Ask a compliance question

Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.

Governing guidance

Showing the controlling passages directly. (daily question limit reached — showing passages)

ermission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS (Preparing Activity) NAVAL FACILITIES ENGINEERING COMMAND Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location 2 April 8, 1009 Change UFC number from 3-340-06AN This UFC supersedes TM 5-858-5, dated 15 December 1983. The format of this UFC does not conform to UFC 1-300-01; however, the format will be adjusted to conform at the next revision. The body of this UFC is a document of a different number. INACTIVE UFC 3-350-06AN 01 March 2005 2 FOREWORD \1\ The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Fie

_______________________ Dr. GET W. MOY, P.E. Director, Installations Requirements and Management Office of the Deputy Under Secretary of Defense (Installations and Environment) INACTIVE UFC 3-350-06AN 1 March 2005 Change 2 April 8, 2009 UNIFIED FACILITIES CRITERIA (UFC) DESIGNING FACILITIES TO RESIST NUCLEAR WEAPONS EFFECTS: AIR ENTRAINMENT, FASTENERS, PENETRATION PROTECTION, HYDRAULIC-SURGE PROTECTIVE DEVICES AND EMP PROTECTIVE DEVICES The text of this UFC is the previous TM 5-858-5, dated 15 December 1983. The document is available only in hard copy form and only from: National Technical Information Service (NTIS) 5285 Port Royal Road, Springfield, VA 22161 Telephone 1-800-584-8332 NTIS _____________ INACTIVE

AFSOCI 32-1084 · para 7.4.37 as of 2023-02-21 · open official PDF ↗

tant drains. Applicable criteria include UFC 3-401-01 for mechanical & UFC 3-410-01 for HVAC. Electrical Industrial equipment typically requires 240- and 480-volt, three-phase electrical current. Use commercial grade convenience receptacles and special power outlets. Consult X-ray and other NDI equipment specifications for their specific power requirements. Applicable criteria include UFC 3-501-01 for general electrical requirements, UFC 3-520-01 for interior electrical systems requirements, UFC 3-530-01 for interior and exterior lighting and controls requirements, UFC 3-550-01 for exterior power distribution systems requirements, UFC 3-560-01 for electrical safety and electrical O&M requirements, UFC 3-580-01 for building telecommunications requirements, and UFC 4-021-01 for mass notifica

UFC 4-141-10 as of 2022-09-22 · official source ↗

UFC 1-200-01 General Building Requirements UFC 2-000-05N Facility Planning Criteria for Navy/Marine Corps Shore Installations UFC 3-101-01 Architecture UFC 3-110-03 Roofing UFC 3-201-01 Civil Engineering UFC 3-220-01 Geotechnical Engineering UFC 3-250-01 Pavement Design for Roads and Parking Areas UFC 3-260-01 Airfield and Heliport Planning and Design UFC 3-260-04 Airfield and Heliport Marking UFC 3-301-01 Structural Engineering UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings UFC 4-141-10 22 September 2022 6 UFC 4-022-03 Security Fences and Gates UFC 3-401-01 Mechanical Engineering UFC 3-410-01 Heating, Ventilating and Air Conditioning Systems UFC 3-420-01 Plumbing Systems UFC 3-450-01 Noise and Vibration Control UFC 3-460-01 Design: Petroleum Fuel Facilities UFC 3-501-01 El

UFC 4-711-01 as of 2018-08-10 · official source ↗

/dod/ufc /3/ UFC 1-200-01, DoD Building Code UFC 1-200-02, High Performance and Sustainable Building Requirements (applicable to multi-family housing) UFC 2-100-01, Installation Master Planning UFC 3-101-01, Architecture UFC 3-110-03, Roofing UFC 3-120-10, Interior Design UFC 3-210-10, Low Impact Development UFC 3-301-01, Structural Engineering \3\ /3/ UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 3-450-01, Noise and Vibration Control UFC 3-530-01, Interior and Exterior Lighting Systems and Controls UFC 3-550-01, Exterior Electrical Power Distribution UFC 3-570-01, Cathodic Protection UFC 3-600-01, Fire Protection Engineering For Facilities UFC 3-810-01N, Navy and Marine Corps Environmental Engineering for Facility Construction UFC 4-01

UFC 3-530-01 as of 2023-02-09 · official source ↗

.wbdg.org/ffc/dod/unified-facilities-criteria-ufc UFC 1-200-01, DoD Building Code UFC 1-200-02, High Performance and Sustainable Building Requirements UFC 3-101-01, Architecture UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-490-06, Elevators UFC 3-535-01, Visual Air Navigation Facilities UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-010-06, Cybersecurity of Facility-Related Control Systems UFC 4-020-01, DoD Security Engineering Facilities Planning Manual UFC 4-021-02, Electronic Security Systems UFC 4-022-01, Security Engineering: Entry Control Facilities/Access Control Points UFC 4-025-01, Security Engineering: Waterfront Security UFC 4-152-01, Design: Piers and Wharves UFC 4-510-01, Design: Military Medical Facilities UFC 4-740-02, Fitness Centers UFC 4-7

UFC 1-200-01 as of 2022-09-01 · official source ↗

nterior Design UFC 3-190-06, Protective Coatings and Paints UFC 3-201-01, Civil Engineering UFC 3-201-02, Landscape Architecture UFC 3-210-10, Low Impact Development UFC 3-220-01, Geotechnical Engineering UFC 3-230-01, Water Storage and Distribution UFC 3-230-03, Water Treatment UFC 3-240-01, Wastewater Collection and Treatment UFC 3-301-01, Structural Engineering UFC 3-301-02, Design of Risk Category V Structures, National Strategic Military Assets UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems CANCELLED UFC 1-200-01 01 September 2022 Change 4, 17 December 2024 71 UFC 3-420-01, Plumbing Systems UFC 3-430-05, Natural Gas and Liquefied Petroleum Gas (LPG) Distribution Pipelines UFC 3-460-01, Design: Petroleum Fuel Facilities UFC 3-490-0

UFC 3-130-03 as of 2025-01-16 · official source ↗

ww.iccsafe.org IBC, International Building Code UNIFIED FACILITIES CRITERIA https://www.wbdg.org/dod/ufc UFC 1-200-01, DoD Building Code UFC 2-100-01, Installation Master Planning UFC 3-130-01, Arctic and Subarctic Engineering UFC 3-130-02, Arctic and Subarctic Site Selection and Development UFC 3-130-04, Arctic and Subarctic Buildings UFC 3-130-05, Arctic and Subarctic Utilities UFC 3-201-01, Civil Engineering UFC 3-220-01, Geotechnical Engineering UFC 3-220-04FA, Backfill for Subsurface Structures UFC 3-220-05, Dewatering and Groundwater Control UFC 3-220-08FA, Engineering Use of Geotextiles UFC 3-220-10, Soil Mechanics (DM 7.1) UFC 3-220-20, Foundations and Earth Structures UFC 3-250-01, Pavement Design for Roads and Parking Areas UFC 3-260-02, Pavement Design for Airfields UFC 3-301-01

NFPA standards (cited by reference)
NFPA 780 Installation of Lightning Protection Systems — cited by AFSOCI 32-1084 (sections 8.1.1, 8) · read at NFPA free access ↗
NFPA 33 — cited by AFSOCI 32-1084 · read at NFPA free access ↗

NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.