UFC 4-150-02 as of 2020-11-12 · official source ↗

Pier Electrical Distribution: Typical Vault System (3 of 5) UFC 4-150-02 12 November 2020 178 Figure D-2 (d) Pier Electrical Distribution: Typical Vault System (4 of 5) UFC 4-150-02 12 November 2020 179 Figure D-2 (e) Pier Electrical Distribution: Typical Vault System (5 of 5) UFC 4-150-02 12 November 2020 180 Figure D-3 (a) Portable Substation (1 of 3) UFC 4-150-02 12 November 2020 181 Figure D-3 (b) Portable Substation (2 of 3) UFC 4-150-02 12 November 2020 182 Figure D-3 (c) Portable Substation (3 of 3) UFC 4-150-02 12 November 2020 183 Figure D-4 (a) Ship Service Outlet Assembly (1 of 2) UFC 4-150-02 12 November 2020 184 Figure D-4 (b) Ship Service Outlet Assembly (2 of 2) UFC 4-150-02 12 November 2020 185 Figure D-5 (a) Single Pole Connector Details UFC 4-150-02 12 November 2020 186

UFC 4-150-02 as of 2020-11-12 · official source ↗

D-1 (e) Electrical System for a Double-Deck Pier (5 of 9) UFC 4-150-02 12 November 2020 171 Figure D-1 (f) Electrical System for a Double-Deck Pier (6 of 9) UFC 4-150-02 12 November 2020 172 Figure D-1 (g) Electrical System for a Double-Deck Pier (7 of 9) UFC 4-150-02 12 November 2020 173 Figure D-1 (h) Electrical System for a Double-Deck Pier (8 of 9) UFC 4-150-02 12 November 2020 174 Figure D-1 (i) Electrical System for a Double-Deck Pier (9 of 9) UFC 4-150-02 12 November 2020 175 Figure D-2 (a) Pier Electrical Distribution: Typical Vault System (1 of 5) UFC 4-150-02 12 November 2020 176 Figure D-2 (b) Pier Electrical Distribution: Typical Vault System (2 of 5) UFC 4-150-02 12 November 2020 177 Figure D-2 (c) Pier Electrical Distribution: Typical Vault System (3 of 5) UFC 4-150-02 12 Nov

UFC 4-150-02 as of 2020-11-12 · official source ↗

0-02 12 November 2020 93 Figure 3-24 Pier Fiber Distribution Center EDC 1 Front Detail (Submarine Pier) UFC 4-150-02 12 November 2020 94 Figure 3-25 Fiber Optic Connectivity Riser Panel Detail UFC 4-150-02 12 November 2020 95 Figure 3-26 EDC Fiber Optic Patch Panel Surface Pier UFC 4-150-02 12 November 2020 96 Figure 3-27 EDC Fiber Optic Patch Panel Submarine Pier UFC 4-150-02 12 November 2020 97 Figure 3-28 Rubber Gasket Cutout Surface Pier UFC 4-150-02 12 November 2020 98 Figure 3-29 Rubber Gasket Cutout Submarine Pier UFC 4-150-02 12 November 2020 99 3-9.2 Telephone Systems. Provide a voice telephone distribution system to each berth on piers and at dry docks unless specifically instructed otherwise. Provision should be made for the telephone cable to be terminated in a telecommunicatio

UFC 4-152-07 as of 2009-07-14 · official source ↗

d Controls UFC 3-600-01, Fire Protection Engineering for Facilities UFC 3-601-02, Operations and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems UFC-4-152-07 14 JULY 2009 Change 1, 1 September 2012 69 UFC 4-150-02, Dockside Utilities for Ship Service UFC 4-150-06, Military Harbors and Coastal Facilities UFC 4-151-10, General Criteria for Waterfront Construction UFC 4-152-01, Design: Piers and Wharves UFC 4-159-03, Design: Moorings /1/

AFSOCI 32-1084 · para 2.4 as of 2023-02-21 · open official PDF ↗

02, Chapter 3, Section 6, Paragraph B). 7.2.12.4. Hangar Floors. See Paragraph 7.2.15, Maintenance Hangar. 7.2.12.5. Pavement Thickness Requirements. The AC-130J minimum base course pavement thickness required is 6 inches for flexible pavements (UFC 3-260-02, Table 8- 5) and 4 inches for rigid pavements (UFC 3-260-02, Chapter 8, Section 8, Paragraph A). Table 7.2.17. AC-130J Base Operations Ground Facility Space Requirements. Cat Code Facility UM AC- 130J (3)1 AC- 130J (9)1 AC- 130J (12)1 DAFMAN 32-1084 Reference or Remarks/Calculations 111- 111 Runway - Length (min) LF 3,500 3,500 3,500 Table 2.4 Runway Lengths: The minimum length for a C-130 landing zone runway is 3,500 ft. 111- 111 Runway - Width LF 150 150 150 UFC 3-260-01 Table 3.2: Class B Air Force airfield runway width, not otherwi

UFC 3-460-01 as of 2019-07-16 · official source ↗

-575-01, Lightning and Static Electricity Protection Systems UFC 3-580-01, Telecommunications Building Cabling Systems Planning and Design UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings UFC 4-020-01, DoD Security Engineering Facilities Planning Manual UFC 4-022-03, Security Fences and Gates UFC 4-150-02, Dockside Utilities for Ship Service UFC 4-150-06, Military Harbors and Coastal Facilities UFC 4-152-01, Design: Piers and Wharves UFC 4-179-01, Design: Navy Firefighting School Facilities \2\ UFC 4-310-03, DoD Fuels Laboratory Standards /2/ UFC 4-832-01N, Design: Industrial and Oily Wastewater Control UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 305 UFC 4-911-01N, O&M: Inactive Care and Closure of Shore Facilitie

UFC 4-213-10 as of 2020-05-18 · official source ↗

C 3-240-01, Wastewater Collection and Treatment UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-430-09, Exterior Mechanical Utility Distribution UFC 3-570-01, Cathodic Protection UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-06, Cybersecurity of Facility-Related Control Systems UFC 4-025-01, Waterfront Security Design UFC 4-150-02, Dockside Utilities for Ship Service UFC 4-150-06, Military Harbors and Coastal Facilities UFC 4-152-01, Piers and Wharves UFC 4-159-03, Moorings UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS) https://www.wbdg.org/ffc/dod UFGS 03 31 29, Marine Concrete with Service Life Modelling UFGS 03 31 30, Marine Concrete UFGS Division 26, Electrical UFGS 35 59 13.14 20, Polymeric Piles UFC 4-213-10 18 May 2020 137 U.S. ARMY CORPS

UFC 3-600-01 as of 2016-08-08 · official source ↗

dings UFC 4-020-01, DoD Security Engineering Facilities Planning Manual CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 161 UFC 4-021-01, Design and O&M: Mass Notification Systems UFC 4-150-02, Dockside Utilities for Ship Service UFC 4-151-10, General Criteria for Waterfront Construction UFC 4-152-01, Design: Piers and Wharves UFC 4-159-01N, Design: Hyperbaric Facilities UFC 4-211-01, Aircraft Maintenance Hangars UFC 4-211-02, Aircraft Corrosion Control and Paint Facilities UFC 4-213-10, Design: Graving Drydocks UFC 4-213-12, Drydocking Facilities Characteristics UFC 4-215-01, Armories and Arms Rooms UFC 4-310-03, DoD Fuels Laboratory Standards UFC 4-510-01, Design: Medical Military Facilities UFC 4-740-06, Youth Centers UFC 4-740-14, Design: Child Development Centers UNITED STAT

NFPA standards (cited by reference)
NFPA 780 Installation of Lightning Protection Systems — cited by AFSOCI 32-1084 (sections 8.1.1, 8) · read at NFPA free access ↗
NFPA 33 — cited by AFSOCI 32-1084 · read at NFPA free access ↗

NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.