FC 4-179-03F as of 2015-04-01 · official source ↗

4-179-03F 1 April 2015 Change 2, 20 September 2021 50 B-2 U.S. AIR FORCE INDOOR RANGE INTERACTIVE PROGRAMMING SPREADSHEET. The Interactive Programming Spreadsheet assists programmers to determine the size of the direct and indirect support component of the range based on the training load requirement, as described in paragraph B-1. The Interactive Programming Worksheet can be found on the Whole Building Design Guide website: http://www.wbdg.org/references/pa_dod_sps.php FC 4-179-03F 1 April 2015 Change 2, 20 September 2021 51 \2\ Figure B-2 Indoor Small Arms Range Facility (14 Lane – Standard) FC 4-179-03F 1 April 2015 Change 2, 20 September 2021 52 Figure B-3 Indoor Small Arms Range Facility (21 Lane – Standard) FC 4-179-03F 1 April 2015 Change 2, 20 September 2021 53 Figure B-4 Indoor S

FC 4-179-03F as of 2015-04-01 · official source ↗

FC 4-179-03F 1 April 2015 Change 2, 20 September 2021 FACILITIES CRITERIA (FC) AIR FORCE INDOOR SMALL ARMS FIRING RANGE APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED FC 4-179-03F 1 April 2015 Change 2, 20 September 2021 FACILITIES CRITERIA (FC) UNITED STATES AIR FORCE INDOOR SMALL ARMS FIRING RANGE Any copyrighted material included in this FC is identified at its point of use. Use of the copyrighted material apart from this FC must have the permission of the copyright holder. AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location 1 8 July 2021 All references to ETL11-18 updated to UFC 4- 179-02, Small Arms Ranges. New range size calculator added to Appendix B. 2 20 September 2021 Updated Figures B-2, B-3, and B-4. FC 4-179-03

FC 4-179-03F as of 2015-04-01 · official source ↗

with the procedures in Chapter I. See Appendix B for conceptual facility floor plans. Three concept plans and the related BIM drawings are included in Appendix B. 12 SECONDARY/SERVICE ENTRANCE 13 SECONDARY MEANS OF EGRESS FC 4-179-03F 1 April 2015 Change 2, 20 September 2021 9 Figure 2-2 Functional Adjacency Diagram LEGEND ENTRY/EXIT B BUILDING ENTRY E EQUIPMENT ENTRY SP SECONDARY/PERSONNEL ENTRY MODULES A ADMINISTRATION B ARMS RANGE C TRAINING D MAINTENANCE E CLEANING F STORAGE G UTILITY H BUILDING SUPPORT FC 4-179-03F 1 April 2015 Change 2, 20 September 2021 10 This Page Intentionally Left Blank FC 4-179-03F 1 April 2015 Change 2, 20 September 2021 11 CHAPTER 3 FACILITY REQUIREMENTS AND CRITERIA MODULES 3-1 ADJACENCY DIAGRAM. The majority of administration/instructors and trainees will e

DAFMAN 31-131V1 · para 7.2 as of 2025-06-17 · View in PDF → · official source ↗

Guard Bureau Directorate of Logistics, NGB/A4, should consult AFIMSC and AF/A4S using the AFIMSC analysis to assist in their selection of the appropriate solution for their installations. The National Guard Bureau Security Forces, NGB/A4S, should notify AFIMSC of any decisions on the execution of funds for ANG small arms ranges. ANG Wing Commanders will coordinate small arms range issues through NGB/A4. (T-2) 7.2. Range and Support Facilities Criteria. When planning, constructing, and rehabilitating any type of range or range complex use UFC 4-179-02, FC 4-179-03F, and this instruction. Note: For the ARC, use UFC 4-179-02, FC 4-179-03F, this instruction and, as amended or supplemented guidance (e.g., ANGH 32-1084) consistent with DoDI 1225.08. The UFC and FC includes facilities criteria fo

UFC 3-410-01 as of 2025-07-28 · official source ↗

-acid (VRLA) batteries installed in cabinets must be provided with ventilation in accordance with UFC 3-520-05 and UFC 3-410-04.” Section 502.13 - Public garages [Replacement] Replace Section 502.13 with the following: “502.13 Public garages. Mechanical exhaust systems for public garages must be in accordance with the applicable provisions of NFPA 88A.” Section 502.19 - Indoor firing ranges [Replacement] Replace Section 502.19 with the following: “502.19 Indoor firing ranges. Mechanical ventilation systems must be provided in accordance with UFC 4-179-02 Small Arms Range Criteria. Additionally, for Air Force, mechanical ventilation systems must also be provided in accordance with FC 4-179-03F Air Force Indoor Small Arms Firing Range.” 3-2.5.3 Section 505 Domestic Cooking Exhaust Equipment.

buildings scheduled for demolition or non-real property facilities. The facility needs to have power. If no running water, the Commander ensures Defenders have water and restroom facilities. A3.4.4. The ideal facility has the capability to house all training tools. A3.4.5. Provide 24-hour access for shift workers. A3.5. Building Configuration. A3.5.1. The building should be configured for future expansion or reconfiguration. A3.5.2. Base the general size of the building on the number, type, and/or size of the primary training tools required to complete effective training. A3.6. Training Space Data Sheets. Use the following data sheets for specified training spaces. For weapons simulator data sheet, refer to Facility Criteria (FC)4-179-03F, Air Force Indoor Small Arms Firing Range, Figure 3

AFI 36-2654 · para 2.6.3.1 as of 2020-04-16 · open official PDF ↗

a minimum, inspect the items listed below. Note: All Air Force range criteria has been moved to UFC 4-179-02, which replaced Facilities Criteria 4-179-03F and Engineering Technical Letter 11-18. Units may not deviate from minimum design criteria items directed by UFC 4-179-02 without an approved waiver. (T-0).38 AFI36-2654 16 APRIL 2020 2.6.3.1. Backstop Condition. Dirt backstops should be regularly checked for erosion. If installed, check the bullet deflector/bullet catch for bullet holes and ensure the structure is firmly attached to the backstop. Check for erosion both behind the targets and at all points facing the shooters. Heavy lead buildup could cause ricochets. To test for excessive leading of the dirt backstop, tap a 3/8-inch rod at least 4-feet long into the earthen backstop usi

MIL-STD-3007 · para 5.1 as of 2019-11-01 · official source ↗

bdg.org/FFC/DOD/wbdg_moa.pdf. All UFC, FC, and UFGS are available on the WBDG website at htpps://www.wbdg.org/ffc/dod. 5 DETAILED REQUIREMENTS 5.1 Management procedures for UFC and FC. Purpose. UFC and FC are developed by individual DWGs or FWGs and approved by the ESEP. UFC and FC contain technical requirements, technical guidance, introduce new and innovative technology, or provide mandatory requirements to implement laws, regulations, executive orders, and policies prescribed by higher authority documents. UFC and FC also define performance and quality requirements for facilities to support their mission throughout their lifecycle. UFC and FC provide the most current operationally effective, cost-efficient, and safe criteria at the time of publication. Issuance. UFC and FC are issued un

Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.

Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.