UFS 3-240-01 05 June 2026 UNIFIED FACILITIES SUPPLEMENT (UFS) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED WASTEWATER COLLECTION AND TREATMENT UFS 3-240-01 05 June 2026 1 FOREWORD Unified Facilities Supplements (UFS) provide non-mandatory, supplemental information in support of Unified Facilities Criteria (UFC). Only UFC establish enforceable criteria. UFS are For Information Only (FIO) and exist to help users understand and apply UFC requirements. The purpose of UFS is to offer procedural guidance, best practices, lessons learned, examples, and explanatory materials that clarify how to meet UFC criteria. They may include step-by-step procedures, checklists, illustrations, or decision aids, but they do not create new requirements or modify UFC content. UFS are developed by Disciplin
Sector-Specific Plan, and Emergency Planning, Response and Recovery provide guidance for the protection of wastewater treatment facilities. UFS 3-240-01 05 June 2026 10 5-5 SUPPORT SYSTEMS FOR WASTEWATER TREATMENT OPERATIONS. WEF MOP 8, Chapter 7 provides guidance on designing wastewater support systems such as instrumentation and control, chemical storage and chemical feed systems. UFS 3-240-01 05 June 2026 11 CHAPTER 6 MODIFICATIONS TO CHAPTER 60 SCREENING, GRIT REMOVAL, AND FLOW EQUALIZATION 6-1 PRELIMINARY TREATMENT. WEF MOP 8, Chapter 9, Preliminary Treatment, provides guidance for the design of preliminary treatment systems. UFS 3-240-01 05 June 2026 12 CHAPTER 7 MODIFICATIONS TO CHAPTER 70 SETTLING 7-1 GENERAL. WEF MOP 8, Chapter 10 Primary Treatment, provides guidance for the desi
AL TREATMENT WEF MOP 8, Chapter 13: Integrated Biological Treatment, provides design guidance for fixed-biofilm treatment in series with suspended-growth treatment. UFS 3-240-01 05 June 2026 16 CHAPTER 10 MODIFICATIONS TO CHAPTER 100 DISINFECTION 10-1 SECTION 101 GENERAL. WEF MOP 8, Chapter 17 Disinfection provides guidance on disinfection design. Disinfection guidance includes chlorine disinfection, dichlorination, ultraviolet disinfection, ozone disinfection, and other disinfection methods. UFS 3-240-01 05 June 2026 17 CHAPTER 11 MODIFICATIONS TO CHAPTER 110 SUPPLEMENTAL TREATMENT PROCESSES 11-1 ADVANCED WASTEWATER TREATMENT. WEF MOP 8 Chapter 14 Physical and Chemical Processes for Advanced Wastewater Treatment provides guidance for the design of advanced treatment systems. Advanced trea
aircraft maintained. Aircraft inspection occurs within the maintenance hangar. Table 7.2.38. Building Utility System Requirements for Maintenance Support Facility. System Requirements Mechanical Proper ventilation system and energy efficient HVAC system are required. Repair and reclamation shop requires 150-psi shop air and corrosion resistant drains. Applicable criteria include UFC 3-401-01 for mechanical. Electrical Industrial equipment typically requires 240- and 480-volt, three-phase electrical current. Use commercial grade convenience receptacles and special power outlets. Applicable criteria include UFC 3-501-01 for general electrical requirements, UFC 3-520-01 for interior electrical systems requirements, UFC 3-530-01 for interior and exterior lighting and controls requirements, UF
e exposed to stormwater, or who are responsible for implementing activities necessary to meet the conditions of the stormwater pollution prevention plan (SWPPP) (e.g., inspectors, maintenance personnel) must be trained in appropriate best management practices (BMPs) applicable to their work. b. UFC Guidelines. Installations must implement and follow the design, operation, and maintenance guidelines in accordance with UFC 3-240-01, UFC 3-240-02, and UFC 3-240-13FN when operating wastewater treatment systems or conducting wastewater treatment. c. Complaint System. Establish a system that involves the LEC, as appropriate, to investigate water pollution complaints from individuals or HN water pollution control authorities. d. Recordkeeping Requirements. Retain the following records for 3 years
e exposed to stormwater, or who are responsible for implementing activities necessary to meet the conditions of the stormwater pollution prevention plan (SWPPP) (e.g., inspectors, maintenance personnel) must be trained in appropriate best management practices (BMPs) applicable to their work. b. UFC Guidelines. Installations must implement and follow the design, operation, and maintenance guidelines in accordance with UFC 3-240-01, UFC 3-240-02, and UFC 3-240-13FN when operating wastewater treatment systems or conducting wastewater treatment. c. Complaint System. Establish a system that involves the LEC, as appropriate, to investigate water pollution complaints from individuals or HN water pollution control authorities. d. Recordkeeping Requirements. Retain the following records for 3 years
tic wiring diagram of the actual system to be utilized. Designer should delete the other diagrams. 7. Size and number of conductors must be verified with manufacturer. UFS 3-535-02 2 February 2026 158 Figure 66. REIL Systems Schematic Wiring Diagrams UFS 3-535-02 2 February 2026 159 6-8 Master and Slave REIL Unit Installation. 6-8.1 Figure 67. 6-8.1.1 Notes to Designer. 1. This detail shows a typical 120/240 volt system installation. All manufacturers are similar but arrangements of conduit entrances and support legs may be different. Recommend verifying requirements with several different manufacturers. 2. Foundations will vary with manufacturer. 3. Ensure contract documents show location of REILs and power source. Locations will be as specified in UFC 3-535-01. 6-8.1.2 Drawing Notes for
8. WASTEWATER SYSTEMS TR: UPC; Ken Kerri, Operation and Maintenance of Wastewater Collection and Disposal Systems; UFCs 3-240-01, 3-240-02, 3-240-03N; ETL 13-2, AFI32-1066, 32-1067; AFPAM10- 219V7 8.1. Fundamentals of collection 8.1.1. Sanitary sewer K P pk - 8.1.2. Industrial waste (grease traps, oil K P pk - water separators) 19Attachment 2 1. Tasks, Knowledge and 2. Duty Position Tasks and 3. Certification of Training Technical References Proficiency Codes A/H J C/WL S Trng Trng Trne Trnr Strt Com Init Init 8.1.3. Storm Drains K P pk - 8.1.4.Sewage lift stations 8.1.4.1. Dry well K P pk - 8.1.4.2. Wet well K P pk - 8.2. Collection system piping 8.2.1. Install cast iron pipe P pk - 8.2.2. Install plastic pipe K P pk - 8.2.3. Establish trench grade K P pk - 8.2.4. Establish pipeline slop
NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.