FC 3-401-02N 01 September 2024 FACILITIES CRITERIA (FC) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED NAVY AND MARINE CORPS EXISTING BUILDING COMMISSIONING FC 3-401-02N 01 September 2024 This Page Intentionally Left Blank FC 3-401-02N 01 September 2024 FACILITIES CRITERIA (FC) NAVY AND MARINE CORPS EXISTING BUILDING COMMISSIONING Any copyrighted material included in this FC is identified at its point of use. Use of the copyrighted material apart from this FC must have the permission of the copyright holder. Indicate the Military Department Preparing Activity responsible for the document. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date
e planned approach for proceeding into the Ongoing Commissioning Phase (if the EBCx Contract includes the OCx Phase). Review comments are submitted to the Cx Provider and submittals are revised and re-submitted as necessary. FC 3-401-02N 01 September 2024 53 7-3 HAND-OFF PHASE DELIVERABLES. The Hand-Off Phase deliverables consist of the following: • Updated EBCx Report • Systems Manual, including the Facility Guide • OCx Plan FC 3-401-02N 01 September 2024 54 This Page Intentionally Left Blank FC 3-401-02N 01 September 2024 55 CHAPTER 8 ONGOING COMMISSIONING PHASE 8-1 OBJECTIVES. Whether this phase is included in the initial EBCx contract is resource-dependent. The Ongoing Commissioning (OCx) phase is typically conducted with separate resources from the EBCx Team involved in prior phases,
CENTER Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location FC 3-401-02N 01 September 2024 This Page Intentionally Left Blank FC 3-401-02N 01 September 2024 FOREWORD Facilities Criteria (FC) provide functional requirements (i.e., defined by users and operational needs of a particular facility type) for specific DoD Component(s), and are intended for use with unified technical requirements published in DoD Unified Facilities Criteria (UFC). FC are applicable only to the DoD Component(s) indicated in the title and do not represent unified DoD requirements. Differences in functional requirements between DoD Components may exist due to differences in policies and operational needs. All construction outside of the United States is also governed by Status of Forces
g activities to the size and complexity of the buildings and systems. For Air Force and Navy assessments, the Assessment Team must determine the level of commissioning activities required. For Navy projects, comply with FC 3-401- 02N. For Medical Treatment Facilities, refer to UFC 4-510-01 Design: Military Medical Facilities for additional commissioning requirements. /3/ 3-3 OPTIMIZE ENERGY PERFORMANCE. 3-3.1 Energy Efficiency. 3-3.1.1 Commercial and Multi-Family High-Rise Residential Buildings or Low-Rise Residential. (Required; Building-specific) \1\ When LCCE, h /1/ as energy usage met one of the following performance options? • Reduce measured building energy use by at least 30% below the FY 2003, or earlier, energy use baseline10. • Reduce modeled building energy use (from all sources
bdg.org/FFC/DOD/wbdg_moa.pdf. All UFC, FC, and UFGS are available on the WBDG website at htpps://www.wbdg.org/ffc/dod. 5 DETAILED REQUIREMENTS 5.1 Management procedures for UFC and FC. Purpose. UFC and FC are developed by individual DWGs or FWGs and approved by the ESEP. UFC and FC contain technical requirements, technical guidance, introduce new and innovative technology, or provide mandatory requirements to implement laws, regulations, executive orders, and policies prescribed by higher authority documents. UFC and FC also define performance and quality requirements for facilities to support their mission throughout their lifecycle. UFC and FC provide the most current operationally effective, cost-efficient, and safe criteria at the time of publication. Issuance. UFC and FC are issued un
vileges include the same privileges as user accounts as well as the ability to approve drafts SARs for release to an FC approver. (4) FC Approver. The FC approver account is reserved for the individuals assigned to an FC, whose duties are to evaluate incidents and perform other administrative functions with respect to the eGuardian system. The FC approver reviews and approves incidents to be released into the eGuardian system. An FC approver is a designated person who has received the required SAR analyst training. d. Application for Access Procedures. (1) Applications for access are routed through the respective DoD Component eGuardian program manager. (2) The program manager, or designated account manager, uses the “Pending Users” feature within eGuardian to approve or disapprove eGuardi
thority will only be executed by a commander; it will not be delegated to a vice or deputy commander, or below wing/delta commander. (T-1) 5.2.4. If Convening Authority responsibility is transferred, the accounting organization remains the unit of assignment for the damaged assets or injured personnel. 5.3. Events Involving Multiple Commands. Involved MAJCOM/FC commanders will determine which MAJCOM/FC will assume investigative responsibility and advise AF/SE within 24 hours. In general, the MAJCOM/FC whose asset initiated the event will assume investigative responsibility. However, if initially unclear, the MAJCOM/FC sustaining the highest level of loss in the event will assume investigative responsibility. The MAJCOM/FC commander may determine other compelling reasons exist for assigning
cal process. Note: ARC wing Command Chiefs will serve as the OPR and identify the appropriate member or position to manage these courses for their wing. 3.4.2. The DAs will conduct enough FC offerings to accommodate EPME prerequisite requirements for the installation and associated Geographically Separated Units (GSU) population. (T-1) 3.4.3. The DAs will execute FCs through IR or virtual IR synchronous delivery. Asynchronous training or DL does not meet the intent for the FC curriculum. 3.5. Foundations Course Tracking. 3.5.1. DAs will maintain student graduation rosters for a minimum of twelve months. DAs may provide certificates annotated with FC course codes and course title. 3.5.2. DAs will update Airmen’s FC completion in the Oracle Training Application (OTA) system of record based o