## Controlling Air Force guidance (quoted)

_No departmental passage retrieved._

## Supplement deltas

_No supplement passage retrieved — check the supplement chain before citing._

## Federal / DoD standards implemented (quoted)

**DoDI 5000.73 para 4270.05** (effective/current as of 2024-10-24)

> ntal funding which may not exceed the $500 million threshold in any given year. To support this requirement and ensure that this requirement does not delay the award of such contracts in the event of cost growth, CAPE conducts an estimate of costs for any MILCON project likely to exceed a value of $400 million: (a) In advance of the authority to advertise decision. (b) At any other time considered appropriate by the DCAPE or upon the request of the USD(A&S) or the DoD construction agent (DCA) as designated in DoD Directive 4270.05. (2) CAPE may, at its discretion, delegate the authority for the conduct of the cost estimate to the DCA. Estimates that are delegated must be conducted in accordance with the relevant DCA policies and procedures and Unified Facilities Criteria (UFC) 3-740-05, 3-