Ask a compliance question

Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.

I can see that UFC 3-540-02N is referenced in the passages provided, but they contain only the cover page, foreword, references section, and appendix header information from that document. The passages show that UFC 3-540-02N (current as of 2004-01-16) is a Unified Facilities Criteria document on Steam Power Plants [UFC 3-540-02N], marked as INACTIVE, and prepared by the U.S. Army Corps of Engineers and Naval Facilities Engineering Command.

However, the actual technical content and substantive criteria from UFC 3-540-02N are not included in these indexed passages.

To answer a specific question about UFC 3-540-02N requirements, I would need passages containing the actual design criteria, standards, or operational requirements from that document.

What specific requirement or topic from UFC 3-540-02N are you asking about?

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.
Show the 8 source passage(s) this answer is built from

UFC 3-540-02N 16 January 2004 UNIFIED FACILITIES CRITERIA (UFC) STEAM POWER PLANTS APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED INACTIVE UFC 3-540-02N 16 January 2004 UNIFIED FACILITIES CRITERIA (UFC) STEAM POWER PLANTS Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEERING SUPPORT AGENCY Record of Changes (changes indicated by \1\ ... /1/ ) Change No. Date Location INACTIVE UFC 3-540-02N 16 January 2004 FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment,

and UFC 4-010-01, the requirements of UFC 4-010-01 take precedence. INACTIVE UFC 3-540-02N 16 January 2004 1-1 1-3 REFERENCES. The following Tri-Service publications have valuable information on the subject of this UFC. When the full text UFC is developed for this subject, applicable portions of these documents will be incorporated into the text. The designer is encouraged to access and review these documents as well as the references cited in Appendix A and B. 1. US Army Corps of Engineers Commander USACE TM 5-650, Central Boiler Plants USACE Publication Depot 13 October 1989 ATTN: CEIM-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 (301) 394-0081 fax: 0084 karl.abt@hq02.usace.army.mil http://www.usace.army.mil/inet/usace-docs/ INACTIVE UFC 3-540-02N 16 January 2004 A-1 APPENDIX A MIL-

.mil/inet/usace-docs/ INACTIVE UFC 3-540-02N 16 January 2004 A-1 APPENDIX A MIL-HDBK 1003/7 STEAM POWER PLANTS INACTIVE MILITARY HANDBOOK STEAM POWER PLANTS - FOSSIL FUELED AMSC N/A AREA FACR DISTRIBUTION STATEMENT A APPROVED FOR PUBLIC RELEASE: DISTRIBUTION IS UNLIMITED 1 INCH-POUND 1 MIL-HDBK-1003/7 15 SEPTEMBER 1990 INACTIVE MIL-HDBK-1003/7 ii ABSTRACT Basic design guidance is presented for fossil-fueled, steam-powered plants generating electricity or cogenerating electricity and steam. Criteria and design requirements are given for sizing plants, load shedding, use of cogeneration, environmental regulations and permitting, electric and steam generators, steam condensers and cooling water systems, auxiliary equipment, coal and ash handling, water supply, makeup and treatment, controls a

FC 3-401-02N as of 2024-09-01 · official source ↗

accordance with ASTM D8231 and ASTM C1153. 5-2.5.8.3 Electrical Systems Investigation and Testing. Conduct further investigation and testing of electrical systems in accordance with the following (Note: It is important to note that the local Authority Having Jurisdiction may have more stringent requirements for operational requirements; these must be confirmed.): • Emergency and Stand-by Power Systems: − Perform inspections and operational testing in accordance with UFC 3- 540-07, NFPA 110 section titled “Operational Inspection and Testing”, and the manufacturer’s instructions. FC 3-401-02N 01 September 2024 40 • Lighting Control Systems: − Test lighting controls in accordance with IECC (C405 & C408.3 – Lighting system functional Testing), NEMA 410 – (Performance testing for lighting contr

UFC 3-130-04 as of 2025-01-16 · official source ↗

es UFC 3-230-01, Water Storage, Distribution, and Treatment UFC 3-301-01, Structural Engineering UFC 3-301-02, Design of Risk Category V Structures, National Strategic Military Assets UFC 3-400-02, Design: Engineering Weather Data UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 3-501-01, Electrical Engineering UFC 3-520-01, Interior Electrical Systems UFC 3-530-01, Interior and Exterior Lighting Systems UFC 3-540-01, Engine-Driven Generator Systems for Prime and Standby Power Applications UFC 3-550-01, Exterior Electrical Power Distribution UFC 3-570-01, Cathodic Protection UFC 3-575-01, Lightning and Static Electricity Protection Systems UFC 3-580-01, Telecommunications Interior Infrastructure Plannin

UFC 1-200-01 as of 2022-09-01 · official source ↗

stribution Pipelines UFC 3-460-01, Design: Petroleum Fuel Facilities UFC 3-490-06, Elevators UFC 3-501-01, Electrical Engineering UFC 3-520-01, Interior Electrical Systems UFC 3-530-01, Interior and Exterior Lighting Systems and Controls UFC 3-540-01, Engine-Driven Generator Systems for Prime and Standby Power Applications UFC 3-550-01, Exterior Electrical Power Distribution UFC 3-560-01, Operation and Maintenance: Electrical Safety UFC 3-570-01, Cathodic Protection UFC 3-580-01, Telecommunications Interior Infrastructure Planning and Design UFC 3-600-01, Fire Protection Engineering for Facilities UFC 3-701-01, DoD Facilities Pricing Guide UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings \3\ UFC 4-010-05, SCIF/SAPF Planning, Design, and Construction /3/ UFC 4-010-06, Cyberse

UFC 4-510-01 as of 2023-02-03 · official source ↗

eld and Heliport Planning and Design UFC 3-301-01, Structural Engineering UFC 3-400-02, Design: Engineering Weather Data UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 3-450-01, Noise and Vibration Control UFC 3-490-06, Elevators UFC 3-501-01, Electrical Engineering UFC 3-520-01, Interior Electrical Systems UFC 3-520-05, Stationary and Mission Batteries UFC 3-530-01, Interior and Exterior Lighting Systems and Controls UFC 3-535-01, Visual Air Navigation Facilities UFC 3-535-02, Design Drawings for Visual Air Navigation Facilities UFC 3-540-01, Engine Driven Generator Systems for Backup Power Applications UFC 3-575-01, Lightning and Static Electricity Protection Systems UFC 3-580-01, Telecommunications Interior Infrastructure Planning and

UFC 3-440-01 as of 2015-07-01 · official source ↗

LITIES CRITERIA PROGRAM http://dod.wbdg.org/ UNIFIED FACILITIES CRITERIA (UFC) UFC 1-200-01, General Building Requirements UFC 1-200-02, High Performance and Sustainable Building Requirements UFC 3-110-03, Roofing UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-301-01, Structural Engineering UFC 3-440-01 01 July 2015 35 UFC 3-401-01, Mechanical Engineering UFC 3-420-01, Plumbing Systems UFC 3-501-01, Electrical Engineering UFC 3-520-01, Interior Electrical Systems UFC 3-540-08, Utility-Scale Renewable Energy Systems (Draft) UFC 3-560-01, Electrical Safety, O&M UFC 3-575-01, Lightning and Static Electricity Protection Systems UFC 3-600-01, Fire Protection Engineering for Facilities UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS) UFGS 23 07 00, Thermal Insulation for Mechanical

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.