## Synthesized answer (unofficial)

FC 3-401-02N is the Facilities Criteria for Navy and Marine Corps Existing Building Commissioning, prepared by the Naval Facilities Engineering Systems Command and the Air Force Civil Engineer Center [FC 3-401-02N].

This document provides functional requirements for existing building commissioning (EBCx) activities specific to Navy and Marine Corps facilities. It is not a unified DoD requirement but applies only to those components [FC 3-401-02N Foreword]. The criteria are intended for use alongside DoD Unified Facilities Criteria (UFC), and for Air Force projects, commissioning compliance should reference UFC 1-200-02, which directs Navy projects to comply with FC 3-401-02N [UFC 1-200-02 para 3-3].

The document covers multiple commissioning phases, including the Hand-Off Phase with deliverables such as updated EBCx Reports, Systems Manuals, and Ongoing Commissioning Plans [FC 3-401-02N Chapter 7-8].

If you have a specific question about FC 3-401-02N's requirements, please ask and cite the section or topic you need clarified.

Unofficial — answered from indexed publication text, which may be incomplete or out of date. Your MAJCOM/unit supplement may be stricter. Verify the official PDF before acting or writing a finding.

## Controlling Air Force guidance (quoted)

**DAFI 91-204 para 5.3, p. 46** (effective/current as of 2025-07-16)

> thority will only be executed by a commander; it will not be delegated to a vice or deputy commander, or below wing/delta commander. (T-1) 5.2.4. If Convening Authority responsibility is transferred, the accounting organization remains the unit of assignment for the damaged assets or injured personnel. 5.3. Events Involving Multiple Commands. Involved MAJCOM/FC commanders will determine which MAJCOM/FC will assume investigative responsibility and advise AF/SE within 24 hours. In general, the MAJCOM/FC whose asset initiated the event will assume investigative responsibility. However, if initially unclear, the MAJCOM/FC sustaining the highest level of loss in the event will assume investigative responsibility. The MAJCOM/FC commander may determine other compelling reasons exist for assigning

Official source: https://static.e-publishing.af.mil/production/1/af_se/publication/dafi91-204/dafi91-204.pdf

**DAFI 36-2685 para 3.5.2, p. 16** (effective/current as of 2026-03-20)

> cal process. Note: ARC wing Command Chiefs will serve as the OPR and identify the appropriate member or position to manage these courses for their wing. 3.4.2. The DAs will conduct enough FC offerings to accommodate EPME prerequisite requirements for the installation and associated Geographically Separated Units (GSU) population. (T-1) 3.4.3. The DAs will execute FCs through IR or virtual IR synchronous delivery. Asynchronous training or DL does not meet the intent for the FC curriculum. 3.5. Foundations Course Tracking. 3.5.1. DAs will maintain student graduation rosters for a minimum of twelve months. DAs may provide certificates annotated with FC course codes and course title. 3.5.2. DAs will update Airmen’s FC completion in the Oracle Training Application (OTA) system of record based o

Official source: https://static.e-publishing.af.mil/production/1/af_a1/publication/dafi36-2685/dafi36-2685.pdf

## Supplement deltas

_No supplement passage retrieved — check the supplement chain before citing._

## Federal / DoD standards implemented (quoted)

**DoDI 2000.26** (effective/current as of 2019-12-04)

> vileges include the same privileges as user accounts as well as the ability to approve drafts SARs for release to an FC approver. (4) FC Approver. The FC approver account is reserved for the individuals assigned to an FC, whose duties are to evaluate incidents and perform other administrative functions with respect to the eGuardian system. The FC approver reviews and approves incidents to be released into the eGuardian system. An FC approver is a designated person who has received the required SAR analyst training. d. Application for Access Procedures. (1) Applications for access are routed through the respective DoD Component eGuardian program manager. (2) The program manager, or designated account manager, uses the “Pending Users” feature within eGuardian to approve or disapprove eGuardi

Official source: https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/200026p.pdf

---
Retrieval confidence: 100.0 · CheckMyAFI is not an official Air Force product. Verify every citation against the certified publication.