# Compliance evidence pack (UNOFFICIAL)

- **Question:** UFC 4-211-01
- **Generated:** 2026-07-21 17:16 UTC
- **e-Publishing catalog checked:** 2026-07-12
- **Supplement layer:** none selected
- **Source:** CheckMyAFI (https://checkmyafi.com) — unofficial reference

> **UNOFFICIAL — VERIFY BEFORE CITING.** Quotes come from indexed copies of public publications. The certified PDF on e-Publishing is the only authoritative source. Your MAJCOM/unit supplement may be stricter.

## Controlling Air Force guidance (quoted)

**AFTTP 3-2.68** (effective/current as of 2024-07-11)

> mage Repair, 12 August 2002 UFC 3-535-01, Visual Air Navigation Facilities, 17 November 2005 UFC 3-535-02, Design Drawings for Visual Air Navigation Facilities, 17 November 2005 UFC 4-010-01, DOD Minimum Antiterrorism Standards for Buildings with Change 1, 1 October 2013 UFC 4-133-01N, Navy Air Traffic Control Facilities, 24 February 2005 UFC 4-211-01N, Aircraft Maintenance Hangars: Type I, Type II and Type III with Change 3, 27 September 2007 OTHER PUBLICATIONS 120 ATP 3-17.2/MCRP 3-20B.1/NTTP 3-02.18/AFTTP 3-2.68 27 October 201814 Code of Federal Regulations, Aeronautics and Space, Part 65: Certification: Airmen other than Flight Crewmembers, Accessed 18 January 18 AMCI 11-211, Destination Airfield Suitability Analysis, 18 May 2017 Air Land Sea Bulletin, Issue number 2016-2, Summer 2016

Official source: https://static.e-publishing.af.mil/production/1/lemay_center/publication/afttp3-2.68/afttp3-2.68.pdf

**AFSOCI 32-1084** (effective/current as of 2023-02-21)

> ure hot water capability to comply with requirements driven by TO, OSHA, and other safety standards. Applicable criteria include UFC 3-420-01 for plumbing. AFSOCI32-1084 24 JUNE 2022 635 Fire Protection Provide fire protection in accordance with UFC 3-600-01, UFC 4-021-01, and UFC 4-211-01. Per UFC 3-600-01 Paragraph 4-4.1, fixed wing and rotary wing aircraft fuel cell maintenance facilities, alert, storage, depot-level and general-purpose maintenance hangars comply with UFC 4-211-01. Per UFC 4-211-01 Paragraph 3-6.17, provide a hydraulically designed, low level Hi-Ex foam system for hangar bays. Existing hangars may continue use of AFFF fire protection systems. Provide draft curtains in the hangar bays per UFC 4- 211-1 Paragraph 3-3.1.10. Provide a foam inductor and concentrate tank per U

Official source: https://static.e-publishing.af.mil/production/1/afsoc/publication/afsoci32-1084/afsoci32-1084.pdf

## Supplement deltas

_No supplement passage retrieved — check the supplement chain before citing._

## Federal / DoD standards implemented (quoted)

_No federal/DoD passage retrieved._

## NFPA standards (cited by reference — copyrighted, not quoted)

- **NFPA 780** Installation of Lightning Protection Systems — cited by AFSOCI 32-1084 — official viewer: https://link.nfpa.org/free-access/publications/780/latest
- **NFPA 33**  — cited by AFSOCI 32-1084 — official viewer: https://link.nfpa.org/free-access/publications/33/latest

---
Retrieval confidence: 100.0 · CheckMyAFI is not an official Air Force product. Verify every citation against the certified publication.