Ask a compliance question

Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.

UFC 4-740-15 is the Unified Facilities Criteria for Continuous Child Care Facilities (CCCF), current as of 14 April 2011 [UFC 4-740-15]. This document provides design criteria for Army, Navy, and Marine Corps continuous child care facilities operating 24/7 [UFC 4-740-15]. The Air Force does not currently have a program for these facilities [UFC 4-740-15].

The UFC was developed to assist planners in understanding facility requirements for accurate space programs and budgets, and to provide architects, engineers, and construction personnel with minimum essential requirements for design and construction [UFC 4-740-15].

For fire protection engineering in child care facilities, continuous child care facilities must comply with UFC 4-740-15 [UFC 3-600-01 4-9].

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.
Show the 8 source passage(s) this answer is built from
UFC 4-740-15 as of 2011-04-14 · official source ↗

UFC 4-740-15 14 April 2011 UNIFIED FACILITIES CRITERIA (UFC) CONTINUOUS CHILD CARE FACILITIES APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED UFC 4-740-15 14 April 2011 UNIFIED FACILITIES CRITERIA (UFC) CONTINUOUS CHILD CARE FACILITIES Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location UFC 4-740-15 14 April 2011 FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment,

UFC 4-740-15 as of 2011-04-14 · official source ↗

g Requirements, Unified Facilities Criteria Program, http://dod.wbdg.org UFC 3-450-01, Noise and Vibration Control, Unified Facilities Criteria Program, http://dod.wbdg.org UFC 3-530-01, Design: Interior and Exterior Lighting and Controls, Unified Facilities Criteria Program, http://dod.wbdg.org UFC 4-740-14, Design: Child Development Centers, Unified Facilities Criteria Program, http://dod.wbdg.org Whole Building Design Guide, National Institute of Building Sciences, http://www.wbdg.org UFC 4-740-15 14 April 2011 45 APPENDIX B SPACE PLANNING B-1 OPTION A FACILITY SAMPLE SPREADSHEET. Figure B-1 shows a sample completed spreadsheet for a typical Option A facility. UFC 4-740-15 14 April 2011 46 FIGURE B-1. SAMPLE OPTION A FACILITY CCCF SPACE PROGRAM Select Service Branch: Navy Facility Type

UFC 4-740-15 as of 2011-04-14 · official source ↗

t and Management Department of the Air Force Office of the Deputy Under Secretary of Defense (Installations and Environment) UFC 4-740-15 14 April 2011 UNIFIED FACILITIES CRITERIA (UFC) NEW DOCUMENT SUMMARY SHEET Document: UFC 4-740-15 Superseding: None. Description: This UFC provides design criteria for Army, Navy, and Marine Corps Continuous Child Care Facilities. NOTE: The Air Force does not currently have a program for these facilities. Reasons for Document: This UFC was developed to provide design requirements to accomplish the following: • Assist planners to understand the facility requirements to ensure accurate space programs and budgets. • Provide architects, engineers, and construction surveillance personnel with the essential, minimum requirements for the design and construction

UFC 3-530-01 as of 2023-02-09 · official source ↗

10-01, Design: Military Medical Facilities UFC 4-740-02, Fitness Centers UFC 4-740-14, Design: Child Development Centers FC 4-721-10N, Navy and Marine Corps, Unaccompanied Housing CANCELLED UFC 3-530-01 09 February 2023 Change 1, 15 December 2023 240 FC 4-740-14N, Navy and Marine Corps Child Development Centers WHOLE BUIDING DESIGN GUIDE RESOURCES Entry Control Facility/Access Control Point Lighting Analysis https://www.wbdg.org/FFC/DOD/UFC/ufc_3_530_01_ecf_acp_lighting_analysis.pdf CANCELLED

UFC 4-730-01 as of 2023-03-20 · official source ↗

Direct Digital Control for HVAC and Other Building Control Systems UFC 3-420-01, Plumbing Systems UFC 3-501-01, Electrical Engineering UFC 3-520-01, Interior Electrical Systems UFC 3-530-01, Interior and Exterior Lighting Systems UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings UFC 4-010-06, Cybersecurity of Facility-Related Control Systems UFC 4-022-01, Security Engineering: Entry Control Facilities / Access Control Points UFC 4-023-10, Safe Havens UFC 4-026-01, Design to Resist Forced Entry UFC 4-740-06, Youth Centers UFC 4-730-01 20 March 2023 45 FC 4-740-14N, Navy and Marine Corps Child Development Centers UFC 4-740-15, Continuous Child Care Facilities C-2 NON-GOVERNMENT. AMERICAN INSTITUTE OF ARCHITECTS https://ww

UFC 3-600-01 as of 2016-08-08 · official source ↗

ge) or under voltage (i.e., over discharge) are detected. /6/ [C] 4-8.2.14 The battery management system should be monitored and send any abnormal conditions to a location that can dispatch qualified personnel to evaluate the situation and make any necessary corrections or request additional support. 4-9 CHILD DEVELOPMENT PROGRAMS. Child Development Centers (CDC). Comply with UFC 4-740-14. For Navy, comply with FC 4-740-14N. Continuous Child Care Facilities (24/7). Comply with UFC 4-740-15. Other Child Development Programs. Other child development programs include part-day, preschool, kindergarten, before and after school programs, school-age Facilities, etc. Comply with the provisions of educational occupancies in NFPA 101. Youth Centers. Youth centers must comply with UFC 4-740-06. 4-10

DAFI 34-114 · para 3.4 as of 2026-06-23 · View in PDF → · official source ↗

s/booths will not be installed or used in Fitness and Sports Centers. (T-1) DAFI34-114 15 DECEMBER 2022 29 Table 3.4. Enhanced Services (See Notes). 1. Massage Therapists * Therapists must have a license or have completed 500 hours of study and passed state certification or the National Certification Examination for Therapeutic Massage and Bodywork. (T-1) Overseas therapists must meet local country’s certification and licensing requirements. (T1) 2. Resale Operations Resale services are nonappropriated fund operations. The operation should be self-sustaining. 3. Parent and Child Area** Coordination with the Child and Youth Services Flight Chief is required. Parent and child areas must follow applicable UFC 4-740-02 and DAF fitness & sports standards. (T-1) 4. Parent and Youth Area*** Coord

AFI 34-144 · para 3.2.3 as of 2019-07-02 · open official PDF ↗

1. Designed to meet fire, safety, health and sanitation standards and program needs. Include a minimum of 35 square feet of usable space per child or youth in each activity room with an additional 15 square feet per child for ages 6 weeks to 24 months of age. 3.2.2. Toilets and sinks are located within activity rooms used by children 5 years of age and under. Sinks and toilets shall be provided at ratios outlined in UFC 4-740-14. Sinks with running water shall be located adjacent to, but outside of, the toilet room or water closet space. 3.2.3. In pre-toddler, toddler and preschool activity rooms, provide a diaper changing unit with integral, retractable steps in compliance with UFC 4-740-14.36 AFI34-144 2 JULY 2019 3.2.4. Doors are not installed on toilet stalls for children in the Child

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.