Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.
UFC 4-214-02 24 July 2003 UNIFIED FACILITIES CRITERIA (UFC) ARMY TACTICAL EQUIPMENT MAINTENANCE FACILITIES (TEMF) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED INACTIVE UFC 4-214-02 24 July 2003 1 UNIFIED FACILITIES CRITERIA (UFC) ARMY TACTICAL EQUIPMENT MAINTENANCE FACILITIES (TEMF) Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS (Preparing Activity) NAVAL FACILITIES ENGINEERING COMMAND AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location 1 10 Sept 2003 Corrected Reference from MIL-HNBK-1008C to UFC 4- 214-02 in Statement of Work. INACTIVE UFC 4-214-02 2
___________ UFC 4-214-02, TEMF, 24 Jul 03 ATTACHMENT 4 Reserved ATT 4-i INACTIVE Project Name Project No. ___________ UFC 4-214-02, TEMF, 24 Jul 03 ATTACHMENT 5 PROPOSAL DRAWING FORMAT ATT 5-i INACTIVE Project Name Project No. ___________ UFC 4-214-02, TEMF, 24 Jul 03 ATTACHMENT 5 PROPOSAL DRAWING FORMAT NOTE TO USACE DESIGN ACTIVITY: TECHNICAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS are stated in Section 00110A. Inclusion of additional drawing format standards in the RFP is optional. If this attachment is used, it should be coordinated with Section 00110A. 1. POLICY. Drawings shall be prepared in accordance with Section 00110A, PHASE 2 TECHNICAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS, and the following instructions on graphic format. 2. DRAFTING. a. The drawings shall show sufficient
own reproduction as well as reproduction for Government use. The Government will require twice the number of copies of the plans and specifications as were required for the review stages, no color boards will be required. The originals will be retained by the Contractor for recording of as-built conditions. Upon completion of the project, the original design documents corrected to reflect as-built conditions will be supplied to the Government. Section 01012 - Page 17 INACTIVE Project Name Project No. ___________ UFC 4-214-02, TEMF, 24 Jul 03 ATTACHMENT 2 RESERVED ATT 2 - i INACTIVE Project Name Project No. ___________ UFC 4-214-02, TEMF, 24 Jul 03 ATTACHMENT 3 Reserved ATT 3-i INACTIVE Project Name Project No. ___________ UFC 4-214-02, TEMF, 24 Jul 03 ATTACHMENT 4 Reserved ATT 4-i INACTIV
proper protocol and safeguarding of electronically transmitted data are consistent with DoD standards, as outlined in DoD 5015.02-STD and DoDI 5400.11. 2.4. SECRETARIES CONCERNED. The Secretaries concerned: a. Provide members who are separated or released from active service a DD Form 214 containing a concise summary of service, as directed in Section 3. b. Provide Reserve Component members who are separated or released from their component a DD Form 214 and DD Form 214-1 containing a concise summary of service, as directed in Section 3. Service implementation and issuance of the DD Form 214-1, as directed in Section 3, is required within 3 years of publication of this issuance. c. Issue, in accordance with the safeguard requirements in DoD 5400.11-R, appropriate instructions for safeguard
rmine the space requirements. 21560-2 For other field maintenance functions, see Category Codes 214 53, 217 30, and 218 80. 216 MAINTENANCE AMMUNITION, EXPLOSIVES & TOXICS 216-1 DEFINITION. This group includes facilities for maintenance of ammunition, rockets, bombs, mines, grenades, torpedoes, depth charges, demolition materials, pyrotechnics, missile fuels, and related chemicals. OPNAV Instruction 8000.16 series provides maintenance policies, procedures, and responsibilities for the conduct of the Naval Ordnance Maintenance Management Program. Siting criteria and guidance on standard operating procedures for these facilities can be found in NAVSEA OP-5 Vol. 1. Consult the design criteria, UFC 4-216-02, when developing space requirements. 216 05 CHANGE/RELIEF HOUSE (SF) FAC: 2162 BFR Requ
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.