Ask a compliance question

Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.

The question asks about UFC 4-440-01 but does not pose a specific question about the publication.

The passages provided include excerpts from UFC 4-440-01 (current as of 2014-10-01, with Change 1 dated 1 April 2019) covering sections on truck docks, rail docks, pallet racks, and system interfaces [UFC 4-440-01]. However, without a specific question about the content, requirements, or application of this Unified Facilities Criteria publication, I cannot provide a targeted answer.

Please rephrase your question to ask about a specific requirement, design standard, or provision within UFC 4-440-01 or related to warehouses and storage facilities.

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.
Show the 8 source passage(s) this answer is built from
UFC 4-440-01 as of 2014-10-01 · official source ↗

e 1, 1 April 2019 29 Figure 3-3 Truck Dock Configurations Plan Views and Section UFC 4-440-01 1 April 2014 Change 1, 1 April 2019 30 Figure 3-4 Typical Truck Dock UFC 4-440-01 1 April 2014 Change 1, 1 April 2019 31 Figure 3-5 Truck Apron Section UFC 4-440-01 1 April 2014 Change 1, 1 April 2019 32 Figure 3-6 Door Size Characteristics Perspective View and Sections UFC 4-440-01 1 April 2014 Change 1, 1 April 2019 33 3-4.2 Rail Docks If rail access is available include provisions for rail docks (see figure 3-7) as an option in the design of all storage facilities exceeding 40,000 square feet (3716 sq. m). There are three primary types of rail dock: Figure 3-7 Rail Car Characteristics Section and Elevations UFC 4-440-01 1 April 2014 Change 1, 1 April 2019 34 3-4.2.1 Outside Docks Outside rail d

UFC 4-440-01 as of 2014-10-01 · official source ↗

urrent electronic version prior to use to ensure that they are current. AUTHORIZED BY: JAMES C. DALTON, P.E. JOSEPH E. GOTT, P.E. Chief, Engineering and Construction Chief Engineer U.S. Army Corps of Engineers Naval Facilities Engineering Command JOE SCIABICA, SES MICHAEL McANDREW Director Director, Facilities Investment and Management Air Force Civil Engineer Center Office of the Deputy Under Secretary of Defense (Installations and Environment) UFC 4-440-01 1 April 2014 Change 1, 1 April 2019 UNIFIED FACILITIES CRITERIA (UFC) NEW SUMMARY SHEET Document: UFC 4-440-01, WAREHOUSES AND STORAGE FACILITIES Superseding: UFC 4-440-01A Storage Depots and UFC 4-442-01N Design; Covered Storage. Description: This new UFC, "WAREHOUSES AND STORAGE FACILITIES" replaces UFC 4-440-01A, Storage Depots (Arm

UFC 4-440-01 as of 2014-10-01 · official source ↗

etween backs of racks and walls. • Standard pallet racks provide a minimum 4-inch (100 mm) transverse flue space. UFC 4-440-01 1 April 2014 Change 1, 1 April 2019 61 Figure 3-16 Pallet Rack Fire Protection Terminology Perspective View UFC 4-440-01 1 April 2014 Change 1, 1 April 2019 62 3-7.11.4 Attachment Securely attach all pallet racks to floors, walls, and each other, to ensure stability and safety. 3-7.11.5 System Interface Interface operations with pallet rack using pickup and delivery (P&D) stations, as illustrated in figure 3-17. Provide additional cross-aisle width to accommodate these P&D stations. UFC 4-440-01 1 April 2014 Change 1, 1 April 2019 63 Figure 3-17 Pickup and Delivery (P&D) Stations Perspective Views and Plan Views UFC 4-440-01 1 April 2014 Change 1, 1 April 2019 64 3

UFC 3-420-01 as of 2021-04-01 · official source ↗

ing Systems UFC 3-440-01, Facility-Scale Renewable Energy Systems UFC 3-501-01, Electrical Engineering UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings UFC 4-010-06, Cybersecurity of Facility-Related Control Systems UFC 4-440-01, Warehouses and Storage Facilities UFC 4-510-01, Design: Military Medical Facilities CANCELLED 46 UFC 3-420-01 01 April 2021 UNITED STATES DEPARTMENT OF DEFENSE, UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS) http://dod.wbdg.org UFGS 22 00 00, Plumbing, General Purpose UFGS 23 03 00.00 20, Basic Mechanical Materials and Methods UFGS 23 07 00, Thermal Insulation for Mechanical Systems CANCELLED 47 UFC 3-420-01 01 April 2021 APPENDIX C DESIGN GUIDANCE FOR EMERGENCY SHOWER AND EYEWASH STATIONS C-1

UFC 3-440-01 as of 2015-07-01 · official source ↗

ance of the reference is used. UFC 3-440-01 01 July 2015 3 1-9 BEST PRACTICES Appendix B contains background information and best practices for accomplishing certain renewable energy design and engineering services. 1-10 GLOSSARY Appendix C contains acronyms, abbreviations, and terms. 1-11 ADDITIONAL RESOURCES For additional resources on renewable energy applications and systems, refer to the Whole Building Design Guide (WBDG) Internet site: http://www.wbdg.org/resources/. UFC 3-440-01 01 July 2015 4 This Page Intentionally Left Blank UFC 3-440-01 01 July 2015 5 CHAPTER 2 SOLAR THERMAL TECHNICAL REQUIREMENTS 2-1 GENERAL REQUIREMENTS 2-1.1 Economic Feasibility Study As required in UFC 1-200-02, Section 523 of the Energy Independence and Security Act (EISA) 2007 requires that at least 30% of

UFC 3-301-01 as of 2023-04-11 · official source ↗

etermination of Depth of Freeze and Thaw in Soil – Arctic and Subarctic Construction UFC 3-220-01, Geotechnical Engineering UFC 3-460-01, Design: Petroleum Fuel Facilities UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings UFC 4-010-06, Cybersecurity Of Facility-Related Control Systems UFC 4-023-03, Design of Buildings to Resist Progressive Collapse \5\ (Inactive) /5/ UFC 4-152-01, Design: Piers and Wharves UFC 4-440-01, Warehouses and Storage Facilities UNIFIED FACILITIES GUIDE SPECIFICATIONS https://www.wbdg.org/dod/ufgs UFGS 01 45 35 Special Inspections CANCELLED UFC 3-301-01 11 April 2023 Change 6, 30 January 2026 208 I-2 STATE GOVERNMENT. CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS Article 3137, Seismic Requirements for Elevators, Escalators and Moving Walks, Subchapter

FC 4-760-10N as of 2013-12-01 · official source ↗

ineering for Facilities UFC 4-010-05, Sensitive Compartmented Information Facilities Planning, Design, and Construction UFC 4-020-01, DoD Security Engineering Facilities Planning Manual UFC 4-021-02, Electronic Security Systems UFC 4-440-01, Design: Warehouses and Storage Facilities, currently in Draft and anticipated to be published January 2014. UFC 4-610-01, Administrative Facilities UFC 4-740-20, Libraries UFGS 23 09 23.13 20, BACnet Direct Digital Control Systems for HVAC DEPARTMENT OF THE NAVY OPNAVINST 5450.342, Mission, Functions, and Tasks of the Naval History and Heritage Command OPNAVINST 5530.13C Physical Security Instruction for Conventional Arms, Ammunition, and Explosives (AA&E) SECNAVINST 4000.35A, Cultural Resources Program SECNAVINST M-5510.36, Information Security Progra

UFC 3-540-08 as of 2017-01-23 · official source ↗

riteria and UFC 1-200- 01. Refer to UFC 3-440-05N (for Navy). For other Agencies, use UFC 3-440-05N as a reference and comply with Agency specific guidance for design and construction of electrical power systems in temperate areas. 3-2.3 Permitting. Comply with paragraph titled “DESIGN APPROVALS AND PERMITS” in UFC 3-201-01 for permitting requirements. UFC 3-540-08 23 January 2017 16 3-2.4 Interconnection Analysis and Coordination. Contact the local utility provider for utility-specific interconnection equipment and ownership requirements in the design concept stage due to utility-specific requirements. Refer to Chapter 8 titled “UTILITY INTERCONNECTION” for guidance. 3-3 DESIGN CRITERIA. Address mounting systems, solar PV modules, raceways and DC cabling, system grounding, lightning prote

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.