Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.
Showing the controlling passages directly. (daily question limit reached — showing passages)
UFC 3-340-01 UNIFIED FACILITIES CRITERIA (UFC) DESIGN AND ANALYSIS OF HARDENED STRUCTURES TO CONVENTIONAL WEAPONS EFFECTS THIS DOCUMENT NOT AVAILABLE ON THE INTERNET WARNING: This document contains technical data that is restricted for export by the Arms Export Control Act (Title 22, U.S.C., Section 2751 et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violators of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD directive 5230.25. DISTRIBUTION: Distribution authorized to U.S. Government agencies and their contractors; Critical Technology, 1 August 1994. Approved for release to NATO and ABCA militarily aligned member countries. Other requests for this document shall be referred to:
and uses at permanent and austere installations. It also addresses routine facility camouflage and concealment preparations; including a brief review of design factors and considerations, siting, orientation and layout, and construction materials. Additional information on CCD design, factors and techniques are available in UFC 3-340-01, UFC 4-020-03FA, and AFH 10-222, Volume 10, Civil Engineer Camouflage, Concealment & Deception (CCD) Measures. Note: Although the CCD information in UFC 3-340-01 focuses on CCD techniques and design approaches for permanent and hardened structures, many of the CCD techniques and designs potentially apply to expeditionary and temporary construction. 6.3. General Guidelines. The fact an installation exists or is under construction is difficult to conceal fro
rogrammers must ensure planned window and door replacement or new installation included in any project for existing inhabited buildings, regardless of cost, meet UFC 4-010-01 glazing requirements. (T-0) Programmers must also ensure planned HVAC replacement or new installation included in any project for existing inhabited buildings, regardless of cost, must meet UFC 4-010-01 standard 18, Emergency Air Distribution Shutoff. (T-0) UFC 4-020-01, DoD Security Engineering Facilities Planning Manual, provides the initial AT process for identifying AT requirements, design basis threat, and protection levels. UFC 3-340-01, Design and Analysis of Hardened Structures for Conventional Weapons Effects, is also the design standard for DoD facility hardening against biological, chemical, and conventiona
anges (changes are indicated by \1\ ... /1/) Change No. Date Location 2 April 8, 2009 Change UFC number from 3-340-08AN _____________ This UFC supersedes TM 5-858-7, dated 15 October 1983. The format of this UFC does not conform to UFC 1-300-01; however, the format will be adjusted to conform at the next revision. The body of this UFC is a document of a different number. INACTIVE UFC 3-340-08AN 01 March 2005 2 FOREWORD \1\ The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD(AT&L) Memorandum dated 29 May 2002. UFC will be used for all DoD projects and work f
TERIA https://www.wbdg.org/dod/ufc FC 2-000-05N, Facility Planning Criteria For Navy and Marine Corps Shore Installations UFC 1-200-01, General Building Requirements UFC 3-301-01, Structural Engineering UFC 3-340-02, Structures to Resist the Effects of Accidental Explosions UFC 3-400-02, Design: Engineering Weather Data UFC 3-410-01, DoD Minimum Antiterrorism Standards For Buildings UFC 3-501-01, Electrical Engineering UFC 3-530-01, Interior And Exterior Lighting Systems UFC 3-570-01, Cathodic Protection UFC 3-575-01, Lightning and Static Electricity Protection Systems UFC 3-580-01, Telecommunications Interior Infrastructure Planning And Design UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-021-02, Electronic Security Systems UFC 4-026-01, Design To Resist Forced Entry UFC
romagnetic Radiation Hazards, February 1, 2005 T.O. 42C-1-11, Cleaning and Inspection Procedures for Ballistic Missile Systems, September 25, 1980 Note: This technical order has been cancelled, with no replacement. The Standards of the Hydraulic Institute UFC 1-200-01, DoD Building Code, October 8, 2019, Change 1 (October 1, 2020) UFC 3-301-01, Structural Engineering, October 1, 2019, Change 1 (February 4, 2022) UFC 3-340-02, Structures to Resist the Effects of Accidental Explosions, with Change 2, September 1, 2014 UFC 3-520-01, Interior Electrical Systems, with Change 2, April 12, 2021 UFC 3-600-01, Fire Protection Engineering for Facilities, with Change 6, May 6, 2021 UL 558 (2012, revised in 2021), Standard for Safety, Industrial Trucks, Internal Combustion Engine-Powered UL 583 (2012,
e Specifications (UFGS) Format Standard UFC 1-300-08, Criteria for Transfer and Acceptance of DoD Real Property FC 1-300-09N 17 May 2024 Change 1, 17 April 2025 186 UFC 3-101-01, Architecture UFC 3-201-02, Landscape Architecture UFC 3-210-10, Low Impact Development UFC 3-220-01, Geotechnical Engineering UFC 3-250-01, Pavement Design for Roads and Parking Areas UFC 3-260-02, Pavement Design for Airfields UFC 3-260-03, O&M Manual: Standard Practice for Airfield Pavement Evaluation UFC 3-301-01, Structural Engineering UFC 3-340-01, Design and Analysis of Hardened Structures to Conventional Weapons Effects (FOUO) UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 3-501-01, Electrical Engineering UFC 3-600-01, Fire Protection Engineering for Faci
e Safety Code 2012 NATIONAL INSTITUTE OF JUSTICE STANDARD (NIJ) NIJ) 0108.01, Ballistic Resistant Protective Materials, 1985 UNDERWRITER’S LABORATORY Underwriters Laboratories Standard 752, Bullet-Resisting Equipment, 2005 UNIFIED FACILITIES CRITERIA https://www.wbdg.org/dod/ufc UFC 1-200-01, DoD Building Code UFC 3-340-01, Design and Analysis of Hardened Structures to Conventional Weapons Effects (FOUO) UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings UFS 4-023-07 2 February 2026 51 UFC 4-020-01, DoD Security Engineering Facilities Planning Manual UFC 4-020-02, DoD Security Engineering Facilities Design Manual, currently in Draft and unavailable OTHER • H.P. White Laboratory, Inc. HPW-TP 0500.03, Test procedure: Transparent Materials for Use in Forced Entry or Containment B
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.