Directorate of Civil Works Naval Facilities Engineering Command U.S. Army Corps of Engineers EDWIN H. OSHIBA, SES, DAF MICHAEL McANDREW Director, Air Force Civil Engineer Center (AFCEC) Air Force Installation and Mission Support Center Deputy Assistant Secretary of Defense (Construction) and Acting Deputy Assistant Secretary of Defense (Housing) Office of the Assistant Secretary of Defense (Sustainment) CANCELLED UFC 3-490-06 8 June 2018 Change 1, 13 January 2021 UNIFIED FACILITIES CRITERIA (UFC) SUMMARY SHEET Document: UFC 3-490-06: Elevators Superseding: NAVFAC ITG 2013-01, NAVFAC Elevator Design Criteria Description: This UFC 3-490-06 incorporates tri-service requirements into one unified document and provides design and construction requirements for elevators in DOD facilities. Reasons
t permitted in DOD facilities except in the event of compelling design conditions. CANCELLED UFC 3-490-06 8 June 2018 Change 1, 13 January 2021 39 Figure B-2 In-ground Direct Plunger Hydraulic Elevator Elevator Machine Room is located Directly Adjacent to the Elevator Hoistway CANCELLED UFC 3-490-06 8 June 2018 Change 1, 13 January 2021 40 Figure B-3 Hole-less, Dual Post, Direct Plunger Hydraulic Elevator Elevator Machine Room is located Directly Adjacent to the Elevator Hoistway. CANCELLED UFC 3-490-06 8 June 2018 Change 1, 13 January 2021 41 APPENDIX C GLOSSARY C-1 ACRONYMS AFCEC Air Force Civil Engineer Center ATCT Air Traffic Control Tower ATS Automatic Transfer Switch BIA Bilateral Infrastructure Agreement DOD Department of Defense EMS Emergency Medical Services FEO Firefighters’ Emer
2 mm) D. The locking mechanism must utilize the ASME A17.1 FEO key. 3-5.2 Exterior Elevator Lobby Enclosure. For exterior elevator landing entrances, provide elevator lobby enclosure or vestibule to protect elevator entrance, elevator hoistway, and elevator equipment from snow, ice, and wind driven rain. CANCELLED UFC 3-490-06 8 June 2018 Change 1, 13 January 2021 15 3-6 \1\ CORROSION PROTECTION. /1/ \1\ All ferrous metal elevator equipment and building components in the elevator hoistway, machine room, and machinery spaces must be painted with a minimum of one coat of enamel paint. /1/ CANCELLED UFC 3-490-06 8 June 2018 Change 1, 13 January 2021 16 This Page Intentionally Left Blank CANCELLED UFC 3-490-06 8 June 2018 Change 1, 13 January 2021 17 CHAPTER 4 STRUCTURAL 4-1 ELEVATOR MACHINE R
ty Planning Criteria for Navy/Marine Corps Shore Installations UFC 2-100-01, Installation Master Planning UFC 3-201-01, Civil Engineering UFC 3-201-02, Landscape Architecture UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 3-490-06, Elevators UFC 3-580-01, Telecommunications Interior Infrastructure Planning and Design UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings UFC 4-010-06, Cybersecurity of Facility-Related Control Systems UFC 4-020-01, DoD Security Engineering Facilities Planning Manual
stribution Pipelines UFC 3-460-01, Design: Petroleum Fuel Facilities UFC 3-490-06, Elevators UFC 3-501-01, Electrical Engineering UFC 3-520-01, Interior Electrical Systems UFC 3-530-01, Interior and Exterior Lighting Systems and Controls UFC 3-540-01, Engine-Driven Generator Systems for Prime and Standby Power Applications UFC 3-550-01, Exterior Electrical Power Distribution UFC 3-560-01, Operation and Maintenance: Electrical Safety UFC 3-570-01, Cathodic Protection UFC 3-580-01, Telecommunications Interior Infrastructure Planning and Design UFC 3-600-01, Fire Protection Engineering for Facilities UFC 3-701-01, DoD Facilities Pricing Guide UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings \3\ UFC 4-010-05, SCIF/SAPF Planning, Design, and Construction /3/ UFC 4-010-06, Cyberse
.wbdg.org/ffc/dod/unified-facilities-criteria-ufc UFC 1-200-01, DoD Building Code UFC 1-200-02, High Performance and Sustainable Building Requirements UFC 3-101-01, Architecture UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-490-06, Elevators UFC 3-535-01, Visual Air Navigation Facilities UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-06, Cybersecurity of Facility-Related Control Systems UFC 4-020-01, DoD Security Engineering Facilities Planning Manual UFC 4-021-02, Electronic Security Systems UFC 4-022-01, Security Engineering: Entry Control Facilities/Access Control Points UFC 4-025-01, Security Engineering: Waterfront Security UFC 4-152-01, Design: Piers and Wharves UFC 4-510-01, Design: Military Medical Facilities UFC 4-740-02, Fitness Centers UFC 4-7
open to prevent a tripping hazard. (T-0) Report elevator malfunctions immediately to the unit facility manager. Employees will not try to stop elevators by placing a hand or foot in closing doors. (T-0) Employees will not use elevators during emergency evacuation. (T-0) 2.5.6.3. Where an elevator or escalator is operating unsafely or has visible damage, do not use it until inspected by a certified inspector. (T-1) UFC 3-490-06, Elevators, ASME A17.1, Safety Code for Elevators and Escalators, and ASME A17.2, Guide for Inspection of Elevators, Escalators and Moving Walk, provides additional information. 2.5.7. Facility floors, especially raised floors, will be kept smooth, clean and free of obstructions and slippery materials. (T-0) 2.5.8. Raised floor spaces will be divided in the same mann
eld and Heliport Planning and Design UFC 3-301-01, Structural Engineering UFC 3-400-02, Design: Engineering Weather Data UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 3-450-01, Noise and Vibration Control UFC 3-490-06, Elevators UFC 3-501-01, Electrical Engineering UFC 3-520-01, Interior Electrical Systems UFC 3-520-05, Stationary and Mission Batteries UFC 3-530-01, Interior and Exterior Lighting Systems and Controls UFC 3-535-01, Visual Air Navigation Facilities UFC 3-535-02, Design Drawings for Visual Air Navigation Facilities UFC 3-540-01, Engine Driven Generator Systems for Backup Power Applications UFC 3-575-01, Lightning and Static Electricity Protection Systems UFC 3-580-01, Telecommunications Interior Infrastructure Planning and
NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.