CheckMyAFI Evidence pack
Download .md

Compliance evidence pack (unofficial)

Generated: 2026-07-21 13:52 UTC Catalog checked: 2026-07-12 Supplement layer: none selected Source: CheckMyAFI (https://checkmyafi.com)
Q: UFC 3-490-04A
UNOFFICIAL REFERENCE — VERIFY BEFORE CITING. This pack quotes indexed copies of public publications. The certified PDF on e-Publishing (linked under every quote) is the only authoritative source. Your MAJCOM/unit supplement may add stricter requirements.

Synthesized answer (unofficial)

UFC 3-490-04A is an INACTIVE Unified Facilities Criteria document [UFC 3-490-04A current as of 2003-05-15]. It addresses Indoor Radon Prevention and Mitigation and supersedes TI 810-91, dated 3 August 1998 [UFC 3-490-04A Foreword]. The document was prepared by the U.S. Army Corps of Engineers with the Naval Facilities Engineering Command and Air Force Civil Engineer Support Agency [UFC 3-490-04A 15 May 2003].

Since this UFC is marked INACTIVE, it is no longer the current governing standard. For current radon-related criteria, consult active UFC documents or current DoD building codes.

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.

Controlling Air Force guidance (quoted)

AFSOCI 32-1084 para 7.4.37 (effective/current as of 2023-02-21)

tant drains. Applicable criteria include UFC 3-401-01 for mechanical & UFC 3-410-01 for HVAC. Electrical Industrial equipment typically requires 240- and 480-volt, three-phase electrical current. Use commercial grade convenience receptacles and special power outlets. Consult X-ray and other NDI equipment specifications for their specific power requirements. Applicable criteria include UFC 3-501-01 for general electrical requirements, UFC 3-520-01 for interior electrical systems requirements, UFC 3-530-01 for interior and exterior lighting and controls requirements, UFC 3-550-01 for exterior power distribution systems requirements, UFC 3-560-01 for electrical safety and electrical O&M requirements, UFC 3-580-01 for building telecommunications requirements, and UFC 4-021-01 for mass notifica

Official source: https://static.e-publishing.af.mil/production/1/afsoc/publication/afsoci32-1084/afsoci32-1084.pdf

Supplement deltas

No supplement passage retrieved — check the supplement chain on the pub page before citing.

Federal / DoD standards implemented (quoted)

No federal/DoD passage retrieved.

NFPA standards (cited by reference — copyrighted, not quoted)

Retrieval confidence: 100.0 · Generated by CheckMyAFI — an unofficial reference. Not an official Air Force product. Verify every citation against the certified publication.