# Compliance evidence pack (UNOFFICIAL)

- **Question:** UFC 4-720-01
- **Generated:** 2026-07-21 20:12 UTC
- **e-Publishing catalog checked:** 2026-07-12
- **Supplement layer:** none selected
- **Source:** CheckMyAFI (https://checkmyafi.com) — unofficial reference

> **UNOFFICIAL — VERIFY BEFORE CITING.** Quotes come from indexed copies of public publications. The certified PDF on e-Publishing is the only authoritative source. Your MAJCOM/unit supplement may be stricter.

## Controlling Air Force guidance (quoted)

**DAFMAN 34-135 para 5.1.4, p. 26** (effective/current as of 2026-06-23)

> NAFs, or a third party, will comply with DoD UFC 4-720-01, or state and local building codes applicable to local conditions at the time of facility construction or major renovation, but only to the same extent as DoD lodging facilities that are privatized. 5.1.4. AF Inns facility construction will conform to project justification guidance, funding sources, and reporting requirements IAW DoDI 1015.15, Establishment, Management, and Control of Nonappropriated Fund Instrumentalities and Financial Management of Supporting Resources; DoDI 7700.18, Commissary Surcharge, Nonappropriated Fund (NAF), and Privately Financed Construction Reporting Procedures; DoDI 7700.20, Commissary Surcharge, Nonappropriated Fund (NAF), and Privately Financed Construction Policy; and where applicable, DoDI 1015.13,

Official source: https://static.e-publishing.af.mil/production/1/af_a1/publication/dafman34-135/dafman34-135.pdf

**AFH 23-123V2 Part 3 para 12.30** (effective/current as of 2017-10-03)

> LAG PIC X(01) Note 1 05 720-OPR-DATA PIC X(10) Note 2 05 720-USER-FILE PIC X(25) Note 3 05 720-DATA-ELT PIC X(01) Note 4 05 720-PC-DOWNLOAD-MSG PIC X(01) Note 5 05 720-MEDIA-T PIC X(01) Note 6 05 720-MEDIA-L PIC X(01) Note 7 05 720-CHANGE-DATE PIC X(08) Note 8 05 720-CHANGE-TIME PIC X(06) Note 8 05 720-CHANGE-USER PIC X(06) Note 9 05 720-WARTIME-FLAG PIC X(01) Note 12 O5 720-LENGTH PIC 9(02) Note 11 USAGE IS COMP 05 720-OUTPUT-FUNCTION-PID PIC 9(06) Note: 1. PSEUDO-FLAG. This field will contain a P if inbound images with this TRIC are to be loaded to pseudo; otherwise, this field will be blank. 2. OPR-DATA. This field is used to identify the owner of inbound data images with this TRIC. This code will be printed on all significant transactions that affect this TRIC. This field will normally

Official source: https://static.e-publishing.af.mil/production/1/publication/afh23-123v2pt3/afh23-123v2pt3.pdf

**AFSOCI 32-1084** (effective/current as of 2023-02-21)

> AFI11-2MQ-1&MQ-9V3 Paragraph 3.7.2: Minimum MQ-9 runway width is 75 ft. 111- 115 Paved Overrun - Length (min.) LF 200 200 200 Corresponds to Air Force Class A runway, per ETL 09-1, Section 6.1.2 and UFC 3-260-01 Table 3-4. 111- 115 Paved Overrun - Width (min.) LF 75 75 75 Corresponds to Air Force Class A runway, per ETL 09-1, Section 6.1.2 and UFC 3-260-01 Table 3-4. 112- 211 Taxiway Width LF 50 50 50 AFI11-2MQ-1&MQ-9V3 Paragraph 3.7.3: Minimum MQ-9 taxiway width is 50ft. 112- 211 Taxiway Paved Shoulder LF 25 25 25 Corresponds to Air Force Class A runway, per ETL 09-1, Section 6.1.2 and UFC 3-260-01 Table 5-1. 113- 321 Aircraft Parking Apron NSF 35,080 91,720 156,460 The numbers in this table are requirements with sun shades. DAFMAN 32-1084 Para 2.1.5.3.3 and 2.1.5.3.4: Multiply the aircr

Official source: https://static.e-publishing.af.mil/production/1/afsoc/publication/afsoci32-1084/afsoci32-1084.pdf

## Supplement deltas

_No supplement passage retrieved — check the supplement chain before citing._

## Federal / DoD standards implemented (quoted)

_No federal/DoD passage retrieved._

## NFPA standards (cited by reference — copyrighted, not quoted)

- **NFPA 780** Installation of Lightning Protection Systems — cited by AFSOCI 32-1084 — official viewer: https://link.nfpa.org/free-access/publications/780/latest
- **NFPA 33**  — cited by AFSOCI 32-1084 — official viewer: https://link.nfpa.org/free-access/publications/33/latest

---
Retrieval confidence: 100.0 · CheckMyAFI is not an official Air Force product. Verify every citation against the certified publication.