# Compliance evidence pack (UNOFFICIAL)

- **Question:** UFC 3-410-02
- **Generated:** 2026-07-21 17:01 UTC
- **e-Publishing catalog checked:** 2026-07-12
- **Supplement layer:** none selected
- **Source:** CheckMyAFI (https://checkmyafi.com) — unofficial reference

> **UNOFFICIAL — VERIFY BEFORE CITING.** Quotes come from indexed copies of public publications. The certified PDF on e-Publishing is the only authoritative source. Your MAJCOM/unit supplement may be stricter.

## Synthesized answer (unofficial)

UFC 3-410-02 is titled "Direct Digital Control for HVAC and Other Building Control Systems" (current as of 18 July 2018, Change 2, 12 April 2021) [UFC 3-410-02]. It provides design guidance and requirements for Open Direct Digital Control Systems, with particularly detailed coverage due to the complex and definitive requirements involved [UFC 3-410-02].

This criteria document is mandated for use by Air Force installations: Installations must design HVAC and associated control systems in accordance with UFC 3-410-02 [AFI 32-1001 para 12.5]. The document was prepared jointly by the U.S. Army Corps of Engineers and Naval Facilities Engineering Command [UFC 3-410-02].

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.

## Controlling Air Force guidance (quoted)

**AFI 32-1001 para 12.5, p. 39** (effective/current as of 2025-03-04)

> tion. 12.4. Civil Engineer Maintenance Inspection and Repair Team (CEMIRT). CEMIRT will provide a quarterly data call for field support articulating CEMIRT capabilities and instructions to request support. At an installation’s request, CEMIRT will provide troubleshooting and recommendations to improve complex systems. CEMIRT will provide a formal report and out- brief to BCEs upon conclusion of installation visits. Installations will develop formal processes to ensure CEMIRT recommendations are evaluated, implemented, and tracked to completion. 12.5. Design Criteria. Installations must design HVAC & associated control systems that maintain temperatures in accordance with UFC 3-410-01, HVAC Design, and UFC 3-410-02, Direct Digital Control For HVAC And Other Building Control Systems, design

Official source: https://static.e-publishing.af.mil/production/1/af_a4/publication/afi32-1001/dafi32-1001.pdf

## Supplement deltas

_No supplement passage retrieved — check the supplement chain before citing._

## Federal / DoD standards implemented (quoted)

_No federal/DoD passage retrieved._

---
Retrieval confidence: 95.28 · CheckMyAFI is not an official Air Force product. Verify every citation against the certified publication.