UFC 4-021-01 is the Unified Facilities Criteria for Design and O&M: Mass Notification Systems [UFC 4-021-01, 9 April 2008, Change 1, January 2010].
The document incorporates mass notification system (MNS) design requirements for the Air Force, Army, Marine Corps, and Navy. Key revisions include new design figures, criteria approving combined MNS and fire alarm systems in some facilities, chapters on wide area MNS, operational characteristics, special considerations, and sample pre-recorded MNS messages [UFC 4-021-01 Revision Summary].
The current version reflects lessons learned from field experience and is approved for public release with unlimited distribution [UFC 4-021-01, 9 April 2008, Change 1, January 2010].
Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.
AFSOCI 32-1084 para 7.4.37 (effective/current as of 2023-02-21)tant drains. Applicable criteria include UFC 3-401-01 for mechanical & UFC 3-410-01 for HVAC. Electrical Industrial equipment typically requires 240- and 480-volt, three-phase electrical current. Use commercial grade convenience receptacles and special power outlets. Consult X-ray and other NDI equipment specifications for their specific power requirements. Applicable criteria include UFC 3-501-01 for general electrical requirements, UFC 3-520-01 for interior electrical systems requirements, UFC 3-530-01 for interior and exterior lighting and controls requirements, UFC 3-550-01 for exterior power distribution systems requirements, UFC 3-560-01 for electrical safety and electrical O&M requirements, UFC 3-580-01 for building telecommunications requirements, and UFC 4-021-01 for mass notifica
No supplement passage retrieved — check the supplement chain on the pub page before citing.
No federal/DoD passage retrieved.