Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.
Showing the controlling passages directly. (daily question limit reached — showing passages)
DOD Facilities in Support of Military Operations UFC 2-100-01, Installation Master Planning UFC 3-130-02, Arctic and Subarctic Site Assessment and Selection UFC 3-130-03, Arctic and Subarctic Foundations for Freezing and Thawing Conditions UFC 3-130-04, Arctic and Subarctic Buildings UFC 3-130-05, Arctic and Subarctic Utilities UFC 3-201-01, Civil Engineering UFC 3-130-01 03 December 2024 101 UFC 3-220-01, Geotechnical Engineering UFC 3-250-01, Pavement Design for Roads and Parking Areas UFC 3-250-03, Standard Practice Manual for Flexible Pavements UFC 3-250-04, Standard Practice for Concrete Pavements UFC 3-250-07, Standard Practice for Pavement Recycling UFC 3-250-08FA, Standard Practice for Sealing Joints and Cracks in Rigid and Flexible Pavements UFC 3-250-09FA, Aggregate Surfaced Road
UFC 3-130-01 03 December 2024 UNIFIED FACILITIES CRITERIA (UFC) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED ARCTIC AND SUBARCTIC ENGINEERING UFC 3-130-01 03 December 2024 This Page Intentionally Left Blank UFC 3-130-01 03 December 2024 UNIFIED FACILITIES CRITERIA (UFC) ARCTIC AND SUBARCTIC ENGINEERING Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS (Preparing Activity) NAVAL FACILITIES ENGINEERING COMMAND AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location This UFC supersedes UFC 3-130-01, dated 16 January 2004. UFC 3-130-01 03 December 2024 This Page Intentio
gures 2-7 and 2-8). Thus, the thawing season can be as late as June (Figure 2-9). 2 “One-Dimensional Computer Models to Estimate Frost Depth,” Barna et al. UFC 3-130-01 03 December 2024 17 Figure 2-4 Distribution of Mean Annual Air Temperature (οF) in North America, Derived over the Period of Record from the WorldIndex Database UFC 3-130-01 03 December 2024 18 Figure 2-5 Distribution of Mean Annual Air Temperature (οF) in Northern Eurasia, Derived over the Period of Record from the WorldIndex Database UFC 3-130-01 03 December 2024 19 Figure 2-6 Mean Date of the Beginning of the Freezing Season, Derived over the Period of Record from the WorldIndex Database UFC 3-130-01 03 December 2024 20 Figure 2-7 Average of the Number of Days in the Freezing Season in North America, Derived over the Per
to personnel or to protect property. A qualified electrician checking for the presence of voltage is not considered energized work. For energized work refer to AFMAN 32-1065, and UFC 3-560-01 for task specific required number of qualified electricians. Depending on the task, one member of the two- or three-person team will act as safety observer. (T-1) All employees will be trained in CPR and equipment shutdown procedures and responsible for immediate assistance in an emergency. (T-0) Install electrical equipment IAW guidance contained in NFPA 70, UFC 3-560-01, and AFMAN 32-1065. Note: Supervisor may be safety observer. 8.17.2. Additional PPE for Work On or Near Energized Equipment. Refer to NFPA 70, Sections 130.3. and 130.7., and UFC 3-560-01, Table 4.1., PPE Criteria, for additional gu
4 AFTTP 3-4.4, Contingency Airfield Operations, 2 November 2017 AFTTP 3-4.7, Contingency Response, 30 September 2017 MULTI-SERVICE PUBLICATIONS ETL 02-19, Airfield Pavement Evaluation Standards and Procedures, 12 November 2002 ETL 04-2, Standard Airfield Pavement Marking Schemes, with Change 2, 19 July 2004 ETL 09-6, c-130 and C-17 Landing Zone (LZ) Dimensional, Marking, and Lighting Criteria, 17 August 2009 ETL 94-01, Standard Airfield Pavement Marking Schemes, 4 May 1994 UFC 2-000-05N, Facility Planning Criteria for Navy/Marine Corps Shore Installations, Appendix E, Airfield Safety Clearances, January 1982 UFC 3-260-01, Airfield and Heliport Planning and Design, 17 November 2008 UFC 3-270-07, O&M: Airfield Damage Repair, 12 August 2002 UFC 3-535-01, Visual Air Navigation Facilities, 17 N
ange 6, 30 January 2026 207 OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA) https://www.osha.gov/ 29 CFR, Part 1990.141, Advanced Notice of Proposed Rulemaking 29 CFR, Part 1910, Occupational Safety and Health Standards for General Industry 29 CFR, Part 1926, Safety and Health Regulations for Construction UNIFIED FACILITIES CRITERIA (UFC) https://www.wbdg.org/dod/ufc UFC 1-200-01, DoD Building Code UFC 1-201-01, Non-Permanent DoD Facilities In Support of Military Operations UFC 3-301-02, Design of Risk Category V Structures, National Strategic Military Assets UFC 3-110-03, Roofing, Change 5 UFC 3-130-01, General Provisions - Arctic and Subarctic Construction (Inactive) UFC 3-130-06, Calculation Methods for Determination of Depth of Freeze and Thaw in Soil – Arctic and Subarctic Construc
CRITERIA https://www.wbdg.org/dod/ufc UFC 1-200-01, DoD Building Code UFC 3-430-09 28 July 2025 158 UFC 3-130-05, Arctic and Subarctic Utilities UFC 3-220-01, Geotechnical Engineering UFC 3-301-01, Structural Engineering UFC 3-401-01, Mechanical Engineering UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-420-01, Plumbing Systems UFC 3-420-02, Compressed Air UFC 3-430-05, Natural Gas and Liquified Petroleum Gas (LPG) Distribution Pipelines UFC 3-570-01, Cathodic Protection UFC 4-010-06, Cybersecurity of Facility-Related Control Systems (FRCS) UFC 4-150-02, Dockside Utilities for Ship Service UNIFIED FACILITIES GUIDE SPECIFICATIONS https://www.wbdg.org/dod/ufgs UFGS 09 97 13.28, Protection of Buried Steel Piping and Steel Bulkhead Tie Rods UFGS 22 14 29.00, Sump Pumps
interior taxilane clearance requirements. The V-22 Parking Block will not overhang the apron shoulder. USAFE-AFAFRICAI32-1007 6 OCTOBER 2021 135 Chapter 7 LANDING ZONES (LZ) FOR C-130 AND C-17 7.1. Criteria for LZs for C-130 and C-17. Criteria for LZs for C-130 and C-17 in the United States Air Forces in Europe and United States Air Forces Africa (USAFE-AFAFRICA) shall follow the criteria of Chapter 7 of the UFC 3-260-01, Airport and Heliport Planning and Design. Chapter 8 FIXED-WING SHORT TAKEOFF AND VERTICAL LANDING (STOVL) FACILITIES 8.1. Criteria for STOVL Facilities. Criteria for STOVL facilities in the United States Air Forces in Europe and United States Air Forces Africa (USAFE-AFAFRICA) shall follow the criteria of Chapter 8 of the UFC 3-260-01, Airport and Heliport Planning and De
NFPA text is copyrighted — we cite and link the official free-access viewer, never reproduce it.
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.