Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.
Showing the controlling passages directly. (daily question limit reached — showing passages)
UFC 4-213-12 19 June 2003 UNIFIED FACILITIES CRITERIA (UFC) DRYDOCKING FACILITIES CHARACTERISTICS APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED INACTIVE UFC 4-213-12 5 June 2003 UNIFIED FACILITIES CRITERIA (UFC) DRAFT DRYDOCKING FACILITIES CHARACTERISTICS Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location INACTIVE UFC 4-213-12 19 June 2003 FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, desi
or Fire Protection _______Same as salt water Compressed Air______6" mains, 10,000 cfm at 80 psi, fifty-six 1-1/4" outlets each side. 3" headers at dock floor with outlets Steam___ __________ 6" & 12" mains, 80,000 phr at 150 psi, fourteen 2-1/2” outlets each side Oxygen ____________3" mains, 1,650 cfm at 100 psi, seven 1" outlets each side Sanitary sewer ______10" east side main, gpm, sixteen 4" inlets each side 53 INACTIVE UFC 4-213-12 19 June 2003 Figure 29 Location of Drydock, San Diego Naval Station, San Diego, California 54 INACTIVE UFC 4-213-12 19 June 2003 Figure 30 San Diego Naval Station Drydock No 1 55 INACTIVE UFC 4-213-12 19 June 2003 Table 25 San Diego Naval Station Drydock No. 1 Date Completed Suitable for Docking Foundation Construction Material 1942 AS Earth Concrete Closur
/2" mains, 700 cfm at 90 psi, twenty 3/4" outlets each side CHT sewer ___________6", 8" and 10" mains, twenty-six 4" inlets each side 24 INACTIVE UFC 4-213-12 19 June 2003 Figure 13 Location of Drydocks, Pearl Harbor Naval Shipyard, Oahu, Hawaii 25 INACTIVE UFC 4-213-12 19 June 2003 Figure 14 Pearl Harbor Naval Shipyard Drydock No. 1 26 INACTIVE UFC 4-213-12 19 June 2003 Table 11 Pearl Harbor Naval Shipyard Drydock No. 1 Date Completed Suitable for Docking Foundation Construction Material 1919 CVA PIles Concrete Closure Caisson, steel (rectangular box type). Dewatering Pumps Four 48", 500 hp, 264,000 gpm. Also connected to Drydock No. 2 pumphouse. Time to dewater: 140 min Drainage Pumps Two 15", 85 hp, 13,750 gpm Flooding Through caisson and culverts. Time to flood: 60 min. Superflooding p
dings UFC 4-020-01, DoD Security Engineering Facilities Planning Manual CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 161 UFC 4-021-01, Design and O&M: Mass Notification Systems UFC 4-150-02, Dockside Utilities for Ship Service UFC 4-151-10, General Criteria for Waterfront Construction UFC 4-152-01, Design: Piers and Wharves UFC 4-159-01N, Design: Hyperbaric Facilities UFC 4-211-01, Aircraft Maintenance Hangars UFC 4-211-02, Aircraft Corrosion Control and Paint Facilities UFC 4-213-10, Design: Graving Drydocks UFC 4-213-12, Drydocking Facilities Characteristics UFC 4-215-01, Armories and Arms Rooms UFC 4-310-03, DoD Fuels Laboratory Standards UFC 4-510-01, Design: Medical Military Facilities UFC 4-740-06, Youth Centers UFC 4-740-14, Design: Child Development Centers UNITED STAT
piling, if storm runoff results in heavy soil loss. 10-3.3 Future Inspection Requirements. Where the rate of erosion or settlement has been increasing the structure must be closely monitored to provide early warning of impending failure. Where a major problem has been encountered and corrected, increased inspection may be necessary to ensure that the repair is effective. UFM 4-150-07 10 March 2026 193 APPENDIX A REFERENCES GOVERNMENT PUBLICATIONS Unified Facilities Criteria (UFC): https://www.wbdg.org/dod/ufc UFC 3-220-01, Geotechnical Engineering UFC 3-220-10, Soil Mechanics UFC 3-301-01, Structural Engineering UFC 3-570-01, Cathodic Protection UFC 4-151-10, General Criteria for Waterfront Construction UFC 4-152-01, Piers and Wharves UFC 4-213-10, Graving Drydocks UFC 4-213-12, Drydocking
3-220-01, Geotechnical Engineering UFC 4-152-01 24 January 2017 Change 1, 28 August 2024 161 UFC 3-301-01, Structural Engineering UFC 3-530-01, Interior and Exterior Lighting Systems and Controls UFC 3-570-01, Cathodic Protection UFC 4-025-01, Security Engineering: Waterfront Security UFC 4-150-02, Dockside Utilities for Ship Service UFC 4-150-06, Military Harbors and Coastal Facilities UFC 4-150-08, Inspection of Mooring Hardware UFC 4-152-07, Small Craft Berthing Facilities UFC 4-159-03, Moorings UFC 4-213-12, Dry Docking Facilities Characteristics UFC 4-860-03, Railroad Track Maintenance and Safety Standards UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS) https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs UFGS 03 31 29, Marine Concrete UFGS 35 59 13.16, Marine Fend
ptember 2018 Change 3, 1 July 2021 31 UFC 3-420-01, Plumbing Systems UFC 3-520-01, Interior Electrical Systems UFC 3-535-01, Visual Air Navigation Facilities UFC 3-570-01, Cathodic Protection UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-06, Cybersecurity of Facility-Related Control Systems UFC 4-150-02, Dockside Utilities for Ship Service UFC 4-213-12, Drydocking Facilities Characteristics DEPARTMENT OF DEFENSE (DOD), UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS) http://dod.wbdg.org/ UFGS 33 11 00, Water Utility Distribution Piping EXECUTIVE ORDER Executive Order 13693, Planning for Federal Sustainability in the Next Decade, March 19, 2015 GREAT LAKES – UPPER MISSISSIPPI RIVER BOARD OF STATE AND PROVINCIAL PUBLIC HEALTH AND ENVIRONMENTAL MANAGERS http://10statesstand
Airport Design, 2.1.4. AC 150/5210-20, Ground Vehicle Operations to include Taxiing or Towing an Aircraft on Airports, 2.1.5. AC 150/5340-1, Standards for Airport Markings, 2.1.6. AC 150/5340-18, Standards for Airport Sign Systems, 2.1.7. AC 150/5340-30, Design and Installation Details for Airport Visual Aids, 2.1.8. AFMAN 11-202 Volume 3, Flight Operations, 2.1.9. AFMAN 13-204 Volume 3, Air Traffic Control, 2.1.10. DAFI 13-213, Airfield Driving, 2.1.11. DAFI 21-101, Aircraft and Equipment Maintenance Management, 2.1.12. FAA-H-8083-25, Pilot’s Handbook of Aeronautical Knowledge, 2.1.13. International Civil Aviation Organization (ICAO) Doc 9476-AN/927, Manual of Surface Movement Guidance Control Systems (SMGCS), 2.1.14. UFC 3-260-01, Airfield and Heliport Planning and Design, 2.1.15. UFC 3
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.