Plain English, any career field. Answers cite the AF pub + paragraph, your command's supplement, and the federal (OSHA/CFR) standard behind it — with the official PDF one click away.
FC 1-300-09N 17 May 2024 Change 1, 17 April 2025 FACILITIES CRITERIA (FC) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED NAVY AND MARINE CORPS DESIGN PROCEDURES FC 1-300-09N 17 May 2024 Change 1, 17 April 2025 This Page Intentionally Left Blank FC 1-300-09N 17 May 2024 Change 1, 17 April 2025 FACILITIES CRITERIA (FC) NAVY AND MARINE CORPS DESIGN PROCEDURES Any copyrighted material included in this FC is identified at its point of use. Use of the copyrighted material apart from this FC must have the permission of the copyright holder. Indicate the preparing activity beside the Service responsible for preparing the document. U.S. ARMY CORPS OF ENGINEERS NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND (Preparing Activity) AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indica
Activity) AIR FORCE CIVIL ENGINEER CENTER Record of Changes (changes are indicated by \1\ ... /1/) Change No. Date Location 1 17 April 2025 Reorganization of Chapter 1 paragraphs; removed AFFF from Chapters 6 and 7; cost changes in Chapter 9; updated para 12-4 and 13-5; mods to B-3.3.1 b,c,d; addressed CCRs; added FRCS consideration for existing buildings; broken weblinks fixed; minor word changes throughout, in accordance with para 7-5. This FC supersedes FC 1-300-09N, dated May 2014, with Change 6 dated July 2021. FC 1-300-09N 17 May 2024 Change 1, 17 April 2025 This Page Intentionally Left Blank FC 1-300-09N 17 May 2024 Change 1, 17 April 2025 FOREWORD Facilities Criteria (FC) provide functional requirements (i.e., defined by users and operational needs of a particular facility type) f
st. The form is also accessible from the Internet site listed below. FC are effective upon issuance and are distributed only in electronic media from the following source: • Whole Building Design Guide website https://www.wbdg.org/dod. Refer to UFC 1-200-01, DoD Building Code, for implementation of new issuances on projects. AUTHORIZED BY: ___________________________________ S. Keith Hamilton, P.E. Chief Engineer and Assistant Commander for Planning, Design and Construction n Naval Facilities Engineering Systems Command (NAVFAC) FC 1-300-09N 17 May 2024 Change 1, 17 April 2025 This Page Intentionally Left Blank FC 1-300-09N 17 May 2024 Change 1, 17 April 2025 i TABLE OF CONTENTS CHAPTER 1 INTRODUCTION ....................................................................................... 1
e Mammals 50 CFR 22, Eagle Permits 50 CFR 600 Subpart J, Essential Fish Habitat (EFH) UFC 3-810-01 1 September 2025 57 DEPARTMENT OF DEFENSE (DOD) DoDI 4710.02, DoD Interactions with Federally Recognized Tribes DoDI 4715.27, DoD Low Level Radioactive Waste (LLRW) Program DoDI 6055.01, DoD Safety and Occupational Health (SOH) Program DOD FACILITIES CRITERIA FC 1-300-09N, Navy and Marine Corps Design Procedures https://www.wbdg.org/dod/ufc/fc-1-300-09n DOD UNIFIED FACILITIES CRITERIA https://www.wbdg.org/dod/ufc UFC 1-200-01, DoD Building Code UFC 3-101-01, Architecture UFC 3-201-01, Civil Engineering UFC 3-210-10, Low Impact Development UFC 3-410-01, Heating, Ventilating, and Air Conditioning Systems UFC 3-460-01, Design Petroleum Fuel Facilities UFC 4-010-06, Cybersecurity of Facility-Rela
ult in controversy and contractor claims for additional compensation. For Army and Navy design-bid-build specifications, the use of SPECSINTACT and Unified Facilities Guide Specifications (UFGS) is required. These documents are available on the WBDG website. For Air Force projects, the use of UFGS or other commercial guide specifications is at the discretion of the Air Force Project Manager. For projects using UFGS, comply with UFC 1-300-02. For Navy projects, see also FC 1-300-09N. When preparing a Design-Build Request for Proposal (RFP), see the NAVFAC Design Build Master website located at https://www.wbdg.org/ffc/navy-navfac/design-build-request- proposal. 5-2.5 Architectural Drawings. Confirm drawing size with the Government Project Manager prior to starting drawings. Provide architec
ied Petroleum Gas Code NFPA 70, National Electrical Code® NFPA 101, Life Safety Code® NFPA 285, Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Wall Assemblies Containing Combustible Components UNIFIED FACILITIES CRITERIA https://www.wbdg.org/dod/ufc UFC 1-200-02, High Performance and Sustainable Building Requirements UFC 1-201-01, Non-Permanent DoD Facilities in Support of Military Operations UFC 1-201-02, Assessment of Existing Facilities for Use in Military Operations \2\ /2/ UFC 1-300-02, Unified Facilities Guide Specifications (UFGS) Format Standard FC 1-300-09N, Navy and Marine Corps Design Procedures UFC 3-101-01, Architecture UFC 3-110-03, Roofing UFC 3-120-10, Interior Design UFC 3-190-06, Protective Coatings and Paints UFC 3-201-01, Civil
cations; show information only once to avoid conflicts. For the Navy, additionally comply with FC 1-300-09N for specific drawing requirements and drawing phases. Utilize electrical design “Best Practices Information” located at https://www.wbdg.org/dod/supp-tech-documents to facilitate drawing requirements and related equipment detail required by the remaining paragraphs of this UFC. Provide a General Note at the beginning of the Electrical Drawings clarifying the work to be accomplished. The following note is required unless directed or approved by the government: “ELECTRICAL WORK AND MATERIAL IS NEW AND PROVIDED BY THE CONTRACTOR UNLESS INDICATED OTHERWISE”. a. Arrangement. Arrange the Electrical Drawings in accordance with the National CAD standards at https://www.nationalcadstandard.or
il 2020 14 economically for the life of the facility. • Environmental Influences: Design for the specific climate of each Installation. Where unheated pools and open-air bathhouses are planned, environmental considerations include the control of sunlight and wind by shading, tunneling, blocking, or other methods. General Design Process. Prepare designs through an iterative process of submittals, user reviews, and discussions to reconcile comments in accordance with A/E Statement of Work and service-specific design procedures (e.g., FC 1-300-09N). 3-2 SITE DESIGN. Site the aquatic facility so the main entrance is clearly visible, and the architecture provides intuitive wayfinding cues to guide visitors to the main entrance. Preserve and utilize natural site features, such as topography, tre
⚠ Unofficial. Answers come from indexed publication text and may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Always verify against the official publication before acting, citing, or writing a finding.
New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.