# Compliance evidence pack (UNOFFICIAL)

- **Question:** UFC 3-350-07AN
- **Generated:** 2026-07-21 17:11 UTC
- **e-Publishing catalog checked:** 2026-07-12
- **Supplement layer:** none selected
- **Source:** CheckMyAFI (https://checkmyafi.com) — unofficial reference

> **UNOFFICIAL — VERIFY BEFORE CITING.** Quotes come from indexed copies of public publications. The certified PDF on e-Publishing is the only authoritative source. Your MAJCOM/unit supplement may be stricter.

## Synthesized answer (unofficial)

I can see from the passages that UFC 3-350-07AN is titled "HARDNESS VERIFICATION: DESIGNING FACILITIES TO RESIST NUCLEAR WEAPON EFFECTS" [UFC 3-350-07AN]. The document was originally dated 1 March 2005, with Change 2 issued on April 8, 2009, which changed the UFC number from 3-340-07AN [UFC 3-350-07AN]. It supersedes TM 5-858-6, dated 31 August 1984 [UFC 3-350-07AN], and was authorized by the U.S. Army Corps of Engineers, Naval Facilities Engineering Command, and Department of the Air Force [UFC 3-350-07AN].

However, the passages provided do not contain the substantive technical content or specific criteria from UFC 3-350-07AN itself—only its cover page, record of changes, and foreword information. To answer specific questions about hardness verification design criteria or nuclear weapon effects resistance requirements, the full body of UFC 3-350-07AN would be needed.

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.

## Controlling Air Force guidance (quoted)

**AFSOCI 32-1084 para 7.4.37** (effective/current as of 2023-02-21)

> tant drains. Applicable criteria include UFC 3-401-01 for mechanical & UFC 3-410-01 for HVAC. Electrical Industrial equipment typically requires 240- and 480-volt, three-phase electrical current. Use commercial grade convenience receptacles and special power outlets. Consult X-ray and other NDI equipment specifications for their specific power requirements. Applicable criteria include UFC 3-501-01 for general electrical requirements, UFC 3-520-01 for interior electrical systems requirements, UFC 3-530-01 for interior and exterior lighting and controls requirements, UFC 3-550-01 for exterior power distribution systems requirements, UFC 3-560-01 for electrical safety and electrical O&M requirements, UFC 3-580-01 for building telecommunications requirements, and UFC 4-021-01 for mass notifica

Official source: https://static.e-publishing.af.mil/production/1/afsoc/publication/afsoci32-1084/afsoci32-1084.pdf

## Supplement deltas

_No supplement passage retrieved — check the supplement chain before citing._

## Federal / DoD standards implemented (quoted)

_No federal/DoD passage retrieved._

## NFPA standards (cited by reference — copyrighted, not quoted)

- **NFPA 780** Installation of Lightning Protection Systems — cited by AFSOCI 32-1084 — official viewer: https://link.nfpa.org/free-access/publications/780/latest
- **NFPA 33**  — cited by AFSOCI 32-1084 — official viewer: https://link.nfpa.org/free-access/publications/33/latest

---
Retrieval confidence: 100.0 · CheckMyAFI is not an official Air Force product. Verify every citation against the certified publication.