UFS 3-490-06 as of 2026-06-05 · official source ↗

UFS 3-490-06 5 June 2026 UNIFIED FACILITIES (UFS) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED ELEVATORS UFS 3-490-06 5 June 2026 FOREWORD Unified Facilities Supplements (UFS) provide non-mandatory, supplemental information in support of Unified Facilities Criteria (UFC). Only UFC establish enforceable criteria. UFS are For Information Only (FIO) and exist to help users understand and apply UFC requirements. The purpose of UFS is to offer procedural guidance, best practices, lessons learned, examples, and explanatory materials that clarify how to meet UFC criteria. They may include step-by-step procedures, checklists, illustrations, or decision aids, but they do not create new requirements or modify UFC content. UFS are developed by Discipline Working Groups (DWGs) and published by

UFS 3-490-06 as of 2026-06-05 · official source ↗

ermanent Magnet PMAC Permanent Magnet Alternating Current SME Subject Matter Expert SOFA Status of Forces Agreements UFC Unified Facilities Criteria UFGS Unified Facilities Guide Specification U.S. United States UFS 3-490-06 5 June 2026 16 A-2 DEFINITION OF TERMS. Personnel Hoist: A personnel hoist is a mechanism for use in connection with the construction, alteration, maintenance, or demolition of a building, structure, or other work. It is used for hoisting and lowering workers or materials, or both, is equipped with a car that moves on guide members during its vertical movement and includes its hoistway. UFS 3-490-06 5 June 2026 17 APPENDIX B REFERENCES AMERICAN SOCIETY OF CIVIL ENGINEERS https://www.asce.org ASCE/SEI 24-0514, Flood Resistant Design and Construction AMERICAN SOCIETY OF

UFS 3-490-06 as of 2026-06-05 · official source ↗

. The difference is that a wire rope sheave is mounted to the top of the hydraulic plunger and steel hoist ropes are attached to the cylinder base, run over the sheave, and down to the cab frame. As the cylinder runs up, the 1:2 roping moves the elevator cab twice the distance of the plunger travel. The cost of acquisition, maintenance, and service for a roped- hydraulic elevator is substantially greater than for the direct plunger types and is not permitted in DOD facilities except in the event of compelling design conditions. UFS 3-490-06 5 June 2026 13 Figure 4-2 In-ground Direct Plunger Hydraulic Elevator Elevator Machine Room is located directly adjacent to the elevator hoistway. UFS 3-490-06 5 June 2026 14 Figure 4-3 Hole-less, Dual Post, Direct Plunger Hydraulic Elevator Elevator Ma

DAFMAN 91-203 · para 2.5.7 as of 2026-06-25 · View in PDF → · official source ↗

open to prevent a tripping hazard. (T-0) Report elevator malfunctions immediately to the unit facility manager. Employees will not try to stop elevators by placing a hand or foot in closing doors. (T-0) Employees will not use elevators during emergency evacuation. (T-0) 2.5.6.3. Where an elevator or escalator is operating unsafely or has visible damage, do not use it until inspected by a certified inspector. (T-1) UFC 3-490-06, Elevators, ASME A17.1, Safety Code for Elevators and Escalators, and ASME A17.2, Guide for Inspection of Elevators, Escalators and Moving Walk, provides additional information. 2.5.7. Facility floors, especially raised floors, will be kept smooth, clean and free of obstructions and slippery materials. (T-0) 2.5.8. Raised floor spaces will be divided in the same mann

FC 4-721-10N as of 2022-05-19 · official source ↗

ty Planning Criteria for Navy/Marine Corps Shore Installations UFC 2-100-01, Installation Master Planning UFC 3-201-01, Civil Engineering UFC 3-201-02, Landscape Architecture UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 3-490-06, Elevators UFC 3-580-01, Telecommunications Interior Infrastructure Planning and Design UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings UFC 4-010-06, Cybersecurity of Facility-Related Control Systems UFC 4-020-01, DoD Security Engineering Facilities Planning Manual

UFC 1-200-01 as of 2022-09-01 · official source ↗

Distribution • 3-240-01, Wastewater Collection and Treatment • 3-301-01, Structural Engineering • 3-401-01, Mechanical Engineering • 3-410-01, Heating, Ventilating and Air Conditioning • 3-420-01, Plumbing Systems • 3-490-06, Elevators • 3-501-01, Electrical Engineering • 3-520-01, Interior Electrical Systems • 3-530-01, Interior and Exterior Lighting Systems and Controls • 3-550-01, Exterior Electrical Power Distribution • 3-560-01, Operation and Maintenance: Electrical Safety • 3-580-01, Telecommunications Interior Infrastructure Planning and Design • 3-600-01, Fire Protection Engineering for Facilities • 4-010-01, DoD Minimum Antiterrorism Standards for Buildings CANCELLED UFC 1-200-01 01 September 2022 Change 4, 17 December 2024 9 • 4-010-06, Cybersecurity of Facility-Related Control

UFC 3-530-01 as of 2023-02-09 · official source ↗

.wbdg.org/ffc/dod/unified-facilities-criteria-ufc UFC 1-200-01, DoD Building Code UFC 1-200-02, High Performance and Sustainable Building Requirements UFC 3-101-01, Architecture UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-490-06, Elevators UFC 3-535-01, Visual Air Navigation Facilities UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-06, Cybersecurity of Facility-Related Control Systems UFC 4-020-01, DoD Security Engineering Facilities Planning Manual UFC 4-021-02, Electronic Security Systems UFC 4-022-01, Security Engineering: Entry Control Facilities/Access Control Points UFC 4-025-01, Security Engineering: Waterfront Security UFC 4-152-01, Design: Piers and Wharves UFC 4-510-01, Design: Military Medical Facilities UFC 4-740-02, Fitness Centers UFC 4-7

e field strengths or averaging the power densities over an area equivalent to the vertical cross section of the human body (projected area), or a smaller area depending on the frequency, are compared with the MPEs in section A of this table. bThese plane-wave equivalent power density values are commonly used as a convenient comparison with MPEs at higher frequencies and are displayed on some instruments in use. B. Electric field MPE: whole body exposure: F= 3 kHz to 100 kHz Frequency range (kHz) E (rms) (V/m) 3 – 100 1842 C. MPE for exposure of head and torso: F= 3 kHz to 5 MHz Frequency range (kHz) Flux Density Brms (mT) Hrms (A/m) 3.0 – 3.35 2.06/f 1640/f 3.35 – 5000 0.615 490 NOTE—f is expressed in kHz. D. MPE for limbs: 3 kHz to 5 MHz Frequency range (kHz) Brms (mT) Hrms (A/m) AFI48-10

NFPA standards (cited by reference)
NFPA 70 National Electrical Code — cited by DAFMAN 91-203 (sections 5, 8) · read at NFPA free access ↗
NFPA 30 Flammable and Combustible Liquids Code — cited by DAFMAN 91-203 · read at NFPA free access ↗
NFPA 70E Electrical Safety in the Workplace — cited by DAFMAN 91-203 (sections 2.3, 8.17) · read at NFPA free access ↗

NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.