UFC 3-600-01 as of 2016-08-08 · official source ↗

May 2021 iii CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 iv CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 v CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 vi CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 vii CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 viii CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 ix CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 x CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 xi CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 xii CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 xiii CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 xiv CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 xv CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 M

UFC 3-600-01 as of 2016-08-08 · official source ↗

n is needed to prevent change to Air Force facilities simply because it is different. Army Unification Issues: • Paragraph 4-3.4.8 – Provides additional requirements for facilities that support UAV or UAS.\4\ • /4/Paragraphs 9-6.3.2 and 9-18.2 – Requires fire protection shop drawings prepared under the immediate supervision of and sealed by a professional engineer, who must certify in writing that the system was installed as designed. CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 This Page Intentionally Left Blank CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 i TABLE OF CONTENTS CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 ii CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 iii CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 iv CANCEL

UFC 3-600-01 as of 2016-08-08 · official source ↗

1 must be utilized for protection from hazards. IBC requirements for separation of incidental uses are not permitted. CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 88 This Page Intentionally Left Blank CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 89 TYPES OF CONSTRUCTION 6-1 GENERAL. Conform to the requirements of IBC Chapter 6, except as modified by this UFC. 6-2 SEPARATION BETWEEN BUILDINGS. Conform to the requirements of the IBC, except as modified by this UFC. CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 90 This Page Intentionally Left Blank CANCELLED UFC 3-600-01 8 August 2016 Change 6, 6 May 2021 91 FIRE AND SMOKE PROTECTION FEATURES 7-1 GENERAL. Conform to the requirements of NFPA 101 except as noted below. Where IBC Chapter 5 or 6 specifically

DAFMAN 91-203 · para 24.14.2.1 as of 2026-06-25 · View in PDF → · official source ↗

ticle 513, Standard on Aircraft Hangars, NFPA 409, Standard on Aircraft Hangars, NFPA 410, UFC 3-600-01, and associated engineering technical letters (ETLs) for detailed design guidance. Note 1: ETLs supplement UFC 3-600-01 and compliance with ETLs is required per AFI 32-1023, Designing and Constructing Military Construction Projects. Note 2: ETLs take precedence in conflicts with national fire codes, building codes or UFC 3-600-01. 24.14.2.1. Fixed electrical equipment approved for Class I, Division 1 locations may be used in Class I, Division 2 locations of the same class and compatibility group. Equipment not meeting these guidelines will be de-energized or disabled and locked out until special operations are complete and hazardous conditions permanently eliminated. (T-1) Refer to parag

DoDM 4140.70 as of 2017-10-12 · official source ↗

23-210/MCO 4450.14/DLAM 4145.12, “Joint Service Manual for Storage and Materials Handling,” April 12, 1994 Unified Facilities Criteria (UFC) 3-600-01, “Fire Protection Engineering for Facilities,” November 28, 2016 Unified Facilities Criteria (UFC) 3-600-02, “Operations and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems,” September 8, 2010

DAFI 32-2001 · para 7.2.4.1.3 as of 2026-04-01 · View in PDF → · official source ↗

clude missing fire protection systems or missing NFPA 101 features in any building or process. Any facility FSD which is non-compliant with the following is considered an FSD I: 7.2.4.1.1. New Facilities. New facilities must meet the requirements specified in UFC 3-600-01. (T-0) Such facilities must not be considered as complete and usable until the deficiency is corrected. (T-2) 7.2.4.1.2. For Modernized, Renovated, Repaired, Restored, Upgraded and Change-of- Occupancy Facilities, these facilities must meet the requirements of UFC 3-600-01. (T-0) 7.2.4.1.3. Existing Facilities. Existing facilities must meet the minimum requirements of NFPA 101 for existing occupancies in accordance with UFC 3-600-01. (T-0) 7.2.4.1.4. Impairments. Identified fire safety feature impairments for existing occ

DAFI 32-1020 · para 2.2 as of 2026-02-10 · View in PDF → · official source ↗

award phase, up to and including project award. See Table 2.1 for UFC 3-600-01 programming compliance metrics. (T-1) Note: The entire facility must, at all times, meet NFPA 101 minimum requirements. (T-0) Table 2.2. UFC 3-600-01, Fire Protection Engineering for Facilities, Compliance Metrics. UFC Term UFC Definition Abridged UFC rule Repair Patching, restoring, painting to maintain sound condition Work area must comply to UFC Renovation Replacement, strengthening, or upgrading not resulting in reconfiguration of space Work area must comply to UFC Modification Reconfigurations Work area must comply; If 50% area, entire facility must comply Reconstruction Reconfiguration affecting exit or shared corridor Entire building must comply Addition An increase in area Addition must comply Change in

CFETP 3E0X1 · para 11.1 as of 2025-09-05 · open official PDF ↗

underground Systems over/under 600 volts 10.7. Troubleshoot 10.7.1. Underground cables 2b(I) 10.7.2. Pad mount transformer 1a(I) 10.8. Isolate system faults 2b(I) 10.9. Fabricate 200 Amp load 5^ 2b(I) break elbow (TQT) 10.10. Fabricate 600 Amp Dead a(I) 3c Break 10.11. Install 600 Amp Dead Break a(I) 3c 10.12. Design distribution systems 3c 11.0. DISTRIBUTION SYSTEMS 600 VOLTS AND LESS TR: AFM 32-1062; AFM 32-1065, AFM 91- 203; NFPA 70, NFPA 70E; UFC 3-520-01, UFC 3-530-01, UFC 3- 570-06: Note: QTP required for UGT 11.1. Fundamentals B 52CFETP 3E0X1, 31 Jan 2022 Attachment 2 3E0X1 Specialty Training Standard (STS) 1. Tasks, Knowledge and 4. Proficiency Codes Used To Technical References 2. Tasks 3. Certification For OJT Indicate Training/Information Provided via DL and/or Course A B A B C

NFPA standards (cited by reference)
NFPA 70 National Electrical Code — cited by DAFMAN 91-203 (sections 5, 8) · read at NFPA free access ↗
NFPA 30 Flammable and Combustible Liquids Code — cited by DAFMAN 91-203 · read at NFPA free access ↗
NFPA 70E Electrical Safety in the Workplace — cited by DAFMAN 91-203 (sections 2.3, 8.17) · read at NFPA free access ↗
NFPA 101 Life Safety Code — cited by DAFI 32-2001 (sections 9.6, 6, 7.2.1.2.3.2, 7.2.1.2.4) · read at NFPA free access ↗

NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.