Ask a compliance question

Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.

Not found in the indexed publications — check the official source.

The passages provided are revision summary sheets and reference lists from UFC 4-152-07 and related waterfront construction documents. They describe what was changed or deleted from earlier versions and list related UFC documents, but they do not contain substantive technical criteria, requirements, or design guidance that would constitute the actual content of UFC 4-152-07.

To access UFC 4-152-07 itself, consult the official Unified Facilities Criteria repository at https://www.wbdg.org/dod/ufc.

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.
Show the 8 source passage(s) this answer is built from
UFC 4-152-07 as of 2009-07-14 · official source ↗

epair/maintenance • Deleted section on hardware supply store • Deleted section on transient housing facilities • Deleted section on layout of utilities • Deleted section on perimeter fencing • Deleted section on signs • Deleted section on environmental factors and protection • Deleted section on summary of common design problems • Overall, made document shorter and more concise, relying on other applicable standards where applicable UFC-4-152-07 14 JULY 2009 Change 1, 1 September 2012 Reasons for Changes: • Previous UFC 4-152-07, dated 8 June 2005 was merely a UFC cover sheet applied to MIL-HDBK 1025/5 dated 30 September 1988. Therefore, this new UFC 4-152-07 provides current criteria to replace a document over 20 years old. Impact: There are negligible cost impacts. However, the following

UFC 4-152-07 as of 2009-07-14 · official source ↗

d Controls UFC 3-600-01, Fire Protection Engineering for Facilities UFC 3-601-02, Operations and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems UFC-4-152-07 14 JULY 2009 Change 1, 1 September 2012 69 UFC 4-150-02, Dockside Utilities for Ship Service UFC 4-150-06, Military Harbors and Coastal Facilities UFC 4-151-10, General Criteria for Waterfront Construction UFC 4-152-01, Design: Piers and Wharves UFC 4-159-03, Design: Moorings /1/

UFC 4-152-07 as of 2009-07-14 · official source ↗

1 September 2012 UNIFIED FACILITIES CRITERIA (UFC) REVISION SUMMARY SHEET Document: UFC 4-152-07 Superseding: UFC 4-152-07, dated 8 June 2005 Description of Changes: • Prepared document in proper UFC format • Expanded/updated references • Significantly expanded treatment/discussion of types/classes of small boats and craft • Deleted section on guest docks • Expanded discussion on aids to navigation • Abbreviated discussion on fixed versus floating berthing systems • Added section on covered versus uncovered berths • Added section on dead loads • Considerably reduced discussion on floating pier berthing systems • Added section on floating dock freeboard and stability • Expanded discussion on environmental (lateral) loading • Added section on berthing loads • Deleted section on design crite

UFC 4-151-10 as of 2001-09-10 · official source ↗

BLICATIONS 1. Unified Facilities Criteria (UFC): http://dod.wbdg.org \1\ UFC 1-200-01, General Building Requirements UFC 3-220-01N, Geotechnical Engineering Procedures for Foundation Design of Buildings and Structures UFC 3-220-10N Soil Mechanics UFC 3-301-01, Structural Engineering UFC 3-570-02N, Electrical Engineering Cathodic Protection UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-025-01, Waterfront Security Design; currently in final draft and near final publication UFC 4-150-06, Military Harbors and Coastal Facilities UFC 4-150-07, Maintenance of Waterfront Facilities UFC 4-150-08, Inspection of Mooring Hardware UFC 4-151-10 10 September 2001 With Change 1, 1 September 2012 32 UFC 4-152-01, Design: Piers and Wharves UFC 4-159-03, Design: Moorings /1/ Unified Faciliti

UFC 3-570-01 as of 2016-11-28 · official source ↗

nown to be affected by the requirements and criteria in this document. Table 1-1. UFC Documents Requiring Reconciliation of CP System Requirements and Criteria DOCUMENT TITLE UFC 3-230-01 Water Storage, Distribution and Transmission UFC 3-460-01 Design: Petroleum Fuel Facilities UFC 3-460-03 Operation and Maintenance: Maintenance of Petroleum Systems UFC 3-570-06 Operation and Maintenance: Cathodic Protection Systems UFC 4-150-07 Maintenance and Operation: Maintenance of Waterfront Facilities UFC 4-151-10 General Criteria for Waterfront Construction UFC 4-152-01 Design: Piers and Wharves UFC 3-570-01 28 November 2016 Change 1, 14 January 2019 4 CHAPTER 2 CATHODIC PROTECTION SYSTEM PLANNING 2-1 INTRODUCTON. In accordance with DoD Instruction 5000.67, Prevention and Mitigation of Corrosion o

UFM 4-150-07 as of 2026-03-10 · official source ↗

piling, if storm runoff results in heavy soil loss. 10-3.3 Future Inspection Requirements. Where the rate of erosion or settlement has been increasing the structure must be closely monitored to provide early warning of impending failure. Where a major problem has been encountered and corrected, increased inspection may be necessary to ensure that the repair is effective. UFM 4-150-07 10 March 2026 193 APPENDIX A REFERENCES GOVERNMENT PUBLICATIONS Unified Facilities Criteria (UFC): https://www.wbdg.org/dod/ufc UFC 3-220-01, Geotechnical Engineering UFC 3-220-10, Soil Mechanics UFC 3-301-01, Structural Engineering UFC 3-570-01, Cathodic Protection UFC 4-151-10, General Criteria for Waterfront Construction UFC 4-152-01, Piers and Wharves UFC 4-213-10, Graving Drydocks UFC 4-213-12, Drydocking

UFC 4-159-03 as of 2020-03-09 · official source ↗

f a CVN 68 in a Heavy Weather Mooring UFC 4-159-03 12 March 2020 194 TR-6027-OCN, Passing Ship Effects on Moored Ships TR-6028-OCN, Mooring USS TARAWA (LHA 1) Class Ships TR-6037-OCN, Improved Pearl Harbor and Kings Bay Anchor Designs TR-6045-OCN, LPD 17 USS SAN ANTONIO Class Berthing, Mooring and Anchoring TR-NAVFAC-EXWC-CI-1901, Revised Environmental Conditions for Mooring Service Types III and IV UNIFIED FACILITIES CRITERIA (UFC) https://www.wbdg.org/ffc/dod UFC 1-200-01, DoD Building Code UFC 3-301-01, Structural Engineering UFC 4-150-07, Maintenance and Operation: Maintenance of Waterfront Facilities UFC 4-150-08, Inspection of Mooring Hardware UFC 4-150-09, Permanent Anchored Moorings, Operations and Maintenance UFC 4-151-10, General Criteria for Waterfront Construction UFC 4-152-01,

MIL-HDBK-1763 · para 152.3.3 as of 1998-06-15 · official source ↗

il -- Downloaded: 2026-07-20T01:54Z Check the source to verify that this is the current version before use. MIL-HDBK-1763 APPENDIX A 94 152.3 Test preparation. MIL-STD-810, Method 515.4 should be as guidance in interpretation and implementation of the following. 152.3.1 Test article. The test article should be a full scale functional store. 152.3.2 Test equipment. The test article should be suspended in a suitable acoustic test chamber, acoustic wind tunnel, free jet flow facility or other suitable test facility. The test article should be suspended in such a manner that rigid body suspension frequencies are as low as possible. 152.3.3 Test instrumentation. The test instrumentation should include microphones to monitor the test acoustic fields. Additional instrumentation should be utilized

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.