# Compliance evidence pack (UNOFFICIAL)

- **Question:** UFC 3-220-08FA
- **Generated:** 2026-07-21 20:09 UTC
- **e-Publishing catalog checked:** 2026-07-12
- **Supplement layer:** none selected
- **Source:** CheckMyAFI (https://checkmyafi.com) — unofficial reference

> **UNOFFICIAL — VERIFY BEFORE CITING.** Quotes come from indexed copies of public publications. The certified PDF on e-Publishing is the only authoritative source. Your MAJCOM/unit supplement may be stricter.

## Controlling Air Force guidance (quoted)

**AFPAM 10-219 Volume 7 para 2.3.2.3.4** (effective/current as of 2008-06-09)

> Figure 2.13. The basic construction sequence for the direct fill process is shown in Figure 2.14. Specific geotextile application details are provided in FM 5-410 and UFC 3-220-08FA, Engineering Use of Geotextiles.AFPAM10-219V7 9 JUNE 2008 25 Figure 2.12. Comparison of Aggregate Depth Requirements. Figure 2.13. Using Geofabric to Separate Construction Materials.26 AFPAM10-219V7 9 JUNE 2008 Figure 2.14. Basic Geotextile Construction Sequence. 2.3.2.3.4. Choosing Geotextiles. A wide range of geotextile fabric is available to meet vari- ous soil conditions. Selection of the proper geot extile will depend on the actual soil and hydraulic conditions. The general soil conditions and considerations listed in Table 2.3. should provide some insight into selecting the optimum material. Further infor

Official source: https://static.e-publishing.af.mil/production/1/publication/afpam10-219v7/afpam10-219v7.pdf

## Supplement deltas

_No supplement passage retrieved — check the supplement chain before citing._

## Federal / DoD standards implemented (quoted)

_No federal/DoD passage retrieved._

---
Retrieval confidence: 100.0 · CheckMyAFI is not an official Air Force product. Verify every citation against the certified publication.