CheckMyAFI Evidence pack
Download .md

Compliance evidence pack (unofficial)

Generated: 2026-07-21 16:21 UTC Catalog checked: 2026-07-12 Supplement layer: none selected Source: CheckMyAFI (https://checkmyafi.com)
Q: UFS 3-600-01
UNOFFICIAL REFERENCE — VERIFY BEFORE CITING. This pack quotes indexed copies of public publications. The certified PDF on e-Publishing (linked under every quote) is the only authoritative source. Your MAJCOM/unit supplement may add stricter requirements.

Synthesized answer (unofficial)

I need clarification on your question. You've provided the citation "UFS 3-600-01" but have not asked a specific question about the content.

UFS 3-600-01 is the *Unified Facilities Supplement: Fire Protection Engineering for Facilities* (current as of 12 June 2026). The passages show it addresses fire alarm systems for elevators, navigation locks, and other fire protection topics, but no specific question has been posed.

Please ask a specific question about UFS 3-600-01 or fire protection engineering requirements, and I will answer using only the passages provided.

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.

Controlling Air Force guidance (quoted)

DAFMAN 91-203 para 24.14.2.1, p. 272 (effective/current as of 2026-06-25)

ticle 513, Standard on Aircraft Hangars, NFPA 409, Standard on Aircraft Hangars, NFPA 410, UFC 3-600-01, and associated engineering technical letters (ETLs) for detailed design guidance. Note 1: ETLs supplement UFC 3-600-01 and compliance with ETLs is required per AFI 32-1023, Designing and Constructing Military Construction Projects. Note 2: ETLs take precedence in conflicts with national fire codes, building codes or UFC 3-600-01. 24.14.2.1. Fixed electrical equipment approved for Class I, Division 1 locations may be used in Class I, Division 2 locations of the same class and compatibility group. Equipment not meeting these guidelines will be de-energized or disabled and locked out until special operations are complete and hazardous conditions permanently eliminated. (T-1) Refer to parag

Official source: https://static.e-publishing.af.mil/production/1/af_se/publication/dafman91-203/dafman91-203.pdf View in PDF →
DAFI 32-2001 para 7.2.4.1.3, p. 44 (effective/current as of 2026-04-01)

clude missing fire protection systems or missing NFPA 101 features in any building or process. Any facility FSD which is non-compliant with the following is considered an FSD I: 7.2.4.1.1. New Facilities. New facilities must meet the requirements specified in UFC 3-600-01. (T-0) Such facilities must not be considered as complete and usable until the deficiency is corrected. (T-2) 7.2.4.1.2. For Modernized, Renovated, Repaired, Restored, Upgraded and Change-of- Occupancy Facilities, these facilities must meet the requirements of UFC 3-600-01. (T-0) 7.2.4.1.3. Existing Facilities. Existing facilities must meet the minimum requirements of NFPA 101 for existing occupancies in accordance with UFC 3-600-01. (T-0) 7.2.4.1.4. Impairments. Identified fire safety feature impairments for existing occ

Official source: https://static.e-publishing.af.mil/production/1/af_a4/publication/dafi32-2001/dafi32-2001.pdf View in PDF →

Supplement deltas

No supplement passage retrieved — check the supplement chain on the pub page before citing.

Federal / DoD standards implemented (quoted)

No federal/DoD passage retrieved.

NFPA standards (cited by reference — copyrighted, not quoted)

Retrieval confidence: 95.54 · Generated by CheckMyAFI — an unofficial reference. Not an official Air Force product. Verify every citation against the certified publication.