49 CFR 173.474 — Quality control for construction of packaging.

eCFR 2026-07-09 public domain
Official text: ecfr.gov →

Full text

Prior to the first use of any packaging for the shipment of Class 7 (radioactive) material, the offeror shall determine that—

(a) The packaging meets the quality of design and construction requirements as specified in this subchapter; and

(b) The effectiveness of the shielding, containment and, when required, the heat transfer characteristics of the package, are within the limits specified for the package design.

← 49 CFR 173 sections · CFR library · Crosswalk

Unofficial reference aid. Confirm against the current eCFR edition before citing in a finding.
Free · no spam

Get AFI changes and new cross-references by email

New and updated AFIs, supplements, and OSHA cross-references as we index them — straight to your inbox.