UFC 3-220-04FA 16 January 2004 UNIFIED FACILITIES CRITERIA (UFC) BACKFILL FOR SUBSURFACE STRUCTURES APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED UFC 3-220-04FA 16 January 2004 1 UNIFIED FACILITIES CRITERIA (UFC) BACKFILL FOR SUBSURFACE STRUCTURES Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS (Preparing Activity) NAVAL FACILITIES ENGINEERING COMMAND AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location This UFC supersedes TM 5-818-4, dated 1 June 1983. The format of this UFC does not conform to UFC 1-300-01; however, the format will be adjusted to confor

does not conform to UFC 1-300-01; however, the format will be adjusted to conform at the next revision. The body of this UFC is the previous TM 5-818-4, dated 1 June 1983. UFC 3-220-04FA 16 January 2004 2 FOREWORD \1\ The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with USD(AT&L) Memorandum dated 29 May 2002. UFC will be used for all DoD projects and work for other customers where appropriate. All construction outside of the United States is also governed by Status of forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instan

UFC 3-130-03 as of 2025-01-16 · official source ↗

ww.iccsafe.org IBC, International Building Code UNIFIED FACILITIES CRITERIA https://www.wbdg.org/dod/ufc UFC 1-200-01, DoD Building Code UFC 2-100-01, Installation Master Planning UFC 3-130-01, Arctic and Subarctic Engineering UFC 3-130-02, Arctic and Subarctic Site Selection and Development UFC 3-130-04, Arctic and Subarctic Buildings UFC 3-130-05, Arctic and Subarctic Utilities UFC 3-201-01, Civil Engineering UFC 3-220-01, Geotechnical Engineering UFC 3-220-04FA, Backfill for Subsurface Structures UFC 3-220-05, Dewatering and Groundwater Control UFC 3-220-08FA, Engineering Use of Geotextiles UFC 3-220-10, Soil Mechanics (DM 7.1) UFC 3-220-20, Foundations and Earth Structures UFC 3-250-01, Pavement Design for Roads and Parking Areas UFC 3-260-02, Pavement Design for Airfields UFC 3-301-01

FC 4-211-03F as of 2016-05-03 · official source ↗

b/browse_cat.php?o=29&c=4 UFC 3-201-01, Civil Engineering, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-201-02, Landscape Architecture, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-210-10, Low Impact Development, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-220-01, Geotechnical Engineering, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-220-04FA, Backfill for Subsurface Structures, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 FC 4-211-03F 3 MAY 2016 47 UFC 3-220-08FA, Engineering Use of Geotextiles, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-230-01, Water Storage, Distribution, and Transmission, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-240-01, Wastewater Collection, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-250-01FA,

UFC 3-580-01 as of 2024-11-21 · official source ↗

530.14A, Marine Corps Physical Security Program Manual MIL-DTL-32537, Detail Specification: Flowable Fill Backfill Material, Rapid Setting UNIFIED FACILITIES CRITERIA https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc FC 4-721-10N, Navy and Marine Corps Unaccompanied Housing UFC 1-200-01, DoD Building Code UFC 3-220-04FA, Backfill for Subsurface Structures CANCELLED UFC 3-580-01 21 November 2024 178 UFC 3-270-01, O&M Manual: Asphalt and Concrete Pavement Maintenance and Repair UFC 3-501-01, Electrical Engineering UFC 3-520-01, Interior Electrical Systems UFC 3-575-01, Lightning and Static Electricity Protection Systems UFC 3-530-01, Interior and Exterior Lighting Systems UFC 3-580-10, Navy and Marine Corps Intranet (NMCI) Standard Construction Practices (cancelled) UFC 3-580-02,

FC 4-721-02F as of 2015-04-01 · official source ↗

ccb/browse_cat.php?o=29&c=4 UFC 3-220-04FA, Backfill for Subsurface Structures, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-220-08FA, Engineering Use of Geotextiles, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-230-01, Water Storage, Distribution, and Transmission, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-240-01, Wastewater Collection, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 41 FC 4-721-02F 1 April 2015 UFC 3-250-01FA, Pavement Design for Roads, Streets, Walks and Open Storage Areas, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-250-04, Standard Practice for Concrete Pavements, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-250-08FA, Standard Practice for Sealing Joints and Cracks in Rigid and Flexible Pavements, http://www.wbdg.org/cc

UFC 4-141-10 as of 2022-09-22 · official source ↗

UFC 1-200-01 General Building Requirements UFC 2-000-05N Facility Planning Criteria for Navy/Marine Corps Shore Installations UFC 3-101-01 Architecture UFC 3-110-03 Roofing UFC 3-201-01 Civil Engineering UFC 3-220-01 Geotechnical Engineering UFC 3-250-01 Pavement Design for Roads and Parking Areas UFC 3-260-01 Airfield and Heliport Planning and Design UFC 3-260-04 Airfield and Heliport Marking UFC 3-301-01 Structural Engineering UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings UFC 4-141-10 22 September 2022 6 UFC 4-022-03 Security Fences and Gates UFC 3-401-01 Mechanical Engineering UFC 3-410-01 Heating, Ventilating and Air Conditioning Systems UFC 3-420-01 Plumbing Systems UFC 3-450-01 Noise and Vibration Control UFC 3-460-01 Design: Petroleum Fuel Facilities UFC 3-501-01 El

UFC 1-200-01 as of 2022-09-01 · official source ↗

nterior Design UFC 3-190-06, Protective Coatings and Paints UFC 3-201-01, Civil Engineering UFC 3-201-02, Landscape Architecture UFC 3-210-10, Low Impact Development UFC 3-220-01, Geotechnical Engineering UFC 3-230-01, Water Storage and Distribution UFC 3-230-03, Water Treatment UFC 3-240-01, Wastewater Collection and Treatment UFC 3-301-01, Structural Engineering UFC 3-301-02, Design of Risk Category V Structures, National Strategic Military Assets UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems CANCELLED UFC 1-200-01 01 September 2022 Change 4, 17 December 2024 71 UFC 3-420-01, Plumbing Systems UFC 3-430-05, Natural Gas and Liquefied Petroleum Gas (LPG) Distribution Pipelines UFC 3-460-01, Design: Petroleum Fuel Facilities UFC 3-490-0

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.