Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.
hook can be used to support the weight of the buoy while the main crane hook lifts the riser chain. Ensure the rigging methods are appropriate to support both the hawse pipe buoy and riser chain to ensure that both the buoy and riser chain are adequately supported during the lift. B-6 DEMOBILIZATION. While there is little beyond standard safety concerns during demobilization, before any cutting, welding or grinding is done on the vessel, a Gas-Free Certificate and a Hot- Work Permit need to be obtained. UFM 4-150-09 13 March 2026 162 SAMPLE 1149 UFM 4-150-09 13 March 2026 163 UFM 4-150-09 13 March 2026 164 SAMPLE MOORING INSPECTION SHEETS The following are sample mooring inspection sheets for various points on the mooring. UFM 4-150-09 13 March 2026 165 UFM 4-150-09 13 March 2026 166 UFM 4
the mooring. UFM 4-150-09 13 March 2026 165 UFM 4-150-09 13 March 2026 166 UFM 4-150-09 13 March 2026 167 UFM 4-150-09 13 March 2026 168 UFM 4-150-09 13 March 2026 169 SAMPLE PRELIMINARY INSPECTION EMAIL The following is a sample of a preliminary inspection email: NAVFAC Engineering and Expeditionary Warfare Center (EXWC) East Coast Detachment conducted an underwater inspection of Fleet Mooring 7 located in vicinity of pier 1 at Naval Weapon Station (NWS) EARLE on 21 July 2010. The inspection was conducted by an engineer from EXWC and divers from underwater construction team one. The following is a preliminary report of the inspection results: A. Fleet Mooring 7 was found to be in C3, fair condition, due to measurements on the riser chain between 80% and 90% of its original wire-diameter.
tire buoy. The buoy should fill up the majority of the photo, and if present, include the stenciled buoy name. WITHIN A REPORT, BE CONSISTENT IN COMMENT FORMAT THROUGHOUT ALL INSPECTION SHEETS. UFM 4-150-09 13 March 2026 180 FM3 MOORING COMPONENT DATA This Appendix provides data on FM3 components. Data on commercial components can be obtained from the manufacturer or distributer. G-1 FM3 STUD LINK CHAIN. Figure G-1 FM3 Stud Link Chain UFM 4-150-09 13 March 2026 181 G-2 FM3 CHAIN JOINING LINK. Figure G-2 FM3 Chain Joining Link Data UFM 4-150-09 13 March 2026 182 G-3 FM3 ANCHOR JOINING LINK. Figure G-3 FM3 Anchor Joining Link Data UFM 4-150-09 13 March 2026 183 G-4 FM3 GROUND RING. Figure G-4 FM3 Ground Ring Data UFM 4-150-09 13 March 2026 184 G-5 FM3 PEAR LINK. Figure G-5 FM3 Pear Link UFM
tion: Maintenance of Waterfront Facilities UFM 4-150-08, Mooring Hardware Inspection UFC 4-159-03, Moorings UNIFORM FIRE CODE UFC Article 52, Motor Vehicle Fuel Dispensing Stations: Public and Private Operations UFC Article 79 Flammable and Combustible Liquids UNIFIED FACILITIES GUIDANCE SPECIFICATIONS UFGS 09 97 13.15, Low VOC Polysulfide Interior Coating of Welded Steel Petroleum Fuel Tanks UFGS 09 97 13.17, Three Coat Epoxy Interior Coating of Welded Steel Petroleum Fuel Tanks UFGS 09 97 13.27, High Performance Coating for Steel Structures UFGS 33 08 55, Fuel Distribution System Start-up (Non-Hydrant) UFGS 33 52 23.15, POL Service Piping Welding UFGS 33 52 43.11, Aviation Fuel Mechanical Equipment UFGS 33 52 43.12, Aviation Fuel Pantographs UFGS 33 52 43.13, Aviation Fuel Piping UFGS 33
11X --- 750 180.42 300 80 9X 11X --- 1000 240.56 440 100 9X 11X --- 1500 360.84 600 120 9X 9X --- 2000 481.13 600 150 9X 9X UFM 3-550-07 12 March 2026 195 Table D-20 Cooper VFI Settings to Provide Primary Protection for Individual Transformers – 4.16 kV Transformer 1-Phase Rating (kVA) Transformer 3-Phase Rating (kVA) 3-Phase Full Load Line Current Phase Pickup Setting (amperes) Ground Pickup Setting (amperes) Phase Inst Trip Setting (value) Ground Inst Trip Setting (value) 15 45 6.25 20 10 3X 3X 25 75 10.41 20 10 5X 5X 37.5 112.5 15.61 30 20 5X 5X 50 150 20.82 40 20 7X 7X 75 225 31.23 60 30 9X 7X 100 300 41.64 80 40 9X 11X 167 500 69.39 130 60 9X 11X --- 750 104.09 180 80 9X 11X --- 1000 138.79 230 100 9X 11X --- 1500 208.18 350 100 9X 9X --- 2000 277.57 450 100 9X 9X Table D-21 Cooper VF
aCO3) (Tables A-5 and A-6) UFM 3-230-13 5 February 2026 206 Table A-1 Factor "A" for TDS TDS (ppm) Value of "A" 50 0.07 75 0.08 100 0.10 150 0.11 200 0.13 300 0.14 400 0.16 600 0.18 800 0.19 1000 0.20 1500 0.21 2000 0.22 2500 0.23 3000 0.24 4000 0.25 5000 0.26 UFM 3-230-13 5 February 2026 207 Table A-2 Factor "B" for Temperature °F F, Units Tens 0 2 4 6 8 30 -- 2.60 2.57 2.54 2.51 40 2.48 2.45 2.43 2.40 2.37 50 2.34 2.31 2.28 2.25 2.22 60 2.20 2.17 2.14 2.11 2.09 70 2.06 2.04 2.03 2.00 1.97 80 1.95 1.92 1.90 1.88 1.86 90 1.84 1.82 1.80 1.78 1.76 100 1.74 1.72 1.71 1.69 1.67 110 1.65 1.64 1.62 1.60 1.58 120 1.57 1.55 1.53 1.51 1.50 130 1.48 1.46 1.44 1.43 1.41 140 1.40 1.38 1.37 1.35 1.34 150 1.32 1.31 1.29 1.28 1.27 160 1.26 1.24 1.23 1.22 1.21 170 1.19 1.18 1.17 1.16 -- Find value of "B"
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.