Ask a compliance question

Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.

Governing guidance

Showing the controlling passages directly. (daily question limit reached — showing passages)

UFC 3-230-06A 16 January 2004 UNIFIED FACILITIES CRITERIA (UFC) SUBSURFACE DRAINAGE APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED INACTIVE UFC 3-230-06A 16 January 2004 UNIFIED FACILITIES CRITERIA (UFC) SUBSURFACE DRAINAGE Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS (Preparing Activity) NAVAL FACILITIES ENGINEERING COMMAND AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location 2 5 Jul 2007 Replace hyperlink with document for EI 02C202 This UFC supersedes EI 02C202. The format of this UFC does not conform to UFC 1-300-01; however, the format will be adju

t of this UFC does not conform to UFC 1-300-01; however, the format will be adjusted to conform at the next revision. The body of this UFC is the previous EI 02C202. i INACTIVE UFC 3-230-06A 16 January 2004 2 FOREWORD \1\ The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD(AT&L) Memorandum dated 29 May 2002. UFC will be used for all DoD projects and work for other customers where appropriate. All construction outside of the United States is also governed by Status of forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some in

UFC 3-250-01 as of 2016-11-14 · official source ↗

ctor of Civil Engineers Director, Facilities Investment and Management DCS/Logistics, Engineering & Office of the Deputy Under Secretary of Defense Force Protection (Installations and Environment) UFC 3-250-01 14 November, 2016 UNIFIED FACILITIES CRITERIA (UFC) REVISION SUMMARY SHEET Document: UFC 3-250-01, PAVEMENT DESIGN FOR ROADS AND PARKING AREAS Superseding: This UFC supersedes UFC 3-250-01FA, dated January, 2004 and UFC 3-230-06A dated January 2004. Description: This revision provides pavement design procedures and requirements for the pavement design of roads and parking areas worldwide. It clarifies when State pavement design procedures may be used and when Pavement-Transportation Computer Assisted Structural Engineering (PCASE) is required. Reasons for Document: • This UFC updates

UFC 4-133-01 as of 2016-04-19 · official source ↗

onal parking should be considered for shift changes. Specific criteria are given in UFC 3-210-02, POV Site Circulation and Parking. 3-10.2 Pavement Design. Exterior paved areas include aircraft, pedestrian and vehicle access and parking. Vehicle access and parking should be in accordance with UFC 3-250-01FA, Pavement Design for Roads, Streets, Walks, and Open Storage Areas. UFC 4-133-01 19 April 2016 Change 2, 25 June 2019 60 3-10.3 Site Utilities. Reference UFC 3-210-01A, Area Planning, Site Planning and Design; UFC 3-210-06A, Site Planning and Design; and UFC 3-230-04A, Water Distribution. 3-10.4 Site Lighting. Orient exterior fixtures to minimize glare on ramps and taxiways. Use full cut-off type fixtures. Refer to UFC 3-260-01, Airfield and Heliport Planning and Design for clearance re

UFC 1-200-01 as of 2022-09-01 · official source ↗

nterior Design UFC 3-190-06, Protective Coatings and Paints UFC 3-201-01, Civil Engineering UFC 3-201-02, Landscape Architecture UFC 3-210-10, Low Impact Development UFC 3-220-01, Geotechnical Engineering UFC 3-230-01, Water Storage and Distribution UFC 3-230-03, Water Treatment UFC 3-240-01, Wastewater Collection and Treatment UFC 3-301-01, Structural Engineering UFC 3-301-02, Design of Risk Category V Structures, National Strategic Military Assets UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems CANCELLED UFC 1-200-01 01 September 2022 Change 4, 17 December 2024 71 UFC 3-420-01, Plumbing Systems UFC 3-430-05, Natural Gas and Liquefied Petroleum Gas (LPG) Distribution Pipelines UFC 3-460-01, Design: Petroleum Fuel Facilities UFC 3-490-0

UFC 3-130-04 as of 2025-01-16 · official source ↗

es UFC 3-230-01, Water Storage, Distribution, and Treatment UFC 3-301-01, Structural Engineering UFC 3-301-02, Design of Risk Category V Structures, National Strategic Military Assets UFC 3-400-02, Design: Engineering Weather Data UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 3-501-01, Electrical Engineering UFC 3-520-01, Interior Electrical Systems UFC 3-530-01, Interior and Exterior Lighting Systems UFC 3-540-01, Engine-Driven Generator Systems for Prime and Standby Power Applications UFC 3-550-01, Exterior Electrical Power Distribution UFC 3-570-01, Cathodic Protection UFC 3-575-01, Lightning and Static Electricity Protection Systems UFC 3-580-01, Telecommunications Interior Infrastructure Plannin

UFC 3-540-08 as of 2017-01-23 · official source ↗

nt Framework for DoD Information Technology JOINT SERVICE http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 1-200-01, DoD Building Code (General Building Requirements) UFC 3-201-01, Civil Engineering UFC 3-230-02, Operation and Maintenance: Water Supply Systems UFC 3-240-05A, Solid Waste Incineration UFC 3-240-10A, Sanitary Landfill UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-301-01, Structural Engineering UFC 3-400-02, Design: Engineering Weather Data UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-410-04N, Industrial Ventilation UFC 3-420-01, Plumbing Systems UFC 3-540-08 23 January 2017 127 UFC 3-430-02FA, Central Steam Boiler Plants UFC 3-430-03, Air Pollution Control Systems for Boiler and Incinerators UFC

UFC 4-150-02 as of 2020-11-12 · official source ↗

th the shore; a wharf is used for berthing or mooring vessels. May also be as above, except with continuous connection to shore. UFC 4-150-02 12 November 2020 201 REFERENCES F-1 GOVERNMENT PUBLICATIONS UNIFIED FACILITIES CRITERIA (UFC) https://www.wbdg.org/ffc/dod UFC 1-200-01, DoD Building Code UFC 3-190-06, Protective Coatings and Paints UFC 3-220-10N, Soil Mechanics UFC 3-230-01, Water Storage and Distribution UFC 3-400-02, Design: Engineering Weather Data UFC 3-430-09, Exterior Mechanical Utility Distribution UFC 3-460-01, Design: Petroleum Fuel Facilities UFC 3-501-01, Electrical Engineering UFC 3-520-01, Interior Electrical Systems UFC 3-550-01, Exterior Electrical Power Distribution UFC 3-560-01, Electrical Safety Operation and Maintenance UFC 3-570-01, Cathodic Protection UFC 3-575

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.