Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.
Showing the controlling passages directly. (daily question limit reached — showing passages)
System Issues and Mitigation Actions: UFS 1-201-02 28 July 2025 92 APPENDIX C ADDITIONAL NOTES AND ACTION ITEMS Figure C-1 Sample Electrical Panel Schedule UFS 1-201-02 28 July 2025 93 Figure C-2 Blank Electrical Panel Schedule UFS 1-201-02 28 July 2025 94 Figure C-3 Sample Single Line Diagram UFS 1-201-02 28 July 2025 95 APPENDIX D GLOSSARY D-1 ACRONYMS. AE Ammunition and Explosives AFCEC Air Force Civil Engineer Center AFH Air Force Handbook AFPAM Air Force Pamphlet AHJ Authority Having Jurisdiction AIC Ampere Interrupting Capacity BIA Bilateral Infrastructure Agreement C Degrees Celsius DoD Department of Defense EMT Electrical Metallic Tubing ETL Engineering Technical Letter F Degrees Fahrenheit Ft feet FMC Flexible Metallic Conduit GFCI Ground Fault Circuit Interrupt GRS Galvanized Rig
UFS 1-201-02 28 July 2025 UNIFIED FACILITIES SUPPLEMENT (UFS) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED ASSESSMENT OF EXISTING FACILITIES FOR USE IN MILITARY OPERATIONS UFS 1-201-02 28 July 2025 FOREWORD Unified Facilities Supplements (UFS) provide non-mandatory, supplemental information in support of Unified Facilities Criteria (UFC). Only UFC establish enforceable criteria. UFS are For Information Only (FIO) and exist to help users understand and apply UFC requirements. The purpose of UFS is to offer procedural guidance, best practices, lessons learned, examples, and explanatory materials that clarify how to meet UFC criteria. They may include step-by-step procedures, checklists, illustrations, or decision aids, but they do not create new requirements or modify UFC content. UFS
Install GFCI receptacle GFCI receptacles fail to trip. Yes No 4-6.2.11 Replace GFCI receptacle UFS 1-201-02 28 July 2025 87 CONDITION ASSESSED CONDITIONS FOR FURTHER INFORMATION SEE ALLOWED FIELD MITIGATION RECORD ACTUAL CONDITIONS AND ACTIONS TAKEN IN SPACE PROVIDED BELOW ASSESSED ITEM. Circuit lockout requirements Appropriate circuit lock-out procedures exist. Yes No 4-6.1.11 Develop procedures to properly lock out and tag out electrical systems prior to occupation per UFC 3-520- 01. UFS 1-201-02 28 July 2025 88 Additional Notes on Electrical System Issues and Mitigation Actions: UFS 1-201-02 28 July 2025 89 TELECOMMUNICATION SYSTEMS INSPECTOR NAME: CONDITION ASSESSED CONDITIONS FOR FURTHER INFORMATION SEE ALLOWED FIELD MITIGATION RECORD ACTUAL CONDITIONS AND ACTIONS TAKEN IN SPA
elipad. For other pads, markings will appear different. UFS 3-535-02 2 February 2026 200 Figure 86. Hospital Helipad Perimeter Lighting UFS 3-535-02 2 February 2026 201 8-3 Helipad Landing Direction Lights. 8-3.1 Figure 87. 8-3.1.1 Notes to Designer. 1. The landing direction lights may be powered from the regulator feeding the perimeter lights. The circuit may be separated by using an FAA type L-847 circuit selector switch, thereby allowing the direction lights to be switched off independently. The landing lights may not be switched on unless the perimeter lights are on. 8-3.1.2 Drawing Notes for Figure 87. 1. Landing direction light configuration for hospital helipad must start 25' (7.5m) from the outer perimeter light. 2. In-pavement fixtures must be used in areas of vehicle traffic and
.esd.whs.mil/Directives/issuances/dodd/ DoDD 3020.40, Mission Assurance (MA) DoD Instructions: https://www.esd.whs.mil/Directives/issuances/dodi/ DoDI 3020.45, Mission Assurance (MA) Construct DoDI 4165.70, Real Property Management DoDI 4170.11, Installation Energy Management DoDI 4715.28, Military Installation Resilience UFS 2-100-01 16 January 2026 81 UNIFIED FACILITIES CRITERIA https://www.wbdg.org/dod/ufc UFC 1-200-01, DoD Building Code UFC 1-200-02, High Performance and Sustainable Building Requirements UFC 3-201-01, Civil Engineering UFC 3-201-02, Landscape Architecture UFC 3-210-10, Low Impact Development UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-410-01, Heating, Ventilating, and Air-Conditioning Systems UFC 4-010-01, DoD Minimum Antiterrorism Standard for Buildi
ied Petroleum Gas Code NFPA 70, National Electrical Code® NFPA 101, Life Safety Code® NFPA 285, Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Wall Assemblies Containing Combustible Components UNIFIED FACILITIES CRITERIA https://www.wbdg.org/dod/ufc UFC 1-200-02, High Performance and Sustainable Building Requirements UFC 1-201-01, Non-Permanent DoD Facilities in Support of Military Operations UFC 1-201-02, Assessment of Existing Facilities for Use in Military Operations \2\ /2/ UFC 1-300-02, Unified Facilities Guide Specifications (UFGS) Format Standard FC 1-300-09N, Navy and Marine Corps Design Procedures UFC 3-101-01, Architecture UFC 3-110-03, Roofing UFC 3-120-10, Interior Design UFC 3-190-06, Protective Coatings and Paints UFC 3-201-01, Civil
the data element on the line of print. 6.66.12. 201-AUTHORIZED-IN-USE Detail.AFH23-123V2PT2 8 AUGUST 2013 690 Table 6.141. 201-AUTHORIZED-IN-USE Detail. Format Nbr Print Pos. Pos. DETAIL NAME / RECORD NBR 32 1-32 201-SYSTEM-DESIGNATOR 02 33-34 201-QUANTITY-ON-HAND 05 35-39 201-DTL-RECORD-TYPE 01 40 201-DOCUMENT NBR 14 41-54 201-ATHRIZD-QNTY 05 55-59 201-ITEM-CODE 01 60 201-EQUIP-CODE 01 61 201-USE-CODE 01 62 201-ALLOWANCE-SOURCE-CODE 07 63-69 201-BASE-OF-PLANNED-USE 03 70-72 201-ALTERNATE-STORAGE-LOC-CODE 03 73-75 201-LABEL-FLG 01 76 201-SPECIAL-ALLOWANCE-FLAG 01 77 201-WRM-REPORTING-APPLIC-CODE 02 78-79 201-BASS-COMPOSITION-CODE 04 80-83 201-REM-EMC-FLG 01 84 201-DATE-ESTABLISHED 07 85-91 201-DATE-OF-LAST-TRANSACTION 07 92-98 201-SEACS-IND 01 99 201-DEPLOYED-IND 01 100 BLANK 01 101 LINE T
ment) Office of the Assistant Secretary of Defense (Sustainment) CANCELLED UFC 3-201-02 29 April 2020 Change 1, 09 February 2021 UNIFIED FACILITIES CRITERIA (UFC) REVISION SUMMARY SHEET Document: UFC 3-201-02, Landscape Architecture, unifies the landscape architectural criteria for DoD. Superseding: UFC 3-201-02, 23 February 2009, including change 1 November 2009 Description: This document assimilates and applies current policies, technology, and environmental planning critical to the long-term success of DoD facilities and projects. The integration of government and industry codes, practices, materials, and reference works ensure the contemporary relevance of the UFC Landscape Architecture document. Reasons for Document: • Improve the quality-of-life at DoD facilities through informed, us
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.