cases it may be required to include applicable triggers or exceptions in the applicability. Typical examples are: • Effective date UFS 1-300-01 14 January 2026 20 • Location (example: CONUS, OCONUS, within or outside the United States and its territories) • Occupancy (exam
ption. FORMAT DATA TYPE/SIZE NOTES/REMARKS 05 530-FCS-IMAGE 10 530-STOCK-NUMBER PIC X(15) 10 530-SYS-DESIG PIC X(02) 10 530-WAREHOUSE-LOCATION PIC X(11) 10 530-DEAD-LOCATION-FLAG PIC X(01) 05 530-WAREHOUSE-INPUT 10 530-VALID-FLAG PIC X(01) 10 530-WLC PIC X(01) 05 530-RESERVED PIC X(06) 11.23. CIC 1RS EIC Header (531). 11.23.1. Purpose. To maintain the beginning and ending warehouse locations and the system designator of its member records. 11.23.1.1. Access. This record is accessed via DMSCALC using the 531-CALC-Key. It is also the owner of the CIC-INV set. 531-CALC-Key consists of the following: 11.23.1.1.1. For Report R12, DOLI option only:AFH23-123V2PT2 8 AUGUST 2013 653 11.23.1.1.1.1. Positions 1-4 = DOLI 11.23.1.1.1.2. Positions 12-15 = DOLI 11.23.1.1.1.3. Positions 23-24 = System Des
may also be necessary to provide additional task lighting in the ID and inspection areas to support adequate identification of vehicle occupants and contents. Such lighting must be directed transverse to the roadway; it will then illuminate the roadway in front of the gatehouse, the driver, and the guard. Under-Vehicle Inspection Lighting. 5-9.3.1 Per UFC 3-530-01, lighting may also be mounted at or below pavement level to facilitate under vehicle inspection. The system must eliminate shadows and create contrast. CONSTRUCTION PHASING. 5-10 If the project involves the modification of an existing ECF/ACP, pay considerable attention to the phasing of construction. In most cases, it is desirable to minimize the interruption of the ECF/ACP operations especially during periods of peak demand. UF
NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.