Ask a compliance question

Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.

Governing guidance

Showing the controlling passages directly. (daily question limit reached — showing passages)

UFC 3-540-08 as of 2017-01-23 · official source ↗

UFC 3-540-08 23 January 2017 UNIFIED FACILITIES CRITERIA (UFC) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED UTILITY-SCALE RENEWABLE ENERGY SYSTEMS UFC 3-540-08 23 January 2017 UNIFIED FACILITIES CRITERIA (UFC) UFC 3-540-08 UTILITY-SCALE RENEWABLE ENERGY SYSTEMS Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND AIR FORCE CIVIL ENGINEER CENTER (Preparing Activity) Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location UFC 3-540-08 23 January 2017 FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, con

UFC 3-540-08 as of 2017-01-23 · official source ↗

of Defense (Facilities Investment and Management) Office of the Assistant Secretary of Defense (Energy, Installations, and Environment) UFC 3-540-08 23 January 2017 UNIFIED FACILITIES CRITERIA (UFC) NEW SUMMARY SHEET Document: UFC 3-540-08, Utility-Scale Renewable Energy Systems Superseding: None Description: This UFC provides requirements for the planning, design, construction, and operations and maintenance of solar photovoltaic, horizontal axis wind turbine, waste to energy, landfill gas, and geothermal renewable energy power generation systems. Reasons for Document: • To provide unified Department of Defense renewable energy power generation criteria and create more consistency in DoD designs. Impact: This uniform effort will result in the more effective use of DoD funds in the followi

UFC 3-540-08 as of 2017-01-23 · official source ↗

ts of God, and incidental or consequential damages. UFC 3-540-08 23 January 2017 94 This Page Intentionally Left Blank UFC 3-540-08 23 January 2017 95 CHAPTER 7 DESIGN CRITERIA - GEOTHERMAL SYSTEMS 7-1 INTRODUCTION. This chapter identifies typical applications and defines the data development requirements to establish design criteria for a geothermal power generation plant. Ground source heat pump technology is not consider utility level power generation technology and is not discussed in this UFC. Viable geothermal power production requires a geothermal resource with three attributes: • Fluid – Water naturally existing in the geothermal reservoir is used to extract heat in quantities necessary to meet power production requirements; • Heat – Earth’s natural temperature which increases with

DoDI 4170.11 as of 2009-12-11 · official source ↗

nt Program Guidance,” March 17, 1993 (s) Unified Facilities Criteria (UFC 3-500), Electrical Series 3 Available at http://www.wbdg.org/ccb/browse_cat.php?c=4 (t) DoD Directive 3020.40, “DoD Policy and Responsibilities for Critical Infrastructure,” January 14, 2010 (u) Unified Facilities Criteria (UFC 3-540-01), Engine-Driven Generator Systems for Backup Power Applications 4 Available at http://www.wbdg.org/ccb/browse_doc.php?d=9689 (v) DoD Instruction 6055.17, “DoD Installation Emergency Management (IEM) Program,” DoDI 4170.11, December 11, 2009 Change 2, 08/31/2018 ENCLOSURE 1 5 January 13, 20095 5 Available at http://dtic.mil/whs/directives/corres/pdf/605517p.pdf (w) Deputy Assistant Secretary of Defense for Logistics Memorandum, “Department of Defense Energy Security Policy,” January 14

UFC 3-501-01 as of 2024-11-27 · official source ↗

Interior and Exterior Lighting Systems UFC 3-535-01, Visual Air Navigation Facilities UFC 3-540-01, Engine-Driven Generator Systems for Prime and Standby Power Applications UFC 3-540-08, Utility-Scale Renewable Energy Systems UFC 3-550-01, Exterior Electrical Power Distribution UFC 3-550-04: Installation Microgrid Design CANCELLED UFC 3-501-01 27 November 2024 82 UFC 3-555-01, Aircraft Point-of-Use Power Systems UFC 3-560-01, Operation and Maintenance: Electrical Safety UFC 3-570-01, Cathodic Protection UFC 3-575-01, Lightning and Static Electricity Protection Systems UFC 3-580-01, Telecommunications Interior Infrastructure Planning and Design UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings UFC 4-010-05, SCIF/SAPF Pl

UFC 3-550-04 as of 2024-03-01 · official source ↗

fied-facilities-criteria-ufc UFC 1-200-01, DoD Building Code UFC 3-410-02, Direct Digital Control for HVAC and Other Building Control Systems UFC 3-440-01, Facility-Scale Renewable Energy Systems UFC 3-470-01, Utility Monitoring and Control System (UMCS) Front End and Integration UFC 3-501-01, Electrical Engineering UFC 3-540-01, Engine-Driven Generator Systems for Prime and Standby Power Applications UFC 3-540-08, Utility-Scale Renewable Energy Systems UFC 3-550-01, Exterior Electrical Power Distribution UFC 3-600-01, Fire Protection Engineering for Facilities UFC 3-701-01, DoD Facility Pricing Guide UFC 3-730-01, Programming Cost Estimates for Military Construction UFC 3-740-05, Construction Cost Estimating UFC 4-010-06, Cybersecurity of Facility-Related Control Systems DoDD 3020.26, Dep

UFC 1-200-02 as of 2020-12-01 · official source ↗

lopment UFC 3-410-01, Heating, Ventilation, and Air Conditioning Systems UFC 3-440-01, Renewable Energy Systems – Facility UFC 3-530-01, Interior and Exterior Lighting Systems and Controls UFC 3-540-08, Utility-Scale Renewable Energy Systems \3\ /3/ CANCELLED UFC 1-200-02 01 DECEMBER 2020 Change 03, 08 JULY 2025 60 UFC 4-010-06, Cybersecurity of Facility-Related Control Systems UFC 4-510-01, Design: Military Medical Facilities UNITED STATES DEPARTMENT OF ENERGY Federal Energy Management Program (FEMP) https://energy.gov/eere/femp/federal-energy-management-program \3\ UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Comprehensive Procurement Guideline (CPG) Program https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program Energy Independence and Security Act (EISA), 19 December 2

UFC 3-440-01 as of 2015-07-01 · official source ↗

LITIES CRITERIA PROGRAM http://dod.wbdg.org/ UNIFIED FACILITIES CRITERIA (UFC) UFC 1-200-01, General Building Requirements UFC 1-200-02, High Performance and Sustainable Building Requirements UFC 3-110-03, Roofing UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-301-01, Structural Engineering UFC 3-440-01 01 July 2015 35 UFC 3-401-01, Mechanical Engineering UFC 3-420-01, Plumbing Systems UFC 3-501-01, Electrical Engineering UFC 3-520-01, Interior Electrical Systems UFC 3-540-08, Utility-Scale Renewable Energy Systems (Draft) UFC 3-560-01, Electrical Safety, O&M UFC 3-575-01, Lightning and Static Electricity Protection Systems UFC 3-600-01, Fire Protection Engineering for Facilities UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS) UFGS 23 07 00, Thermal Insulation for Mechanical

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.