Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.
anning details, but simply to identify locations targeted for known requirements and deconflict project site selections. See Figure 3-4. UFS 2-100-01 16 January 2026 31 Figure 3-2 Developable Area Map Graphic UFS 2-100-01 16 January 2026 32 Figure 3-3 Framework Plan Graphic UFS 2-100-01 16 January 2026 33 Figure 3-4 Summary Future Development Plan Graphic UFS 2-100-01 16 January 2026 34 3-6 INSTALLATION DEVELOPMENT PLAN (IDP). The IDP includes ADPs and applicable Network Plans. 3-6.1 Area Development Plan (ADP). The bulk of the installation planning effort occurs at the scale of an ADP, which is a detailed plan for a district that includes detailed constraints and opportunities maps, Illustrative Plans, Regulating Plans, Implementation Plans, and capacity analysis. Include other supporting
UFS 2-100-01 16 January 2026 UNIFIED FACILITIES SUPPLEMENT (UFS) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED INSTALLATION MASTER PLANNING UFS 2-100-01 16 January 2026 FOREWORD Unified Facilities Supplements (UFS) provide non-mandatory, supplemental information in support of Unified Facilities Criteria (UFC). Only UFC establishes enforceable criteria. UFS are For Information Only (FIO) and exist to help users understand and apply UFC requirements. The purpose of UFS is to offer procedural guidance, best practices, lessons learned, examples, and explanatory materials that clarify how to meet UFC criteria. They may include step-by-step procedures, checklists, illustrations, or decision aids, but they do not create new requirements or modify UFC content. UFS are developed by Discipline
gulating Plan UFS 2-100-01 16 January 2026 51 Figure A-2 Transportation Plan UFS 2-100-01 16 January 2026 52 Figure A-3 Pedestrian and Bikeway Plan UFS 2-100-01 16 January 2026 53 Figure A-4 Open Space Plan A-1.2.5 As part of the area development planning process, the planning team developed Installation Planning Standards for streets, buildings, and landscapes. Additionally, within each ADP, the team documented the Installation Development Program. A Plan Summary, referred to by the Army as the Real Property Master Plan Digest, documented the entire effort. A-1.3 Plan Implementation. A-1.3.1 The plan integrated into the installation’s planning process. Upon completion, the garrison commander and the senior mission commander endorsed the plan. Perhaps most importantly, the Regulating Plan
rature on proper device setup. Table 1-14 Certification Test Equipment Levels Level Frequency Cable Category IIe 100 MHz 5e and class D III 250 MHz 6 and class E IIIe 500 MHz 6A and class EA IV 1000 MHz 8 and class F/FA* *Currently, field tester accuracy to cover Class F cabling to 1000 MHz is not defined. UFS 3-580-01 05 June 2026 34 Figure 1-14 Telecommunications Labeling UFS 3-580-01 05 June 2026 35 Figure 1-15 Sample Labeling System 1-7.2 PON Testing and Certification. Bidirectional loss at both 1310 nanometers and 155 nanometers must be conducted between the OLT and every cable in every ONT connected through the splitter. 36 UFS 3-580-01 05 June 2026 CHAPTER 2 OUTSIDE PLANT CRITERIA 2-1 INTRODUCTION. 2-1.1 Applicability. Criteria and standards within this UFC are the minimum to provid
ylight is present Zoning None 1-1.2.2 Performance Requirements. Target Criteria Daytime/Nighttime Minimum Illuminance 10 fc (100 lux) at walking surface (includes stair treads) Horizontal Illuminance Uniformity 2:1 average to minimum UFS 3-530-01 05 June 2026 4 1-1.2.3 Critical Design Issues. • Horizontal illuminance is calculated on stair treads and landings. • Do not locate luminaires on the ceiling above the treads. Locate luminaires where they are easily accessible for maintenance. • Means of egress must comply with NFPA 101 control requirements and minimum light level requirements. When the corridor is means of egress, automatic off is allowable when the NFPA 101 control requirements are met. UFS 3-530-01 05 June 2026 5 1-1.3 Lounge Areas/Breakroom. 1-1.3.1 Control Requirements. Manua
, machine tool, cranes, elevators, ventilation, compressors, pumps, etc. 20–100 30 Motors: Miscellaneous, fractional, and small appliances 10–50 25 Resistance ovens, heaters, and furnaces 80–100 80 Induction furnaces 80–100 80 Lighting 65–100 75 Arc welders 25–50 30 Resistance welders 5–40 20 Air-conditioning equipment 60–100 70 Refrigeration compressors 40–100 60 Note 1: Demand factors include allowance for system loss. UFS 3-501-01 05 June 2026 44 Table C-3 Annual Hours of Demand Usage for Specific Loads Quick Estimating Hours of Use Types of Loads 1-Shift Operation 2-Shift Operation 3-Shift Operation Motors: General purpose 1,200 1,600 2,000 Motors: Miscellaneous, fractional, and small appliances 1,500 1,800 2,100 Resistance ovens, heaters, and furnaces 1,000 1,300 1,600 Induction furna
Germanium-68 .01 2,000 Gadolinium-153 .01 5,000 Gold-198 .01 30,000 Hafnium-172 .01 400 Hafnium-181 .01 7,000 Holmium-166m .01 100 Hydrogen-3 .5 20,000 Iodine-125 .5 10 Iodine-131 .5 10 Indium-114m .01 1,000 Iridium-192 .001 40,000 Iron-55 .01 40,000 Iron-59 .01 7,000 Krypton-85 1.0 6,000,000 Lead-210 .01 8 Manganese-56 .01 60,000 Mercury-203 .01 10,000 Molybdenum-99 .01 30,000 Neptunium-237 .001 2 Nickel-63 .01 20,000 Niobium-94 .01 300 Phosphorus-32 .5 100 Phosphorus-33 .5 1,000 Polonium-210 .01 10 Potassium-42 .01 9,000 Promethium-145 .01 4,000 Promethium-147 .01 4,000 Radium-226 0.001 100 Ruthenium-106 .01 200 Samarium-151 .01 4,000 Scandium-46 .01 3,000 Selenium-75 .01 10,000 Silver-110m .01 1,000 Sodium-22 .01 9,000 Sodium-24 .01 10,000 Strontium-89 .01 3,000 Strontium-90 .01 90 Sul
ions.) Inspection Area Magnetic Rubber Base Material Field Strength (Gauss) Magnetization Duration, Each Direction Hole (bare) MR-502 (NSN 6850-01-037-9015) 50 to 100 30 seconds MR-502K (NSN 6850-01-163-0276) MR-502Y (NSN 6850-01-163-0277) 30 to 50 30 seconds Surface (bare) MR-502 (NSN 6850-01-037-9015) 150 1 minute 100 3 minutes 50 10 minutes MR-502K (NSN 6850-01-163-0276) 100 30 seconds MR-502Y (NSN 6850-01-163-0277) 50 1 minute 30 2 minutes Coated Holes and Surfaces Extend magnetization duration from the times listed above depending on coating thickness. 3.4.13.4.5 Determine Field Direction. Since cracks and other flaws are displayed more strongly when they lie perpen- dicular to the magnetic lines of force, the magnetism SHOULD be applied from two directions to increase reliability whe
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.