CheckMyAFI Evidence pack
Download .md

Compliance evidence pack (unofficial)

Generated: 2026-07-21 13:41 UTC Catalog checked: 2026-07-12 Supplement layer: none selected Source: CheckMyAFI (https://checkmyafi.com)
Q: UFC 4-151-10
UNOFFICIAL REFERENCE — VERIFY BEFORE CITING. This pack quotes indexed copies of public publications. The certified PDF on e-Publishing (linked under every quote) is the only authoritative source. Your MAJCOM/unit supplement may add stricter requirements.

Synthesized answer (unofficial)

# UFC 4-151-10

UFC 4-151-10 is the Unified Facilities Criteria document titled *General Criteria for Waterfront Construction*, current as of 10 September 2001 with Change 1 dated 1 September 2012 [UFC 4-151-10].

The document covers waterfront construction design and includes chapters on piling [UFC 4-151-10, Chapter 2], deterioration of waterfront structures [UFC 4-151-10, Chapter 7], and load test interpretation [UFC 4-151-10 6-4.4]. It cancels and supersedes MIL-HDBK-1025/6 from May 1988 [UFC 4-151-10].

Change 1 (1 September 2012) removed section 5-5.2 regarding "Emergency Power" and modified section 4-1 [UFC 4-151-10, Record of Changes].

The document is prepared jointly by the U.S. Army Corps of Engineers and Naval Facilities Engineering Command, with Air Force Civil Engineer Support Agency participation [UFC 4-151-10].

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.

Controlling Air Force guidance (quoted)

No departmental passage retrieved.

Supplement deltas

No supplement passage retrieved — check the supplement chain on the pub page before citing.

Federal / DoD standards implemented (quoted)

No federal/DoD passage retrieved.

Retrieval confidence: 85.08 · Generated by CheckMyAFI — an unofficial reference. Not an official Air Force product. Verify every citation against the certified publication.