Ask a compliance question

Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.

Not found in the indexed publications — check the official source.

The passages provided reference UFC 4-229-01N but do not contain its substantive design criteria content. The document appears in citations and a title page marking it INACTIVE as of 16 January 2004, and one passage references it for maintenance facilities design [FC 2-000-05N]. To access the actual design requirements for general maintenance facilities, you must consult the official UFC 4-229-01N document directly.

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.
NFPA standards (cited by reference)
NFPA 780 Installation of Lightning Protection Systems — cited by AFSOCI 32-1084 (sections 8.1.1, 8) · read at NFPA free access ↗
NFPA 33 — cited by AFSOCI 32-1084 · read at NFPA free access ↗

NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.

Show the 8 source passage(s) this answer is built from

UFC 4-229-01N 16 January 2004 UNIFIED FACILITIES CRITERIA (UFC) DESIGN: GENERAL MAINTENANCE FACILITIES APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED INACTIVE UFC 4-229-01N 16 January 2004 UNIFIED FACILITIES CRITERIA (UFC) DESIGN: GENERAL MAINTENANCE FACILITIES Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEERING SUPPORT AGENCY Record of Changes (changes indicated by \1\ ... /1/ ) Change No. Date Location INACTIVE UFC 4-229-01N 16 January 2004 FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides plann

UFC 4-229-01N · para 28.4 as of 2004-01-16 · official source ↗

0-01 take precedence. 1-2.4 ANTITERRORISM/FORCE PROTECTION. All DoD facilities must comply with UFC 4-010-01, Design: DoD Minimum Antiterrorism Standards for Buildings. If any conflict occurs between this UFC and UFC 4-010-01, the requirements of UFC 4-010-01 take precedence. INACTIVE UFC 4-229-01N 16 January 2004 A-1 APPENDIX A DESIGN MANUAL 28.4 GENERAL MAINTENANCE FACILITIES INACTIVE ÚÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄÄ¿ ³ CCB Application Notes: ³ ³ ³ ³ 1. Character(s) preceded & followed by these symbols (À Ù) or (Ú ¿) ³ ³ are super- or subscripted, respectively. ³ ³ EXAMPLES: 42mÀ3Ù = 42 cubic meters ³ ³ COÚ2¿ = carbon dioxide ³ ³ ³ ³ 2. All degree symbols have been replaced with the word deg. ³ ³ ³ ³ 3. All plus or minus symbols have been replaced w

FC 2-000-05N as of 2026-02-11 · official source ↗

each side. Where multiple canopies are observed, each will have its own facility number and PRC. • In the “Notes” section of all associated PRCs, delineate the site location for references purposes. 214 56 GREASE RACK (EA) FAC: 2145 BFR Required: N CANCELED UFC 2-000-05N 200 Series - 191 21456-1 One grease rack (two vehicles) will be provided for each 125 vehicles. 215 MAINTENANCE - WEAPONS, SPARES 215-1 This group includes facilities for maintenance of small arms, automatic weapons, mortars, artillery guns, launchers, flamethrowers, torpedo tubes, harbor protective nets, and non-electronic equipment. See UFC 4-229-01N for design criteria. For missile maintenance facilities, see Category Group 212. 215 10 SMALL ARMS SHOP (SF) FAC: 2152 BFR Required: Y 21510-1 A small arms shop is used to s

AFSOCI 32-1084 · para 7.4.37 as of 2023-02-21 · open official PDF ↗

tant drains. Applicable criteria include UFC 3-401-01 for mechanical & UFC 3-410-01 for HVAC. Electrical Industrial equipment typically requires 240- and 480-volt, three-phase electrical current. Use commercial grade convenience receptacles and special power outlets. Consult X-ray and other NDI equipment specifications for their specific power requirements. Applicable criteria include UFC 3-501-01 for general electrical requirements, UFC 3-520-01 for interior electrical systems requirements, UFC 3-530-01 for interior and exterior lighting and controls requirements, UFC 3-550-01 for exterior power distribution systems requirements, UFC 3-560-01 for electrical safety and electrical O&M requirements, UFC 3-580-01 for building telecommunications requirements, and UFC 4-021-01 for mass notifica

UFC 4-141-10 as of 2022-09-22 · official source ↗

UFC 1-200-01 General Building Requirements UFC 2-000-05N Facility Planning Criteria for Navy/Marine Corps Shore Installations UFC 3-101-01 Architecture UFC 3-110-03 Roofing UFC 3-201-01 Civil Engineering UFC 3-220-01 Geotechnical Engineering UFC 3-250-01 Pavement Design for Roads and Parking Areas UFC 3-260-01 Airfield and Heliport Planning and Design UFC 3-260-04 Airfield and Heliport Marking UFC 3-301-01 Structural Engineering UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings UFC 4-141-10 22 September 2022 6 UFC 4-022-03 Security Fences and Gates UFC 3-401-01 Mechanical Engineering UFC 3-410-01 Heating, Ventilating and Air Conditioning Systems UFC 3-420-01 Plumbing Systems UFC 3-450-01 Noise and Vibration Control UFC 3-460-01 Design: Petroleum Fuel Facilities UFC 3-501-01 El

UFC 4-711-01 as of 2018-08-10 · official source ↗

/dod/ufc /3/ UFC 1-200-01, DoD Building Code UFC 1-200-02, High Performance and Sustainable Building Requirements (applicable to multi-family housing) UFC 2-100-01, Installation Master Planning UFC 3-101-01, Architecture UFC 3-110-03, Roofing UFC 3-120-10, Interior Design UFC 3-210-10, Low Impact Development UFC 3-301-01, Structural Engineering \3\ /3/ UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 3-450-01, Noise and Vibration Control UFC 3-530-01, Interior and Exterior Lighting Systems and Controls UFC 3-550-01, Exterior Electrical Power Distribution UFC 3-570-01, Cathodic Protection UFC 3-600-01, Fire Protection Engineering For Facilities UFC 3-810-01N, Navy and Marine Corps Environmental Engineering for Facility Construction UFC 4-01

UFC 3-530-01 as of 2023-02-09 · official source ↗

.wbdg.org/ffc/dod/unified-facilities-criteria-ufc UFC 1-200-01, DoD Building Code UFC 1-200-02, High Performance and Sustainable Building Requirements UFC 3-101-01, Architecture UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-490-06, Elevators UFC 3-535-01, Visual Air Navigation Facilities UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-06, Cybersecurity of Facility-Related Control Systems UFC 4-020-01, DoD Security Engineering Facilities Planning Manual UFC 4-021-02, Electronic Security Systems UFC 4-022-01, Security Engineering: Entry Control Facilities/Access Control Points UFC 4-025-01, Security Engineering: Waterfront Security UFC 4-152-01, Design: Piers and Wharves UFC 4-510-01, Design: Military Medical Facilities UFC 4-740-02, Fitness Centers UFC 4-7

UFC 1-200-01 as of 2022-09-01 · official source ↗

nterior Design UFC 3-190-06, Protective Coatings and Paints UFC 3-201-01, Civil Engineering UFC 3-201-02, Landscape Architecture UFC 3-210-10, Low Impact Development UFC 3-220-01, Geotechnical Engineering UFC 3-230-01, Water Storage and Distribution UFC 3-230-03, Water Treatment UFC 3-240-01, Wastewater Collection and Treatment UFC 3-301-01, Structural Engineering UFC 3-301-02, Design of Risk Category V Structures, National Strategic Military Assets UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems CANCELLED UFC 1-200-01 01 September 2022 Change 4, 17 December 2024 71 UFC 3-420-01, Plumbing Systems UFC 3-430-05, Natural Gas and Liquefied Petroleum Gas (LPG) Distribution Pipelines UFC 3-460-01, Design: Petroleum Fuel Facilities UFC 3-490-0

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.