# UFC 4-151-10
UFC 4-151-10 is the Unified Facilities Criteria document titled *General Criteria for Waterfront Construction*, current as of 10 September 2001 with Change 1 dated 1 September 2012 [UFC 4-151-10].
The document covers waterfront construction design and includes chapters on piling [UFC 4-151-10, Chapter 2], deterioration of waterfront structures [UFC 4-151-10, Chapter 7], and load test interpretation [UFC 4-151-10 6-4.4]. It cancels and supersedes MIL-HDBK-1025/6 from May 1988 [UFC 4-151-10].
Change 1 (1 September 2012) removed section 5-5.2 regarding "Emergency Power" and modified section 4-1 [UFC 4-151-10, Record of Changes].
The document is prepared jointly by the U.S. Army Corps of Engineers and Naval Facilities Engineering Command, with Air Force Civil Engineer Support Agency participation [UFC 4-151-10].
Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.
No departmental passage retrieved.
No supplement passage retrieved — check the supplement chain on the pub page before citing.
No federal/DoD passage retrieved.