Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.
Showing the controlling passages directly. (daily question limit reached — showing passages)
ecember 2014 APPENDIX B DRAWINGS B-1 A PROTOTYPE ARMORY. The plan below is a prototype armory plan. 36 UFC 4-215-01 1 December 2014 B-2 ISSUE PORT. The drawings below are a preferred design for an issue port. All steel materials for the issue port must be hot-dip galvanized. Wall Section at Issue Port 37 UFC 4-215-01 1 December 2014 A. Exterior Wall Elevation of Issue Port The issue port maximum opening is 190 square inches (15” x 12.5” = 187.5 sq in). 38 UFC 4-215-01 1 December 2014 B. Inside Issue Port Door Elevation 39 UFC 4-215-01 1 December 2014 C. Issue port Half Plate Plan 40 UFC 4-215-01 1 December 2014 B-3 TYPICAL ARMS ROOM. 41 UFC 4-215-01 1 December 2014 APPENDIX C GLOSSARY ACRONYMS AA&E Arms, Ammunition and Explosives AFCEC Air Force Civil Engineer Center AFI Air Force Instruct
3-410-04, Industrial Ventilation UFC 3-530-01, Design: Interior and Exterior Lighting and Controls UFC 4-020-01, DoD Security Engineering Facilities Planning Manual UFC 4-021-01, Design and O&M: Mass Notification Systems UFC 4-021-02, Electronic Security Systems 33 UFC 4-215-01 1 December 2014 UFC 4-022-03, Security Fences and Gates UFC 4-420-01, Ammunition and Explosive Storage Magazines UNIFIED FACILITIES GUIDE SPECIFICATIONS http://www.wbdg.org/ccb/browse_cat.php?c=3 UFGS 23 09 23.13 20, BACnet Direct Digital Control Systems for HVAC UFGS 23 09 23, Lonworks Direct Digital Control for HVAC and Other Building Control Systems 34 UFC 4-215-01 1 December 2014 This Page Intentionally Left Blank 35 UFC 4-215-01 1 December 2014 APPENDIX B DRAWINGS B-1 A PROTOTYPE ARMORY. The plan below is a pro
UFC 4-215-01 1 December 2014 UNIFIED FACILITIES CRITERIA (UFC) ARMORIES AND ARMS ROOMS APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED UFC 4-215-01 1 December 2014 UNIFIED FACILITIES CRITERIA (UFC) ARMORIES AND ARMS ROOMS Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location UFC 4-215-01 1 December 2014 FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and mo
dings UFC 4-020-01, DoD Security Engineering Facilities Planning Manual CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 161 UFC 4-021-01, Design and O&M: Mass Notification Systems UFC 4-150-02, Dockside Utilities for Ship Service UFC 4-151-10, General Criteria for Waterfront Construction UFC 4-152-01, Design: Piers and Wharves UFC 4-159-01N, Design: Hyperbaric Facilities UFC 4-211-01, Aircraft Maintenance Hangars UFC 4-211-02, Aircraft Corrosion Control and Paint Facilities UFC 4-213-10, Design: Graving Drydocks UFC 4-213-12, Drydocking Facilities Characteristics UFC 4-215-01, Armories and Arms Rooms UFC 4-310-03, DoD Fuels Laboratory Standards UFC 4-510-01, Design: Medical Military Facilities UFC 4-740-06, Youth Centers UFC 4-740-14, Design: Child Development Centers UNITED STAT
uildings UFC 4-020-01, DoD Security Engineering Facilities Planning Manual UFC 4-020-02, DoD Security Engineering Facilities Design Manual, (currently in draft and unavailable) UFC 4-021-02NF, Security Engineering Electronic Security Systems UFC 4-020-04A, Electronic Security Systems: Security Engineering UFC 4-215-01 Armories and Arms Rooms UNITED STATES MARINE CORPS MCO 3570.1C, Range Safety MCO P3350.10, Policy and Procedures for Range and Training Area (RTA) Management Range Managers Toolkit (RMTK) – check with sponsor
rior power distribution systems requirements, UFC 3-560-01 for electrical safety and electrical O&M requirements, UFC 3-580-01 for building telecommunications requirements, and UFC 4-021-01 for mass notification systems requirements. AFSOCI32-1084 24 JUNE 2022 215 Plumbing Place emergency shower/eye wash stations as per OSHA standards and connect to an alarm system to alert personnel in case of an emergency. Recommend using domestic water plumbed eyewash stations in the maintenance and storage functions. Applicable criteria include UFC 3-420- 01 for plumbing. Fire Protection Provide fire protection in accordance with UFC 3-600-01. Fire suppression, fire detection, and alarm systems shall be compatible with the base centralized fire detection system. Communication This facility follows stan
al Security Program AR 190-17, Biological Select Agents and Toxins Security Program AR 380-27, Control of Compromising Emanations DEPARTMENT OF DEFENSE DoDM 5105.21, Volume 2, Sensitive Compartmented Information (SCI) Administrative Security Manual: Administration of Physical Security, Visitor Control, and Technical Security) DoDI 5210.65, Security Standards for Safeguarding DoD Chemical Agents DoDI 5210.88, Security Standards for Safeguarding Biological Select Agents and Toxins (BSAT) DoDI 8500.01, Cybersecurity DoDI 8510.01, Risk Management Framework for DoD Systems UNITED STATES DEPARTMENT OF DEFENSE, UNIFIED FACILITIES CRITERIA UFC 4-021-01, Design and O&M: Mass Notification Systems UFC 4-026-01, Design to Resist Forced Entry UFC 4-215-01, Armories and Arms Rooms UFC 4-021-02 28 July 2
urve UFC 3-250-01 14 November, 2016 215 Figure E-24 Truck, Small Pickup, or SUV Flexible Pavement Design Curve UFC 3-250-01 14 November, 2016 216 Figure E-25 Truck, Large Pickup, or SUV Flexible Pavement Design Curve UFC 3-250-01 14 November, 2016 217 Figure E-26 Truck 3-Axle Flexible Pavement Design Curve UFC 3-250-01 14 November, 2016 218 Figure E-27 Truck 4-Axle Flexible Pavement Design Curve UFC 3-250-01 14 November, 2016 219 Figure E-28 Truck 5-Axle Flexible Pavement Design Curve UFC 3-250-01 14 November, 2016 220 Figure E-29 Truck 2-Axle, 6-Tire Flexible Pavement Design Curve UFC 3-250-01 14 November, 2016 221 Figure E-30 TYC-850L Container Truck Flexible Pavement Design Curve UFC 3-250-01 14 November, 2016 222 Figure E-31 75BFMII Mobile Crane Flexible Pavement Design Curve UFC 3-250
NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.