Ask a compliance question

Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.

Not found in the indexed publications — check the official source.

The passages provided are table-of-contents excerpts, maintenance requirement tables, and regulatory cross-references from UFC 3-460-01 and related Air Force manuals. They do not contain substantive technical or design requirements from UFC 3-460-01 itself. To answer a specific question about UFC 3-460-01, you would need to consult the full text of that publication.

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.
NFPA standards (cited by reference)
NFPA 780 Installation of Lightning Protection Systems — cited by AFMAN 32-1065 (sections 8.1.1, 8) · read at NFPA free access ↗
NFPA 70E Electrical Safety in the Workplace — cited by AFMAN 32-1065 (sections 2.3, 8.17) · read at NFPA free access ↗
NFPA 70 National Electrical Code — cited by AFMAN 32-1065 (sections 5, 8) · read at NFPA free access ↗
NFPA 58 — cited by DAFMAN 32-1067 · read at NFPA free access ↗

NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.

Show the 8 source passage(s) this answer is built from
UFC 3-460-01 as of 2019-07-16 · official source ↗

lling Station Plan UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 264 Plate 012 – Tactical Refueler Ground Product Truck Loading Facility Plan UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 265 Plate 013 – Tactical Refueler Ground Product Truck Loading Systems UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 266 Plate 014 – Piping Systems Barred Tee UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 267 Plate 015 – Piping Systems Sliding Pipe Support – Guided UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 268 Plate 016 – Piping Systems Anchor Pipe Support UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 269 Plate 017 – Piping Systems U-Bolt Pipe Supports UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 270 Plate 018 – Piping Systems U-Bolt Small Pipe Support UFC 3-460-01 16 July 2019 C

UFC 3-460-01 as of 2019-07-16 · official source ↗

-01 16 July 2019 Change 3, 08 June 2023 258 Plate 006 – Refueler Truck Facilities Layout Plan UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 259 Plate 007 – Refueler Truck Loading Systems UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 260 Plate 008 - Aircraft Direct Fueling Systems Large Frame Aircraft On-Apron Fueling Positions UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 261 Plate 009 – Aircraft Direct Fueling Systems Small Frame Aircraft Fueling Lane and Apron Edge UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 262 Plate 010 - Aircraft Direct Fueling Systems Small Frame Aircraft In- Shelter Fueling Positions UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 263 Plate 011 – GOV Vehicle Motive Fuel Filling Station Plan UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 264 Plate 01

UFC 3-460-01 as of 2019-07-16 · official source ↗

d Petroleum Gas Facilities Tank Spacing Requirements Plate 027 – Liquefied Petroleum Gas Facilities Tank Spacing Requirements UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 253 Plate 001 – UFC Chapter Identification Plan UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 254 Plate 002 – Tank Truck and Tank Car Receiving and Dispensing Facilities UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 255 Plate 003 – Tank Truck and Tank Car Off-Loading Drop Tank System UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 256 004 – Tank Truck and Tank Car Packaged Off-Loading System UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 257 Plate 005 – Tank Truck and Tank Car Loading System and Direct Off-Loading System UFC 3-460-01 16 July 2019 Change 3, 08 June 2023 258 Plate 006 – Refueler Truck Facilitie

point facility ground T-0 c. Visual inspection of lightning protection system and Surge protective devices 1-2 years, as determined by the base AHJ, based on facility type. BCE This AFMAN NFPA 780 UFC 3-575-01 UFC 3-520-01 Note mechanical damage, lightning damage, or discrepancies caused by repair, renovation, or addition T-3 d. Facility ground resistance check (per NEC Article 250, 25 ohms or less at service grounding electrode) 5 years BCE This AFMAN T-3 5. POL facilities a. Resistance measuremen t on static grounds (10,000 ohms or less) Upon installation and when observed to be physically damaged BCE UFC 3-460- 03, O&M: Maintenance of Petroleum Systems T-1 b. Visual inspection and mechanical check of ground conductor connections (pull test) Quarterly and when damaged User UFC 3-460-03 A

DAFMAN 32-1067 · para 9.12.2.2 as of 2025-08-01 · View in PDF → · official source ↗

ts will be uploaded to STAR for archiving tank system record in addition to the normal business practices. (T-0) 9.12.2. Installations ensure that aboveground Storage Tanks 9.12.2.1. Meet federal, state, and local regulatory requirements for temporary deactivation and permanent closure. Overseas ASTs inactivated for 12 months or longer must be disconnected to prevent loading or unloading of petroleum products. See UFC 3-460-01, Chapter 13, for temporary deactivation. (T-0) 9.12.2.2. Follow UFC 3-460-01, Chapter 14, for permanent removal and deactivation of ASTs. Once removed and properly disposing of the tank system (including piping), tank status in STAR must be updated to reflect this action. Retain records in STAR. (T-0) TOM D. MILLER, Lieutenant General, USAF DCS/Logistics, Engineering

tanks and associated piping, transfer terminals, hydrant systems and pipelines), operated and maintained in accordance with environmental regulatory requirements, perform an essential function in support of the DAF mission. Where petroleum and hazardous substances are necessary for use by the DAF mission, these may be stored in underground or aboveground storage tanks. Additional standards and directive guidance can be found in DAFI 23-201, Fuels Management; Unified Facilities Criteria (UFC) 3-460-01, Design: Petroleum Fuel Facilities; UFC 3-460-03, Petroleum Fuel Systems Maintenance; National Fire Protection Association; Petroleum Equipment Institute; Steel Tank Institute; American Petroleum Institute; National Electric Code; and the Occupational Safety and Health Administration (OSHA).

AFRCH 32-1001 · para 6.39.3 as of 2023-10-19 · open official PDF ↗

01, Design: Petroleum Fuel Facilities 6.39.1. Hydrant Refueling System (FAC 1211; CATCODE 121-122): Where hydrant systems are justified, provide a fueling position for the total number of primary assigned aircraft (PAA) minus two. Reference: AFMAN 32-1084 and UFC 3-460-01. 6.39.2. Vehicle Fueling System (FAC 1231; CATCODE 123-335): Provide two dual outlet dispensing pedestals for ground fuels for each increment of 150 motor vehicles to be served. Provide at least one pedestal for each fuel type. Provide storage in above ground tanks. Reference: AFMAN 32-1084 and UFC 3-460-01. 6.39.3. Jet Fuel Operating Storage (FAC 1241; CATCODE 124-135): Reference: AFMAN 32-1084 and UFC 3-460-01. Additional storage may be justified based on PAA, tenant support, and contingency requirements for the install

UFC 4-141-03 as of 2024-12-09 · official source ↗

-020-01 & 3-460-01 IAW UFC 4-020-01 & 3-460-01 and a 30 feet (9.1 m) minimum IAW UFC 4-020- 01 & 3-460-01 and a 30 feet (9.1 m) minimum Security System CPU UPS capacity IAW MESEP & UFC 4-021-02 IAW MESEP & UFC 4-021-02 IAW MESEP & UFC 4-021-02 Data Gathering Panels (Field Panels) UPS Capacity IAW MESEP & UFC 4-021-02 IAW MESEP & UFC 4-021-02 IAW MESEP & UFC 4-021-02 Field Device UPS Capacity IAW MESEP & UFC 4-021-02 IAW MESEP & UFC 4-021-02 IAW MESEP & UFC 4-021-02 Physical security staffing per shift IAW UFC 4-020-01 & 4-010-05 IAW UFC 4-020-01 & 4-010-05 IAW UFC 4-020- 01 & 4-010-05 UFC 4-141-03 09 December 2024 16 Grade 2 Grade 3 Grade 4 Security Access Control/Monitoring Generators Requirement determined by study IAW UFC 4-020-01 Requirement determined by study IAW UFC 4-020-01 Require

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.