Ask a compliance question

Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.

Governing guidance

Showing the controlling passages directly. (daily question limit reached — showing passages)

UFS 3-401-01 as of 2026-06-05 · official source ↗

UFS 3-401-01 5 June 2026 UNIFIED FACILITIES SUPPLEMENT (UFS) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED MECHANICAL ENGINEERING UFS 3-401-01 5 June 2026 FOREWORD Unified Facilities Supplements (UFS) provide non-mandatory, supplemental information in support of Unified Facilities Criteria (UFC). Only UFC establish enforceable criteria. UFS are For Information Only (FIO) and exist to help users understand and apply UFC requirements. The purpose of UFS is to offer procedural guidance, best practices, lessons learned, examples, and explanatory materials that clarify how to meet UFC criteria. They may include step-by-step procedures, checklists, illustrations, or decision aids, but they do not create new requirements or modify UFC content. UFS are developed by Discipline Working Groups

UFS 3-401-01 as of 2026-06-05 · official source ↗

verly congested drawings. 2-2.6 Sections and Elevations. Provide sections and elevations as required to supplement plan views. UFS 3-401-01 5 June 2026 5 2-2.7 Access Space. Identify space necessary to access and replace items that require maintenance, such as filters, coils, heat exchangers, tube bundles, strainers, and chillers on the drawings in three-dimensions. 2-2.8 Special Detailing. Provide details on the drawings necessary to ensure drainage for “winterizing” equipment where appropriate. 2-2.9 Equipment Schedules. The equipment installed on a project may be different from that used as the basis of design. Therefore, mechanical equipment schedules must reflect actual required equipment capacities as calculated, rather than capacities provided by manufacturers' catalog data. This he

UFS 3-401-01 as of 2026-06-05 · official source ↗

REQUIREMENTS. The design analysis and drawing requirements chapter provides documentation requirements necessary to demonstrate compliance with mechanical engineering UFC. UFS 3-401-01 5 June 2026 2 CHAPTER 2 DOCUMENTATION REQUIREMENTS 2-1 DESIGN ANALYSIS. Submit the Design Analysis at a preliminary design stage equivalent to 35% design for concurrence of the results. The Design Analysis must consist of a Basis of Design Narrative and Calculations. Update the analysis as necessary as the design progresses. The results of this analysis are used for decision-making in reducing total life cycle cost, while meeting mission objectives. 2-1.1 Basis of Design Narrative. Provide a Basis of Design narrative as part of all design analysis. 2-1.1.1 User Requirements. Provide a description of ventila

AFSOCI 32-1084 · para 7.2.38 as of 2023-02-21 · open official PDF ↗

aircraft maintained. Aircraft inspection occurs within the maintenance hangar. Table 7.2.38. Building Utility System Requirements for Maintenance Support Facility. System Requirements Mechanical Proper ventilation system and energy efficient HVAC system are required. Repair and reclamation shop requires 150-psi shop air and corrosion resistant drains. Applicable criteria include UFC 3-401-01 for mechanical. Electrical Industrial equipment typically requires 240- and 480-volt, three-phase electrical current. Use commercial grade convenience receptacles and special power outlets. Applicable criteria include UFC 3-501-01 for general electrical requirements, UFC 3-520-01 for interior electrical systems requirements, UFC 3-530-01 for interior and exterior lighting and controls requirements, UF

UFS 3-240-01 as of 2026-06-05 · official source ↗

categorical pretreatment standards as indirect discharges using effluent limitation guidelines established in the categorical pretreatment standards. Direct UFS 3-240-01 05 June 2026 23 discharge usually requires extensive wastewater treatment to reduce pollutants and achieve effluent requirements. Refer to EPA 833-K-10-001 for direct discharge guidance. 14-5 CONVENTIONAL POLLUTANTS (40 CFR 401.16). Five conventional pollutants are defined in 40 CFR 401.16. 14-6 INDUSTRIAL POLLUTANTS. Industrial wastewater may contain toxic or non-conventional pollutants in addition to conventional pollutants. When a POTW has the capability to remove toxic pollutants from industrial wastewater the pollutants can end up in the POTW’s sludge. 14-6.1 Toxic Pollutants (40 CFR 401.15). 40 CFR 401.15 currently c

UFS 3-420-01 as of 2026-06-05 · official source ↗

ATER LEVELS AND WITHDRAWALS (Based on bottom outlet tanks and a 10 percent residual) PRESSURE RANGE psi (kPa) HIGH WATER LEVEL (percent of total tank capacity) WITHDRAWAL (96% of total tank capacity) 20-40 (140-275) 43 33 30-50 (205-345) 38 28 40-60 (275-415) 34 24 50-70 (345-480) 32 22 60-80 (415-550) 28 18 20-45 (140-310) 48 38 30-55 (205-380) 42 32 40-65 (275-450) 37 27 50-75 (345-520) 35 25 60-85 (415-590) 32 22 UFS 3-420-01 05 June 2026 10 CHAPTER 4 DESIGN ANALYSIS AND DRAWING REQUIREMENTS Provide the following in addition to the design analysis and drawing requirements in UFS 3-401-01: 4-1 DESIGN ANALYSIS. The Design Analysis must consist of a Basis of Design Narrative and Calculations demonstrating compliance with all UFC requirements. 4-1.1 Basis of Design Narrative Requirements. I

CFETP 21RX · para 2.5.1 as of 2019-08-26 · open official PDF ↗

CY PLANNING 2.4 TR: JP 5-0; AFSC PUB 1; Vol 2, Leadership; AFI 10-401; AFI 10-403; CJCSM 3122.01; CJCSM 3122.02; CJCSM 3122-03; CJCSM 3150.01 2.4.1 Identify the War and Mobilization Plan (WMP) documents K 2.4.2 Identify the planning phases of the contingency planning process K 2.4.3 Explain Time-Phased Force Deployment Data (TPFDD) K 2.4.4 Explain the Manpower, Equipment Force, Packaging (MEFPAK) K 2.4.5 Explain the UTC development and review process (effects of UTA) K CRISIS ACTION PLANNING 2.5 TR: JP 5-0; AFSC PUB 1; Vol 2, Leadership; AFI 10-401; AFI 10-403; CJCSM 3122.01; CJCSM 3122.02; CJCSM 3122.03 2.5.1 Identify the phases of crisis action planning K 49INSTALLATION DEPLOYMENT ROLES & RESPONSIBILITIES TR: JP 4-0; Vol 1 Basic Doctrine; AFI 10-403; Vol 2, Leadership; Annex 2.6 4-0 Comb

UFS 1-300-01 as of 2026-01-14 · official source ↗

erved • 3-390 Miscellaneous A-3.4 3-400 Series - Mechanical. • 3-401 General • 3-410 HVAC UFS 1-300-01 14 January 2026 31 • 3-420 Plumbing Systems • 3-430 Central Plants and Energy Distribution Systems • 3-440 Renewable Energy Systems • 3-450 Acoustics and Vibration Control • 3-460 Fuel Storage and Distribution Systems • 3-470 Energy Monitoring and Control Systems • 3-480 Reserved • 3-490 Miscellaneous A-3.5 3-500 Series - Electrical. • 3-501 General • 3-510 Foreign Voltages • 3-520 Interior Electrical Systems • 3-530 Lighting Design and Controls • 3-535 Airfield Lighting Systems • 3-540 Electric Power Generation • 3-550 Electric Power Supply and Distribution • 3-555 400Hz Power Systems • 3-560 Electrical Safety • 3-570 O&M: Cathodic Protection • 3-575 Lightning Protection • 3-580 Telecomm

NFPA standards (cited by reference)
NFPA 780 Installation of Lightning Protection Systems — cited by AFSOCI 32-1084 (sections 8.1.1, 8) · read at NFPA free access ↗
NFPA 33 — cited by AFSOCI 32-1084 · read at NFPA free access ↗

NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.