Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.
Showing the controlling passages directly. (daily question limit reached — showing passages)
upport Building UFC 4-133-01 19 April 2016 Change 2, 25 June 2019 18 Figure 2-5 ATCT Functional Shaft without Support Building UFC 4-133-01 19 April 2016 Change 2, 25 June 2019 19 Figure 2-6 ATCT Functional Shaft with Support Building UFC 4-133-01 19 April 2016 Change 2, 25 June 2019 20 Figure 2-7 ATCT Functional Shaft - Standalone UFC 4-133-01 19 April 2016 Change 2, 25 June 2019 21 2-4.2 Radar Approach Control Facility (RACF). 2-4.2.1 Function. A Radar Approach Control Facility (RACF) controls aircraft by using installed radar to provide ATC services to Instrument Flight Rules (IFR) and Visual Flight Rules (VFR) air traffic within a certain assigned airspace. RACFs offer ATC services to aircraft arriving, departing, or transiting the airspace controlled by the facility. The RACF contains
l Requirements For use during project execution by the appropriate Service agency Occupancy Staff Other Min. net ft2 (m2) UFC 4-133-01 19 April 2016 Change 2, 25 June 2019 186 This Page Intentionally Left Blank UFC 4-133-01 19 April 2016 Change 2, 25 June 2019 187 APPENDIX A REFERENCES A-1 GOVERNMENT PUBLICATIONS UNIFIED FACILITIES CRITERIA (UFC) http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 1-200-01, General Building Requirements UFC 3-120-01, Air Force Sign Standard (to be superseded by unified version) UFC 3-210-02, POV Site Circulation and Parking UFC 3-250-01FA, Pavement Design for Roads, Streets, Walks and Open Storage Areas UFC 3-260-01, Airfield and Heliport Design and Planning UFC 3-260-02, Pavement Design for Airfields UFC 3-460-01, Design: Petroleum Fuel Facilities UFC 3-5
t. AUTHORIZED BY: JAMES C. DALTON, P.E. JOSEPH E. GOTT, P.E. Chief, Engineering and Construction Chief Engineer U.S. Army Corps of Engineers Naval Facilities Engineering Command EDWIN H. OSHIBA, SES, DAF MICHAEL McANDREW Deputy Director of Civil Engineers DASD (Facilities Investment and Management) DCS/Logistics, Engineering & Force Protection Office of the Assistant Secretary of Defense (Energy, Installations, and Environment) UFC 4-133-01 19 April 2016 Change 2, 25 June 2019 UNIFIED FACILITIES CRITERIA (UFC) NEW SUMMARY SHEET Document: UFC 4-133-01, Air Traffic Control and Air Operations Facilities Superseding: UFC 4-133-01N, Navy Air Traffic Control Facilities, 30 July 2007; UFC 4-141-10N, Design Aviation Support Facilities \1\ Section 6 and Section 8 and all other content relating to f
mage Repair, 12 August 2002 UFC 3-535-01, Visual Air Navigation Facilities, 17 November 2005 UFC 3-535-02, Design Drawings for Visual Air Navigation Facilities, 17 November 2005 UFC 4-010-01, DOD Minimum Antiterrorism Standards for Buildings with Change 1, 1 October 2013 UFC 4-133-01N, Navy Air Traffic Control Facilities, 24 February 2005 UFC 4-211-01N, Aircraft Maintenance Hangars: Type I, Type II and Type III with Change 3, 27 September 2007 OTHER PUBLICATIONS 120 ATP 3-17.2/MCRP 3-20B.1/NTTP 3-02.18/AFTTP 3-2.68 27 October 201814 Code of Federal Regulations, Aeronautics and Space, Part 65: Certification: Airmen other than Flight Crewmembers, Accessed 18 January 18 AMCI 11-211, Destination Airfield Suitability Analysis, 18 May 2017 Air Land Sea Bulletin, Issue number 2016-2, Summer 2016
4-141-10 22 September 2022 131 UNIFIED FACILITIES CRITERIA https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc UFC 1-200-01, DoD Building Code UFC 2-000-05N, Facility Planning for Navy and Marine Corps Shore Installation UFC 2-100-01, Installation Master Planning UFC 3-101-01, Architecture UFC 3-110-03, Roofing UFC 3-201-01, Civil Engineering UFC 3-220-01, Geotechnical Engineering UFC 3-250-01, Pavement Design for Roads and Parking Areas UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-301 01, Structural Engineering UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 4-133-01, Air Traffic Control and Air Operations Facilities UFC 3-450-01, Noise and Vibration Control UFC 3-460-01, Desi
c \2\ /2/ UFC 3-540-08, Utility-Scale Renewable Energy Systems, Air Force Civil Engineer Center, https://www.wbdg.org/dod/ufc UFC 3-575-01, Lightning and Static Electricity Protection Systems, U.S. Army Corps of Engineers, https://www.wbdg.org/dod/ufc UFC 3-600-01, Fire Protection Engineering for Facilities, Naval Facilities Engineering \2\ Systems /2/ Command, https://www.wbdg.org/dod/ufc UFC 4-020-01, DoD Security Engineering Facilities Planning Manual, U.S. Army Corps of Engineers, https://www.wbdg.org/dod/ufc \1\ UFC 4-022-03, Security Fences and Gates, https://www.wbdg.org/dod/ufc /1/ UFC 4-133-01, Air Traffic Control and Air Operations Facilities, Naval Facilities Engineering \2\ Systems /2/ Command, https://www.wbdg.org/dod/ufc UFC 4-211-01, Aircraft Maintenance Hangars: Type I and
ance (O&M): Generators 3-550-01, Exterior Electrical Power Distribution 3-580-01, Telecommunications Interior Infrastructure Planning and Design 4-010-01, DoD Minimum Antiterrorism Standards for Buildings 4-010-06, Cybersecurity of Facility-Related Control Systems 4-133-01, Air Traffic Control and Air Operations Facilities 4-141-04, Emergency Operations Center Planning and Design 4-141-10N, Design: Aviation Operation and Support Facilities (replaces MIL-HDBK 1024/1) 4-150-02, Dockside Utilities for Ship Service 4-211-01, Aircraft Maintenance Hangars 4-213-10, Graving Dry Docks 4-510-01, Design: Military Medical Facilities UFC 4-722-01F, Air Force Dining Facilities UFC 4-722-01N, Navy and Marine Corps Dining Facilities( UFC 3-540-01 1 August 2014 Change 4, 16 January 2026 31 4-730-04AN, Mil
ust be made with 2/0 AWG (133 kcmil) bare copper wire with exothermic or approved compression connections. For the ordnance ground, use minimum 2/0 AWG (133 kcmil) insulated conductor in PVC conduit to isolate from metallic objects. If a cathodic protection system is used, it must be a galvanic system and comply with requirements in UFC 3-570-01 Cathodic Protection. 3-8.6 Lightning Protection. Provide lightning protection per UFC 3-575-01, Lightning and Static Electricity Protection Systems, and the grounding requirements defined herein to protect the exposed portions of the facility. However, if justification can be provided per DESR 6055.09, then lightning protection is not mandatory. UFC 4-420-01 16 January 2025 31 • Lightning protection will incorporate the metallic (Faraday-like) cage
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.