Ask a compliance question

Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.

Not found in the indexed publications — check the official source.

The passages provided reference UFC 3-220-01 (Geotechnical Engineering) as a document and list it in bibliographies, but they do not contain the actual technical content, requirements, or procedures from UFC 3-220-01 itself. To answer a question about UFC 3-220-01, you need access to the full document, available at https://www.wbdg.org/dod/ufc.

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.
Show the 8 source passage(s) this answer is built from
UFC 3-220-01 as of 2012-11-01 · official source ↗

CIL https://www.iccsafe.org/ International Building Code (IBC) NATIONAL CENTER FOR EARTHQUAKE ENGINEERING RESEARCH NCEER-97-0022, Proceedings of the NCEER Workshop on Evaluation of Liquefaction Resistance of Soils https://www.buffalo.edu/mceer/catalog.host.html/content/shared/www/mceer/publicat ions/NCEER-97-0022.detail.html UNIFIED FACILITIES CRITERIA \3\ https://www.wbdg.org/dod/ufc /3/ UFC 1-200-01, DoD Building Code FC 1-300-09N, Navy and Marine Corps Design Procedures UFC 3-220-05, Dewatering and Groundwater Control UFC 3-220-08FA, Engineering Use of Geotextiles UFC 3-220-10, Soil Mechanics (DM 7.1) \3\ UFC 3-220-20, Foundations and Earth Structures (DM 7.2) /3/ UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-301-01, Structural Engineering U.S. ARMY CORPS OF ENGINEERS ht

UFC 3-220-01 as of 2012-11-01 · official source ↗

interpretation and improvements. Technical content of UFC is the responsibility of the cognizant DoD working group. Recommended changes with supporting rationale may be sent to the respective DoD working group by submitting a Criteria Change Request (CCR) via the Internet site listed below. UFC are effective upon issuance and are distributed only in electronic media from the following source: • Whole Building Design Guide web site https://www.wbdg.org/dod. Refer to UFC 1-200-01, DoD Building Code, for implementation of new issuances on projects. AUTHORIZED BY: CANCELLED UFC 3-220-01 1 November 2012 Change 3, 1 July 2025 UNIFIED FACILITIES CRITERIA (UFC) REVISION SUMMARY SHEET Document: UFC 3-220-01, Geotechnical Engineering Superseding: UFC 3-220-01, Geotechnical Engineering, dated 1 Novem

UFC 3-220-01 as of 2012-11-01 · official source ↗

UFC 3-220-01 1 November 2012 Change 3, 1 July 2025 UNIFIED FACILITIES CRITERIA (UFC) GEOTECHNICAL ENGINEERING APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED CANCELLED UFC 3-220-01 1 November 2012 Change 3, 1 July 2025 GEOTECHNICAL ENGINEERING Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location 1 11/03/2021 Update to reference International Building Code 2018 (IBC 2018) as implemented by UFC 1-200-01. Clarifications to requirements not addressed by the

UFC 3-130-03 as of 2025-01-16 · official source ↗

ww.iccsafe.org IBC, International Building Code UNIFIED FACILITIES CRITERIA https://www.wbdg.org/dod/ufc UFC 1-200-01, DoD Building Code UFC 2-100-01, Installation Master Planning UFC 3-130-01, Arctic and Subarctic Engineering UFC 3-130-02, Arctic and Subarctic Site Selection and Development UFC 3-130-04, Arctic and Subarctic Buildings UFC 3-130-05, Arctic and Subarctic Utilities UFC 3-201-01, Civil Engineering UFC 3-220-01, Geotechnical Engineering UFC 3-220-04FA, Backfill for Subsurface Structures UFC 3-220-05, Dewatering and Groundwater Control UFC 3-220-08FA, Engineering Use of Geotextiles UFC 3-220-10, Soil Mechanics (DM 7.1) UFC 3-220-20, Foundations and Earth Structures UFC 3-250-01, Pavement Design for Roads and Parking Areas UFC 3-260-02, Pavement Design for Airfields UFC 3-301-01

UFC 4-151-10 as of 2001-09-10 · official source ↗

BLICATIONS 1. Unified Facilities Criteria (UFC): http://dod.wbdg.org \1\ UFC 1-200-01, General Building Requirements UFC 3-220-01N, Geotechnical Engineering Procedures for Foundation Design of Buildings and Structures UFC 3-220-10N Soil Mechanics UFC 3-301-01, Structural Engineering UFC 3-570-02N, Electrical Engineering Cathodic Protection UFC 3-600-01, Fire Protection Engineering for Facilities UFC 4-025-01, Waterfront Security Design; currently in final draft and near final publication UFC 4-150-06, Military Harbors and Coastal Facilities UFC 4-150-07, Maintenance of Waterfront Facilities UFC 4-150-08, Inspection of Mooring Hardware UFC 4-151-10 10 September 2001 With Change 1, 1 September 2012 32 UFC 4-152-01, Design: Piers and Wharves UFC 4-159-03, Design: Moorings /1/ Unified Faciliti

FC 4-211-03F as of 2016-05-03 · official source ↗

b/browse_cat.php?o=29&c=4 UFC 3-201-01, Civil Engineering, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-201-02, Landscape Architecture, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-210-10, Low Impact Development, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-220-01, Geotechnical Engineering, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-220-04FA, Backfill for Subsurface Structures, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 FC 4-211-03F 3 MAY 2016 47 UFC 3-220-08FA, Engineering Use of Geotextiles, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-230-01, Water Storage, Distribution, and Transmission, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-240-01, Wastewater Collection, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-250-01FA,

UFM 4-150-07 as of 2026-03-10 · official source ↗

piling, if storm runoff results in heavy soil loss. 10-3.3 Future Inspection Requirements. Where the rate of erosion or settlement has been increasing the structure must be closely monitored to provide early warning of impending failure. Where a major problem has been encountered and corrected, increased inspection may be necessary to ensure that the repair is effective. UFM 4-150-07 10 March 2026 193 APPENDIX A REFERENCES GOVERNMENT PUBLICATIONS Unified Facilities Criteria (UFC): https://www.wbdg.org/dod/ufc UFC 3-220-01, Geotechnical Engineering UFC 3-220-10, Soil Mechanics UFC 3-301-01, Structural Engineering UFC 3-570-01, Cathodic Protection UFC 4-151-10, General Criteria for Waterfront Construction UFC 4-152-01, Piers and Wharves UFC 4-213-10, Graving Drydocks UFC 4-213-12, Drydocking

UFC 4-141-10 as of 2022-09-22 · official source ↗

4-141-10 22 September 2022 131 UNIFIED FACILITIES CRITERIA https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc UFC 1-200-01, DoD Building Code UFC 2-000-05N, Facility Planning for Navy and Marine Corps Shore Installation UFC 2-100-01, Installation Master Planning UFC 3-101-01, Architecture UFC 3-110-03, Roofing UFC 3-201-01, Civil Engineering UFC 3-220-01, Geotechnical Engineering UFC 3-250-01, Pavement Design for Roads and Parking Areas UFC 3-260-01, Airfield and Heliport Planning and Design UFC 3-301 01, Structural Engineering UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 4-133-01, Air Traffic Control and Air Operations Facilities UFC 3-450-01, Noise and Vibration Control UFC 3-460-01, Desi

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.